Question 2. Please submit any sites for employment and housing you wish to suggest for allocation in the Local Plan. Provide as much information and supporting evidence as possible.
Paddock / Shrub
No answer given
No answer given
Greenfield
9 Residential Units
No answer given
9 dwellings
No answer given
No uploaded files for public display
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
Agricultural Land / Building
No answer given
No answer given
Greenfield
Non residential development
No answer given
12000sqm to 15000sqm
No answer given
No uploaded files for public display
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No uploaded files for public display
Farmland
No answer given
No answer given
No answer given
Building on the success of Copley, we have developed a master plan and vision for the 100-acre site. Called Cambridge Woodlands Innovation Park, it addresses the need for a more open, inclusive approach that is also highly sustainable. It would also provide much-needed amenities in this part of Cambridge. The key features include: • network of woodland paths with swales and indigenous planting - inspired by Wandlebury Country Park which is likely to become increasingly busy as the population of Cambridge increases. • potential to provide a footbridge over the A1307 providing easy access from Wandlebury as well as off-road/cycle connections from Sawston to central Cambridge by upgrading existing public rights of way. • central lakeside pavilion housing a cafe, bistro, gym, nursery, and function rooms all open to companies on site as well as locals and visitors both during working hours as well as weekends and evenings. • modest, low-rise, eco-friendly buildings nestled amongst trees housing scientists and technologists using robotics and other state-of-the-art equipment in their pursuit of solutions to the challenges facing the world today. • it would accommodate a broad range of industries including environmental technology, automotive, aerospace, construction, materials, electronics, and engineering, alongside life science companies that do not meet the entry criteria for the major life science hubs. • it would accommodate a broad range of activities including design, research, development, prototyping and small scale production—facilitating the creation of tangible products as well as intellectual property; and creating jobs not just for people with degrees from Cambridge and beyond, but for those who are currently furthest from opportunities in the technology sector; this would provide meaningful career paths for individuals regardless of their educational background. • the co-location of multiple sectors on the site would help to foster cross-sector collaborations adding value to the existing life sciences cluster and helping to diversify the economy on the southern fringe.
No answer given
No answer given
No uploaded files for public display
Agricultural land/building, commercial/industrial, paddock/scrub, and residential.
No answer given
No answer given
Greenfield and previously developed land.
Up to 200 residential units, including market and affordable homes, older persons housing, and residential care homes. Ancillary uses and infrastructure would be provided to support the increased number of dwellings.
Ancillary uses and infrastructure would be provided to support the increased number of dwellings.
Proposing between 150 to 200 residential units.
No answer given
No uploaded files for public display
No information provided.
No information provided.
The site is not affected by flood risk.
The site contains or lies adjacent to key infrastructure (e.g., pipelines, pylons, electricity sub-stations). The site has access to key facilities.
The site contains or lies adjacent to key infrastructure (e.g., pipelines, pylons, electricity sub-stations).
The site is available between 0 and 5 years.
No information provided.
No information provided.
No answer given
No answer given
No answer given
No answer given
No answer given
Agricultural Land/Building
No answer given
No answer given
Greenfield
Residential
No answer given
Minimum 15 Units, Maximum 75 units.
No answer given
No uploaded files for public display
No answer given
No answer given
No answer given
Yes
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No uploaded files for public display
Agricultural land/building.
No answer given
No answer given
Greenfield land.
Proposing up to 30 market and affordable homes.
No accompanying uses are proposed.
Residential development of between 10 and 30 dwellings.
Within the Cambridge Green Belt.
No uploaded files for public display
No information provided.
No information provided.
The site is not affected by flood risk.
The site has access to key utilities.
The site does not contain, and is not adjacent to, key infrastructure (e.g., pipelines, pylons, electricity sub-stations).
The site will be available for development in the next 0 to 5 years.
No information provided.
No information provided.
No answer given
No answer given
No answer given
No answer given
No information provided.
No uploaded files for public display
Recreation and residential.
No answer given
No answer given
Previously developed land.
Proposing up to 7 residential units, including older persons housing and custom and self-build dwellings.
No accompanying uses.
Proposing up to 7 residential units.
No answer given
No uploaded files for public display
No information provided.
No information provided.
The site is not affected by flood risk.
The site has access to key facilities.
