WS/MU: Meanwhile uses during long term redevelopments

Showing comments and forms 1 to 17 of 17

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 56631

Received: 25/11/2021

Respondent: Gamlingay Parish Council

Representation Summary:

Vacant buildings are a wasted resource- support policies which allow for temporary use as long as the new use is compatible with the surrounding area . Gamlingay First school buildings (Green end Gamlingay SG19 3LF) have been vacant for 4 years and there is demand for preschool facilities in the village. County Council owned.

Full text:

Vacant buildings are a wasted resource- support policies which allow for temporary use as long as the new use is compatible with the surrounding area . Gamlingay First school buildings (Green end Gamlingay SG19 3LF) have been vacant for 4 years and there is demand for preschool facilities in the village. County Council owned.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 56903

Received: 08/12/2021

Respondent: Save Honey Hill Group

Representation Summary:

Endorse in part. Care must be taken to prevent meanwhile use on sites proposed on Green Belt while waiting for consents to prevent incursion into the Green Belt contrary to Policy GP/GB Protection and Enhancement of the Cambridge Green Belt and cause unjustified damage if applications fail.
IFor Policy S/NEC North East Cambridge, consideration should be given to established businesses, including those on Nuffield Road, support should be given them to maintain businesses as long as possible and in finding a new site.
Concentrate meanwhile use on low carbon projects, minimal CO2 producing construction providing green space, vandalism proofed.

Full text:

Endorse in part. Care must be taken to prevent meanwhile use on sites proposed on Green Belt while waiting for consents. Such use would be incursion into the Green Belt and contrary to Policy GP/GB Protection and Enhancement of the Cambridge Green Belt and could cause unjustified damage should the applications fail.
In the case of Policy S/NEC North East Cambridge, consideration should be given to established businesses, including those on Nuffield Road, which would vacate the site when development starts and support should be given them to maintain businesses as long as possible and in finding a new site.
Where possible meanwhile use should concentrate on low carbon use, minimal CO2 producing construction and where possible provide green space, adequately maintained to prevent vandalism.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 56983

Received: 09/12/2021

Respondent: Trumpington Residents Association

Representation Summary:

The Trumpington Residents' Association supports the policy. In the case of the Southern Fringe developments, there are a number of shop units in the Trumpington Meadows local centre and in Hobson Square that have remained unused for a number of years and where it would have been very beneficial to have opportunities to use them for community and art initiatives.

Full text:

The Trumpington Residents' Association supports the policy. In the case of the Southern Fringe developments, there are a number of shop units in the Trumpington Meadows local centre and in Hobson Square that have remained unused for a number of years and where it would have been very beneficial to have opportunities to use them for community and art initiatives.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 57388

Received: 10/12/2021

Respondent: Persimmon Homes East Midlands

Representation Summary:

The proposed policy direction of Policy WS/MU is that it will seek meanwhile uses on vacant sites where a longer term use is still being resolved. Persimmon Homes understand the rationale for the policy and are of the view that such a requirement should be encouraged in the wording of the policy wording and not be a mandatory requirement. There are so many factors which could impact on the capability of a site to accommodate meanwhile uses which could not be factored into such a policy, for example, sites not being served by the necessary infrastructure.

Full text:

The proposed policy direction of Policy WS/MU is that it will seek meanwhile uses on vacant sites where a longer term use is still being resolved. Persimmon Homes understand the rationale for the policy and are of the view that such a requirement should be encouraged in the wording of the policy wording and not be a mandatory requirement. There are so many factors which could impact on the capability of a site to accommodate meanwhile uses which could not be factored into such a policy, for example, sites not being served by the necessary infrastructure.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 57409

Received: 10/12/2021

Respondent: Huntingdonshire District Council

Representation Summary:

Huntingdonshire District Council support the policy of providing temporary spaces, buildings and uses during the initial stages of the development, which could help to provide temporary community infrastructure early on in the development process. This will reduce the impact on infrastructure in the surrounding areas.

Full text:

Huntingdonshire District Council support the policy of providing temporary spaces, buildings and uses during the initial stages of the development, which could help to provide temporary community infrastructure early on in the development process. This will reduce the impact on infrastructure in the surrounding areas.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 57616

Received: 11/12/2021

Respondent: Mr J Pratt

Representation Summary:

Endorse in part. Care must be taken to prevent meanwhile use on sites proposed on Green Belt while waiting for consents. Such use would be incursion into the Green Belt and contrary to Policy GP/GB Protection and Enhancement of the Cambridge Green Belt.

