It is noted that the existing defined settlement boundaries for most villages in South Cambridgeshire have remained largely unchanged since the Local Plan 2004; although sites were allocated within and on the edge of some villages in the Site Specific Allocations DPD in 2010 and for the adopted South Cambridgeshire Local Plan 2018. It is very likely that most of the development opportunities within existing village boundaries have been taken up by now. It is also likely that heritage assets within villages, such as conservation areas and listed buildings, will constrain development opportunities. It is not clear whether the Councils have undertaken an assessment of the capacity of villages to accommodate additional development; it is likely that such an assessment would demonstrate that the capacity is limited. This is certainly considered to be so in the case of Papworth Everard On the basis of the above, it is considered that the current site size threshold limits in the adopted South Cambridgeshire Local Plan 2018 are largely irrelevant and ineffective e.g. there are few outstanding development opportunities for up to 30 dwellings within existing framework boundaries in Minor Rural Centres, and Papworth Everard is an example where there are few opportunities within the boundary. In any event, there are numerous examples between 2014 and 2019 when planning applications were approved and appeals were allowed on sites within and on the edge of settlements that were contrary to the existing site size threshold limits. Therefore, it is considered that the emerging GCLP should seek to allocate suitable sites on the edge of existing sustainable villages, in conjunction with a general policy that supports development within existing framework boundaries but without specifying any size limits. This suggested approach would ensure that sufficient land is allocated for development at villages to support services and facilities and ensure that sufficient physical and community infrastructure can be planned, and would provide some flexibility about development within village boundaries so that the form and scale of development reflects site specific characteristics. In a Papworth context, such an approach would also ensure sufficient growth is delivered to meet the existing and future housing need and specifically affordable housing need which, as se out above, currently stands at 56 dwellings and which is likely to growth in the future. If future growth is constrained, this unmet affordable housng need will remain.

No uploaded files for public display

Form ID: 48731
Respondent: Bloor Homes Eastern
Agent: Carter Jonas

Strongly agree. Particularly where these villages are well-connected via transport corridors. Paragraph 102 of the NPPF expects transport issues to be considered at the earliest stages of plan-making. Those issues include opportunities created by existing or proposed transport infrastructure in terms of the scale, location and density of development, and opportunities to promote walking, cycling and public transport use. Paragraph 103 expects significant development to be focused on locations which are or can be made sustainable. Papworth Everard is defined as a Minor Rural Centre in South Cambridgeshire District Council's current settlement hierarchy and therefore sits towards the top of the Council’s settlement hierarchy. Papworth Everard contains an extensive range of services and facilities including a convenience store, hairdressers, fish and chip shop, coffee shop and a restaurant, a primary school, children’s nurseries, post office, library, doctor’s surgery/health centre, veterinary surgery, churches and village hall. Development has also commenced to deliver a bakery, microbrewery and Public House on the former print works site, south of Church Lane. Accessibility to these services from the site is illustrated on the submitted drawings produced by MLM. As will be noted – see Connections Plan, the site is very well connected to existing services and facilities within the village. Papworth Hospital has previously been the main employer in the village although the facilities and functions of the hospital have now been relocated. The former hospital site is however positively promoted within the adopted plan for future employment generating uses. Papworth Business Park, located at the southern edge of the village, is the main employment area. The services, facilities and employment opportunities which exist within Papworth Everard are all reflective of its designation as a Minor Rural Centre. Where people do need to travel out of the village, access to an established bus service which provides connections from the village to Cambourne, St Neots, Cambridge, Huntingdon and St Ives. The main bus route is provided by the X3 bus. While this service currently provides an hourly service, there are gaps in the timetable during the AM and PM peak hour. As a result it is very difficult for residents of Papworth to utilise this as a commuter service. It was therefore agreed with the operator during the consideration of the previous applications on the site that the development would deliver enhancements to the service to provide additional services in the AM and PM peak hours. In addition to the above, Cambridgeshire County Council are seeking to deliver a cycle and pedestrian link from Papworth to Cambourne. It is the County Council’s intention to deliver a 2m wide cycle path along the eastern side of the A1198 to provide a link between the existing cycle path located north of the A1198/A428 junction, and the existing footpath network at the southern point of Papworth. The County’s programme for delivering this connection are not known at this time, it was however agreed that the previous applications would contribute towards the delivery of this link. When delivered, it will provide a direct cycle link to Cambourne and all of the facilities provided within it. Papworth Everard and land to the east of the Ridgeway and Old Pinewood Way, Papworth Everard are sustainably located to accommodate much needed new housing development which will also ensure the existing facilities and services within the village are supported. This accords with paragraph 78 of the NPPF which seeks to promote sustainable development in rural areas and acknowledges the role that housing has in enhancing or maintaining the vitality of rural communities and supporting local services. The proposed development would also deliver a number of benefits including significant areas of public open space, green infrastructure and biodiversity enhancements. The protected trees within the site would be retained and significant new woodland planting would take place. The proposals would also include for the benefits that were associated with the previous proposal for the site including: reserve land for a pre-school facility; contributions towards primary and secondary school provision; library contribution; contribution for improvements to Papworth Surgery; enhancements to off-site public footpaths; enhancements to bus services to deliver an additional service in the peak hour; contributions towards cycle and pedestrian links between Papworth Everard and Cambourne.