The site does not contain, and is not adjacent to, key infrastructure (e.g., pipelines, pylons, electricity sub-stations).
The site will be available for development in the next 0 to 5 years.
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No information provided.
No uploaded files for public display
Agricultural land/building.
No answer given
No answer given
Greenfield land.
Proposing up to 400 market and affordable homes covering an area of approx. 11.538ha. Part of the site (approx. 3.661ha) would be open space/BNG area.
Part of the site (approx. 3.661ha) would be open space/BNG area.
Proposing between 350 to 400 residential units.
No answer given
No uploaded files for public display
The site would be connected to the public highway (New Road) via a new vehicular access as shown on the Location Plan (Drawing No. TL 3944-C2966).
No information provided.
The site is not affected by flood risk.
The site has access to key utilities.
The site does not contain, and is not adjacent to, any key infrastructure (e.g., pipelines, pylons, electricity sub-stations).
The site will be available for development in the next 0 to 5 years.
No answer given
No information provided.
No answer given
No answer given
No answer given
No answer given
No answer given
No uploaded files for public display
The site currently comprises the following: Arable; 28 acres, Reservoir; 25 acres; and Ex gravel works/ amenity land; 54 acres
No answer given
No answer given
previously developed land
Non residential development
The following uses are to be delivered on the site as part of the redevelopment proposals; Data Centre (B8/ Sui Generis Use), Agricultural Education/ Engagement Centre, mixed use employment including plant science, indoor farming and Agri-Tech R&D uses, community uses (including Scouts HQ), engaging with local charities, sports facilities and public open space.
Minimum and Maximum employment floorspace 100,000 square meters
No answer given
No uploaded files for public display
No answer given
No answer given
No answer given
Site has access to key utilities
No answer given
No answer given
No answer given
No answer given
No answer given
Agricultural land/building.
No answer given
No answer given
Greenfield land.
Proposing up to 28 market and affordable homes.
No accompanying uses.
Proposing between 14 to 28 residential units.
The site is contained within the Cambridge Green Belt.
No uploaded files for public display
No information provided.
No information provided.
The site is not affected by flood risk.
The site has access to key utilities.
The site does not contain, and is not adjacent to, key infrastructure (e.g., pipelines, pylons, electricity sub-stations).
The site will be available for development in the next 0 to 5 years.
No information provided.
No information provided.
No answer given
No answer given
No answer given
No answer given
No information provided.
No uploaded files for public display
Agricultural Land / Building
N/A
No answer given
Greenfield
Residential
No answer given
Minimum number of residential units: 30 Maximum number of residential units: 50
Within the Cambridge Green Belt
No uploaded files for public display
No answer given
No answer given
Within the Cambridge Green Belt
Site has access to key utilities
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
Land to the rear of 145 to 149 High Street, Harston, CB22 7QD
0.85
Residential
Land to the rear of existing houses used as garden currently disused with buildings. Land previously used as paddock and for smallholding.
No answer given
Mixture - previously developed land and greenfield
Residential
No answer given
Minimum 5 units. Maximum 10 units.
No answer given
No uploaded files for public display
No answer given
No answer given
No answer given
Yes, the site has access to key utilities.
No answer given
Property within a single ownership and redevelopment can be undertaken immediately should the site be allocated for development.
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
Residential
Commercial market garden business housing 140m2 commercial greenhouse (still in situ) until approx 2016, after this no use – underutilised land in a highly sustainable location.
No answer given
Previously developed land
Development of 5-9 residential dwellings
No answer given
Minimum number of residential units: 5 Maximum number of residential units: 9
No answer given
No uploaded files for public display
No answer given
No answer given
No answer given
The site has access to key utilities
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
Agricultural Land / Building, Residential
No answer given
No answer given
Greenfield
Development of 5 residential units
No answer given
5 residential units
No answer given
No uploaded files for public display
No answer given
No answer given
No answer given
Yes, the site has access to key utilities.