Full text:

Endorse in part. Care must be taken to prevent meanwhile use on sites proposed on Green Belt while waiting for consents. Such use would be incursion into the Green Belt and contrary to Policy GP/GB Protection and Enhancement of the Cambridge Green Belt.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 57717

Received: 11/12/2021

Respondent: Bassingbourn-cum-Kneesworth Parish Council

Representation Summary:

We support this policy.

Full text:

We support this policy.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 57881

Received: 12/12/2021

Respondent: Histon & Impington Parish Council

Representation Summary:

As long as it is safe to do so, fine. Where greenspaces are closed, signpost where the nearest one is. Do not close too many greenspaces in the same area at anyone time so spaces are still available.

Full text:

As long as it is safe to do so, fine. Where greenspaces are closed, signpost where the nearest one is. Do not close too many greenspaces in the same area at anyone time so spaces are still available.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 58005

Received: 12/12/2021

Respondent: Jo Humphrey

Representation Summary:

I very much support the idea of seeking meanwhile uses on vacant sites or in underused buildings. One user group that could particularly benefit from this could be skaters (young people primarily, but also a growing number of adult roller skaters who have picked up the sport during the pandemic). Meanwhile use could be a perfect opportunity in the winter months to provide some temporary indoor skate space, which is sorely lacking in Cambridge. Wet weather and low visibility prevents skating from taking place outdoors in winter. Providing a safe and dry place for skating would be a real boon.

Full text:

I very much support the idea of seeking meanwhile uses on vacant sites or in underused buildings. One user group that could particularly benefit from this could be skaters (young people primarily, but also a growing number of adult roller skaters who have picked up the sport during the pandemic). Meanwhile use could be a perfect opportunity in the winter months to provide some temporary indoor skate space, which is sorely lacking in Cambridge. Wet weather and low visibility prevents skating from taking place outdoors in winter. Providing a safe and dry place for skating would be a real boon.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 58117

Received: 12/12/2021

Respondent: Mr George Gardner

Representation Summary:

"This policy will seek meanwhile uses on vacant sites or in underused buildings as part of the phased development of major development sites and within other vacant sites and premises where a longer-term use is still being resolved."
This is something Cam-Skate can really get behind. Vacant sites are no good to anybody. Cambridge has a real lack of indoor skateboarding facilities. It seems private owners simply can't justify the risk of building an indoor one for fear of losing money. An indoor/covered park would be tremendous use of an otherwise vacant site for skaters during the winter months.

Full text:

"This policy will seek meanwhile uses on vacant sites or in underused buildings as part of the phased development of major development sites and within other vacant sites and premises where a longer-term use is still being resolved."
This is something Cam-Skate can really get behind. Vacant sites are no good to anybody. Cambridge has a real lack of indoor skateboarding facilities. It seems private owners simply can't justify the risk of building an indoor one for fear of losing money. An indoor/covered park would be tremendous use of an otherwise vacant site for skaters during the winter months.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 58725

Received: 13/12/2021

Respondent: University of Cambridge

Representation Summary:

We agree that policy should seek meanwhile uses on vacant sites or in underused buildings, as part of the phased development of major development sites and within other vacant sites and premises where a longer-term use is still being resolved, in order to support the local community and contribute to the vibrancy of the area as new communities develop.

Full text:

We agree that policy should seek meanwhile uses on vacant sites or in underused buildings, as part of the phased development of major development sites and within other vacant sites and premises where a longer-term use is still being resolved, in order to support the local community and contribute to the vibrancy of the area as new communities develop.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 58847

Received: 13/12/2021

Respondent: CBC Limited, Cambridgeshire County Council and a private family trust

Agent: Quod

Representation Summary:

CBC and the landowners support the inclusion of a policy encouraging temporary, meanwhile uses for large-scale developments. Such uses can help to engage communities, offer a more agile and responsive way to test demand and services before permanent commitments, and help to enliven spaces that would otherwise be barren. But they are seldom financially viable in themselves and so, while important to placemaking, must be seen in the wider challenge of realising viable, sustainable developments. There is potential for the future Campus development to take a phased approach to the development, identifying the opportunities for meanwhile uses through phased expansion.