No uploaded files for public display

Form ID: 51047
Respondent: Bloor Homes Eastern
Agent: Carter Jonas

Land west of Linton

20.05

Site 51047 map

Agricultural land including agricultural buildings.

N/A

None

Greenfield

Housing – The site could provide up to 450 residential units (Use Class C3) including affordable housing and potentially self-build plots. 2025: The site is capable of delivering 250 - 280 homes The land could also accommodate green infrastructure including open space and ecological enhancements in conjunction with development. A new and updated access to serve the development would be provided from the A1307 Cambridge Road.

Market and affordable housing , Custom or self build housing

Public open space

Please describe any benefits to the local area that the development could provide: The proposed development would provide affordable housing to meet local needs of the village; in 2018 there was an identified need for 81 affordable dwellings in Linton for those with a local connection to the village – see South Cambridgeshire District Council's 'Housing Statistical Information Leaflet' (December 2018). The proposed development would support the existing services and facilities in Linton. The proposed development could include open space with public access, and ecological enhancement. Subject to compliance with CIL Regulations at the planning application stage any development may also provide planning appropriate obligations towards improving local infrastructure e.g. public transport facilities, schools, GPs and other community facilities.

The dwelling estimate is informed by knowledge of site conditions/characteristics and experience from other sites developed by Bloor Homes within South Cambridgeshire and other districts. 2025: The site is capable of delivering 250 - 280 homes

Not Specified.

No uploaded files for public display

Yes (Please give details)

A Transport & Highways Access Appraisal has been prepared for the proposed development. A new vehicular access, junction arrangements and traffic signal controls would need to be provided at the site access with the A1307 Cambridge Road to accommodate the proposed development. There is sufficient land available to alter the junction arrangements in order to provide a safe vehicular access with suitable visibility splays and pedestrian/cycle access and routes. The access arrangements would meet current highway standards.

No

Not Specified.

No

Details: The site is located within Flood Zone 1 which means it has a low probability of flooding. A Flood Risk Assessment has been prepared for the site. The ground conditions at the site are likely to be suitable for infiltration drainage and sustainable drainage systems (SuDS) to manage surface water drainage from the proposed development. An initial ecological assessment of the site has confirmed that there would not appear to be any significant ecological constraints that would preclude the development of the site. The proposed development will seek to retain any ecological features on site and include mitigation measures and ecological enhancement measures within the design and layout. A tree survey and arboricultural impact assessment is scheduled to be undertaken because there are trees and hedgerows at the site boundary. The trees and hedgerows could be retained as part of the proposed development. An initial Landscape Analysis has been undertaken of the site and for the proposed development. The design and layout of the proposed development would maintain long distance views across the site and would maintain the open views from public footpaths. There are a number of listed buildings within Little Linton Farmhouse to the north of the site, and buildings at Linton Village College to the east of the site are also listed. The setting of these listed buildings will need to be protected and enhanced by development at the site. It would be possible to locate the proposed dwellings at the site to avoid the setting of these heritage assets. An Initial Noises Assessment has been undertaken for the site, and mitigation measures have been identified to address potential noise impacts on the proposed development. In summary, the Assessment recommends mitigation measures to address noise impacts from traffic movements on the A1307, including a noise buffer and acoustic bunds along the road frontage in order to protect residential amenity. As outlined above a wide range of technical/ site investigation work has either been completed or is currently underway. This information has been incorporated into the accompanying Vision Document with any additional information shared with the Local Planning Authority (LPA) when available. The developer is keen to engage with the LPA and other statutory consultees to discuss both the technical information and to agree a strategy for progressing further with development proposals on the site.