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No uploaded files for public display
Recreation, Residential
Last used as a camp site
No answer given
Previously developed land
5 Residential dwellings
No answer given
5 residential units
Within the Cambridge Green Belt
No uploaded files for public display
No answer given
No answer given
Within the Cambridge Green Belt
Yes, the site has access to key utilities
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
Agricultural Land / Building, Paddock/Scrub, Residential
No answer given
No answer given
mixture
Residential
No answer given
75 units
No answer given
No uploaded files for public display
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
Agricultural Land/Building, Paddock/Scrub, Residential, Woodland/Orchard
No answer given
No answer given
mixture
Residential
No answer given
10 to 15 units
No answer given
No uploaded files for public display
No answer given
No answer given
No answer given
The site has access to key utilities
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No uploaded files for public display
Agricultural Land / Building; Paddock/Scrub; Residential
NONE
NONE
This site is greenfield and also previously developed land
Residential
The site is not affected by flood risk and it has access to key facilities.
Minimum 100 residential units to deliver and maximum 140 residential units
NONE
No uploaded files for public display
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No uploaded files for public display
Commercial / Industrial
No answer given
No answer given
Greenfield
Development of 15 residential dwellings
No answer given
15 residential units
No answer given
No uploaded files for public display
No answer given
No answer given
No answer given
Yes, the site has access to key utilities.
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
Car park and commercial/industrial
No answer given
No answer given
Previously developed land
Mixed use
No answer given
120 residential units 6000 square meters of commercial
No answer given
No uploaded files for public display
No answer given
No answer given
No answer given
The site has access to key utilities
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
Agricultural Land
No answer given
No answer given
Greenfield
Non-residential
No answer given
5000 to 10000 square meters
No answer given
No uploaded files for public display
No answer given
No answer given
No answer given
The site has access to key utilities
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No uploaded files for public display
Agricultural Land/Building
No answer given
No answer given
No answer given
Mixed-use
No answer given
up to 93000 square meters of employment floorspace 2500 to 3500 residential units
No answer given
No uploaded files for public display
No answer given
No answer given
No answer given
The site has access to key utilities
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
Agricultural Land / Building
No answer given
No answer given
Greenfield
Development of 50-70 residential dwellings
No answer given
Minimum number of residential units: 50. Maximum number of residential units: 70.
No answer given
No uploaded files for public display
No answer given
No answer given
No answer given
Yes, the site has access to key utilities.
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
Residential, Paddock / Scrub
No answer given
No answer given
Greenfield
Development of 50 - 70 residential dwellings
No answer given
Minimum number of residential units: 50. Maximum number of residential units: 70
No answer given
No uploaded files for public display
No answer given
No answer given
No answer given
Yes, the site has access to key utilities.
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
LAND EAST OF HAUXTON PRIMARY SCHOOL AND SOUTH OF, HIGH STREET, HAUXTON, CB22 5JB
This site is 3.75: this site is now 12.72
Agricultural Land/Building
No answer given
No answer given
Greenfield
Residential
240 to 280 dwellings, inclusive of up to 50% affordable housing as per the Golden Rules contained within the National Planning Policy Framework (December 2024, as amended Feb 2025), open space, sustainable drainage, and biodiversity enhancements.
240 to 280 dwellings, inclusive of up to 50% affordable housing as per the Golden Rules contained within the National Planning Policy Framework (December 2024, as amended Feb 2025), open space, sustainable drainage, and biodiversity enhancements.
Flood Risk
No uploaded files for public display
No answer given
No answer given
Flood Risk
Yes it has access to key utilities
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
Agricultural Land, Paddock/Scrub
Former Nursery
No answer given
Previously developed land
Residential
No answer given
40 to 50 units
No answer given
No uploaded files for public display
No answer given
No answer given
No answer given
The site has access to key utilities
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
Land to east of Horningsea Road & west of Ditton Lane, Fen Ditton
83.46
Agricultural Land
No answer given
No answer given
Greenfield
Residential
No answer given
1500 residential units
No answer given
No uploaded files for public display
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
Agricultural Land / Building
No answer given
No answer given
Greenfield
Residential
425 to 525 units
No answer given
No answer given
No uploaded files for public display
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
Car Park, Commercial/Industrial
The site is subject to an extant planning permission but is currently used for over spill car parking.
No answer given
Previously developed land
Non-residential - for office or research and development space
No answer given
Minimum employment floorspace: 4000 square metres. Maximum employment floorspace: 6000 square metres.
Flood risk
No uploaded files for public display
No answer given
No answer given
Flood risk
The site does have access to key utilities
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given