Full text:

CBC and the landowners support the inclusion of a policy encouraging temporary, meanwhile uses for large-scale developments. Such uses can help to engage communities, offer a more agile and responsive way to test demand and services before permanent commitments, and help to enliven spaces that would otherwise be barren. But they are seldom financially viable in themselves and so, while important to placemaking, must be seen in the wider challenge of realising viable, sustainable developments. There is potential for the future Campus development to take a phased approach to the development, identifying the opportunities for meanwhile uses through phased expansion.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59186

Received: 13/12/2021

Respondent: Cambridgeshire and Peterborough Clinical Commissioning Group (CCG)

Agent: NHS Property Services Ltd

Representation Summary:

Support for principle of meanwhile uses, and NHS services being included within this policy.

Emphasise the need for developers to provide (at their own cost) flexible short term solutions for the NHS to deliver services for new residents whilst wider development is taking place.

Full text:

Support for principle of meanwhile uses, and NHS services being included within this policy.

Emphasise the need for developers to provide (at their own cost) flexible short term solutions for the NHS to deliver services for new residents whilst wider development is taking place.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59231

Received: 13/12/2021

Respondent: Cambourne Town Council

Representation Summary:

Cambourne Town Council understands the need for this policy as it addresses the aims contained in the vision.

Full text:

Cambourne Town Council understands the need for this policy as it addresses the aims contained in the vision.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 60154

Received: 13/12/2021

Respondent: U&I PLC and TOWN

Agent: Carter Jonas

Representation Summary:

SUPPORT We support the inclusion of a Meanwhile Use policy and agree that it can play an important role on
strategic development sites. Phases of development can occur over a significant period of time, and
therefore utilisation of vacant/redundant land/buildings for social and/or economic purposes can help
activate an area and provide short/medium term benefits that might not otherwise be realised.

Full text:

NORTH-EAST CAMBRIDGE ‘CORE SITE’, COWLEY ROAD,
CAMBRIDGE


GREATER CAMBRIDGE LOCAL PLAN 'FIRST PROPOSALS' (REG 18)

Written Response on behalf of U&I PLC / TOWN

Monday, 13 December 2021


Classification L2 - Business Data



CONTENTS




0.0 INTRODUCTION 1
1.0 POLICY RESPONSE 2


0.0 INTRODUCTION

0.1 This document sets out written representations on behalf of U+I / TOWN, to a formal consultation by Greater Cambridge Shared Planning Services (‘GCSP’) on the Greater Cambridge Local Plan ‘First Proposals’ (Preferred Options, Regulation 18, 2021) (‘First Proposals’).
0.2 U+I and TOWN have been selected by Anglian Water and Cambridge City Council (as landowners) to act as Master Developer for the comprehensive redevelopment of the existing Waste Water Treatment Works (‘WWTW’), council depot and golf driving range (to be referred collectively as ‘the Core Site’), for the delivery of approximately 5,500 homes, 23,500m2 of new business space, 13,600m2 of new shops, community, leisure and recreation space (as currently set out in the North East Cambridge Area Action Plan (‘NEC AAP’) Proposed Submission Regulation 19 document). For the avoidance of doubt, these representations are submitted on behalf of U+I and TOWN as master developers rather than the landowners themselves.

0.3 Regeneration of the Core Site will be facilitated by the relocation of the WWTW, which will be funded from the Homes England’s Housing Infrastructure Fund, and which is currently going through a Development Consent Order approval process. Anglian Water will be submitting separate representations to the First Proposals, on this specific element.

0.4 U+I/TOWN have been actively involved in the policy formation process of the NEC AAP and are therefore looking to ensure there is policy consistency between the NEC AAP Proposed Submission and First Proposals documents.

0.5 Consideration will need to be given to the prospect of policy inconsistencies between the Greater Cambridge Local Plan (‘GCLP’) and NEC AAP.

0.6 As a point of broad principle, we would request that relevant GCLP policy (particularly where performance standards are stated) provides appropriate wording that defers to more area/site-specific policy, where it is being formed in other Development Plan Documents, such as NEC AAP. In the event of any inconsistency, this will ensure that there is a clear understanding over which policy takes preference. For instance, if a 20% biodiversity net gain (‘BNG’) target is ultimately adopted in GCLP policy, and a minimum 10% BNG is sought in NEC AAP, then there would be a clear signal in the GCLP policy that the NEC AAP policy is the correct standard to apply.