Details: There is an overhead high voltage network passing through the western part of the site, including high voltage cables and a pylon located in the north west corner of the site. The proposed development will need to include an easement from the high voltage cables. boundary. A Utilities Assessment has been prepared for the site. The proposed development will need to provide new utilities infrastructure, but there are services to the neighbouring urban area and uses and so connections will be possible.

Yes (Please give details)

Details: There is an overhead high voltage network passing through the western part of the site, including high voltage cables and a pylon located in the north west corner of the site. The proposed development will need to include an easement from the high voltage cables. boundary. A Utilities Assessment has been prepared for the site. The proposed development will need to provide new utilities infrastructure, but there are services to the neighbouring urban area and uses and so connections will be possible.

Available now

The site is promoted by a willing landowner and is controlled by a housebuilder, and it is both available and deliverable for development. The site will need to be allocated for development through the Greater Cambridge Local Plan, and the timetable for this has informed the assessment of when the site is available.

Site is under option by a developer

In your opinion, what is the market attractiveness of the site at the current time? It is anticipated that the site will be attractive to the market, because other sites in Linton have been subject to strong demand from developers and housebuilders. Key fact- Bloor a developer has placed the site under option. It is considered developable and viable.

No

N/A

N/A

2023

2031

8

No

N/A

No

Form ID: 51048
Respondent: Bloor Homes Eastern
Agent: Carter Jonas

Natural Cambridgeshire’s Developing with Nature Toolkit seeks to achieve a net gain in biodiversity through new development. It is agreed that development, and in particular large-scale development with sufficient land available, can deliver significant biodiversity enhancements. It is suggested that in deciding sites to allocate for development the emerging GCLP assesses not only whether the potential impacts on protected species and habitats can be mitigated but also whether development can deliver biodiversity enhancements. The promoted development at land west of Linton would retain any ecological features on site and seek to provide ecological enhancements. It should be noted that there is sufficient space within the site to include those ecological enhancement measures on site in conjunction with development. The promoted development could achieve a net gain in biodiversity.

No uploaded files for public display

Form ID: 51049
Respondent: Bloor Homes Eastern
Agent: Carter Jonas

It is considered that meeting housing and affordable housing needs is part of the well-being and social inclusion theme because housing falls within the social objective of sustainable development (as set out in Paragraph 8 of the NPPF). There are substantial affordability issues in Greater Cambridge associated with the high cost of buying and renting housing, and those that cannot afford to live in Cambridge or South Cambridgeshire close to employment opportunities having to endure longer commuting. Paragraph 8 and Chapter 8 of the NPPF identifies the other factors that relate to the wellbeing and social inclusion theme, which are about creating well-designed and safe developments, providing access to services and facilities, and providing open space. It is suggested that to achieve ‘good growth’ the emerging GCLP will need to allocate suitable sites that deliver housing and affordable housing, are accessible to services and facilities, include open space and recreation facilities. The promoted development at land west of Linton would provide additional housing and affordable housing for Linton. There are limited opportunities for infill development within the development framework boundary of the village, and residential developments have been granted planning permission on sites outside the boundary in the last few years. The proposed development would include significant areas of public open space, green infrastructure and biodiversity enhancements. This approach to the proposed development would ensure that the proposals created an environment that would have a positive impact on the well-being of future residents. The proposed development would also support existing services and facilities in Linton. Linton is defined as a Minor Rural Centre in South Cambridgeshire District Council's current settlement hierarchy and therefore sits towards the top of the Council’s settlement hierarchy. It is considered that the promoted developments would contribute towards ‘good growth’ for Linton and for Greater Cambridge.

No uploaded files for public display

Form ID: 51050
Respondent: Bloor Homes Eastern
Agent: Carter Jonas

Section 4.3.3 of the Issues & Options consultation document identifies the factors that are relevant to the creation of safe and inclusive communities. As set out in the response to Question 16, there are substantial affordability issues in Greater Cambridge associated with the high cost of buying and renting housing, and those that cannot afford to live in Cambridge or South Cambridgeshire close to employment opportunities having to endure longer commuting. It is considered that the emerging GCLP should include a development strategy that seeks to meet housing and affordable housing needs and locate housing closer to employment opportunities to reduce in-commuting.

No uploaded files for public display

Form ID: 51051
Respondent: Bloor Homes Eastern
Agent: Carter Jonas

Paragraph 91 of the NPPF seeks to deliver healthy, inclusive and safe places, and identifies a number of approaches to support healthy lifestyles. It promotes social interaction through mixed-use developments, strong neighbourhood centres, street layouts that include pedestrian and cycle connections, and active street frontages for example. It enables and supports healthy lifestyles, by providing green infrastructure, sports facilities, local shops, access to healthier food, allotments, and layouts that encourage walking and cycling for example. NHS England Healthy Towns Initiatives identified ten principles to deliver healthy places, which relate to the provision of health services, meeting local and community health needs, and development design matters. In terms of design matters it is suggested that compact neighbourhoods, active travel, healthy eating opportunities, play and leisure facilities would contribute towards the delivery of healthy places. It is considered that the promoted development in Linton would be consistent with guidance and initiatives to support healthy lifestyles. As set out the call for sites submissions, the promoted developments would include open space and green infrastructure. The site is accessible to the services and facilities within Linton by walking and cycling, and the promoted development would retain the existing public rights of way through the site and provide new cycle and footpath facilities. It would be well-related to the transport infrastructure improvements proposed in the Greater Cambridge Partnership’s Cambridge South East Transport project, including cycle routes to Granta Park and Babraham Research Campus, travel hubs, and the new public transport route into Cambridge. Linton greenway. There are outdoor recreation areas, a sport centre, doctor’s surgery, dentist and pharmacy in the village, which are all related to supporting healthy lifestyles.

No uploaded files for public display

Form ID: 51052
Respondent: Bloor Homes Eastern
Agent: Carter Jonas

The emerging GCLP will need to be consistent with national guidance on meeting housing needs. Paragraph 59 of the NPPF confirms the Government’s objective to significantly boost the supply of housing, and to achieve this by ensuring that a sufficient amount and variety of land for housing is identified. Paragraph 60 expects the standard method to be used to determine the minimum number of houses needed. Paragraph 61 expects the size, type and tenure of housing needs of the community to be assessed and reflected in planning policies, including for example those with an affordable housing need, students, renters and self-builders. Section Id.2a of the Planning Practice Guidance explains how housing and economic needs assessments should be undertaken, including how to calculate local housing needs using the standard method. Paragraph 010 of Id.2a makes it clear that the standard method is the minimum starting point for determining local housing needs, and acknowledges that there may be circumstances where actual housing need is higher than the standard method indicates. As set out in Paragraph 010 the circumstances where increases to housing need that exceed past trends are as follows: there is a growth strategy in place to promote and facilitate additional growth; strategic infrastructure improvements are likely to lead to an increase in the number of homes needed locally; and, an authority has agreed to accommodate unmet housing needs from a neighbouring area. The first two circumstances are relevant to Greater Cambridge. Paragraph 024 of Id.2a explains how the need for affordable housing is calculated, and it is suggested that the overall housing target should be increased where it could help deliver the required number of affordable homes. There is an urgent need to improve the affordability of housing and to boost affordable housing delivery in Greater Cambridge. Therefore, the emerging GCLP should use the standard method to calculate the minimum local housing need, and then make appropriate adjustments taking into account the growth strategies and strategic infrastructure improvements identified for Greater Cambridge, and a further adjustment to ensure affordable housing needs are met.

No uploaded files for public display

Form ID: 51053
Respondent: Bloor Homes Eastern
Agent: Carter Jonas

Nothing chosen

Yes. As set out in the response to Question 31, upward adjustments to the minimum figure derived from the standard method are required to take into account growth strategies, strategic infrastructure improvements and housing affordability in Greater Cambridgeshire. The National Infrastructure Commission, the Cambridge and Peterborough Combined Authority and the Greater Cambridge Greater Peterborough Enterprise Partnership acknowledge and support the economic growth potential of the Greater Cambridge area, and consider that there is a need to substantially increase housing delivery in order to support that economic growth and address the significant housing affordability issues that exist.

No uploaded files for public display

Form ID: 51054
Respondent: Bloor Homes Eastern
Agent: Carter Jonas

Paragraph 61 of NPPF expects the size, type and tenure of housing needs of the community to be assessed and reflected in planning policies, including for example those with an affordable housing need, students, renters and self-builders. It is noted that the existing and planned new settlements in South Cambridgeshire and some of the strategic sites are not delivering policy compliant levels of affordable housing. As such, it is considered that emerging GCLP should seek to allocate sites which are capable of delivering policy compliant levels of affordable housing. The promoted development at land off Cambridge Road in Linton includes housing and affordable housing, and a mix of house types and sizes. The promoted development would provide policy compliant levels of affordable housing to meet local needs of the village. In 2018 there was an identified need for 81 affordable dwellings in Linton for those with a local connection to the village – see South Cambridgeshire District Council's 'Housing Statistical Information Leaflet' (December 2018); the recent and approved residential developments in Linton would not meet the identified need for affordable housing.