1.0 POLICY RESPONSE

Policy S/JH: Level of Jobs and Housing
OBJECT
1.1 The Cambridgeshire and Peterborough Devolution Deal committed to delivering substantial economic growth and to double economic output during the next 25 years. The Cambridge and Peterborough Combined Authority and the Greater Cambridge Greater Peterborough Enterprise Partnership acknowledge and support the economic growth potential of the Greater Cambridge area and consider that there is a need to substantially increase housing delivery in order to support economic growth (that is needed to meet the objective of doubling GVA by 2040) and address the significant housing affordability issues that exist (Cambridgeshire and Peterborough Independent Economic Review). At present there is an imbalance between rates of economic growth and housing delivery in Greater Cambridge.
1.2 These factors support a significantly higher number of homes than are proposed in the preferred ‘medium plus’ growth option of Policy S/JH. It is considered that the ‘medium plus’ growth option makes insufficient upward adjustments to the housing requirement (from Section Id.2a of the Planning Practice Guidance) to take into account growth strategies, strategic infrastructure improvements and housing affordability in Greater Cambridge.
1.3 It is suggested that the emerging GCLP should have selected the higher growth level option to support economic growth, address housing affordability, and reduce in-commuting. A higher growth level option would be consistent with the Government’s aspirations for the Oxford to Cambridge Arc.
1.4 It is requested that housing and jobs requirements in Policy S/JH are based on delivering the higher growth level option.


Policy S/DS: Development Strategy

SUPPORT

1.5 We broadly support this approach, given that it identifies North-East Cambridge for the creation of new compact city district on brownfield land, noting that it has already been identified for homes and jobs growth.
1.6 However, we are extremely concerned by the ‘Homes’ target for NEC that is stated in the table on page 32, which refers to 3,900 homes between 2020 and 2041. Fundamentally, this is at odds to the trajectory that has been agreed with Homes England as a pre-requisite for the substantial public funding that has been agreed in principle to relocate the WWTW.
1.7 We would therefore instead support a policy that recognises 5,600 homes will be provided on the Core Site by 2041. Consideration will also then need to be given to other housing that is expected to come forward within the NEC AAP.



Policy S/NEC: North-East Cambridge

SUPPORT

1.8 We support this approach but would request that GCLP policy for S/NEC is entirely consistent with NEC AAP. A simple policy that specifies reference to NEC AAP will enable GCLP policy to remain up to date, as and when changes are made through the examination and adoption process.
1.9 We would note that Policy 1 of the NEC AAP Proposed Submission states ‘approximately 8,350 new homes, 15,000 new jobs’, as opposed to ‘up to’ as set out in S/NEC.
1.10 S/NEC policy should therefore be amended to refer to ‘approximately’ and provide a clearer link to NEC AAP.


Policy BG/BG: Biodiversity and Geodiversity

OBJECT

1.11 The policy wording suggests that there will be a requirement for development to achieve a minimum 20% biodiversity net gain, which has been based on the South Cambridgeshire District Council Doubling Nature Strategy (2021), the draft Cambridge City Council Biodiversity Strategy 2021 – 2030, and the Oxford-Cambridge Arc Environment Principles (2021).
The Environment Act 2021, however, states that a minimum of 10% Biodiversity Net Gain should be achieved, and specifies the three forms for doing so:

- Post-development biodiversity value of the onsite habitat;

- the biodiversity value, in relation to the development, of any registered offsite biodiversity gain allocated to the development;

- the biodiversity value of any biodiversity credits purchased for the development;

1.12 Whilst U+I/TOWN recognise the importance in providing significant biodiversity improvements through development, it is considered that the mandatory minimum limit should reflect the legislative target. However, policy could still actively encourage schemes to exceed the minimum, recognising that those that do will be considered as a planning ‘benefit’ of development in sustainability terms (the greater the increase, the greater the weight attached to the assessment of benefit in any planning balance).
1.13 In terms of implications for the Core Site in North-East Cambridge, the NEC Ecology Study (2020) recommended that a target for a net gain of 10% is applied for all developments within NEC. Where this is not achievable within the site boundary then offsite measures should be provisioned.
1.14 By way illustration, a 20% gain to the 36.76 biodiversity units that have been identified in the Ecology Study would result in the need to achieve 44.112 biodiversity credits, in order to satisfy policy requirements. This seems highly ambitious, given the level of density that will need to be achieved across the Core Site to meet NEC strategy objectives. We will continue to make representations on this point as the NEC AAP progresses. GCSP must also consider alternatives to on-site provision where the necessary biodiversity net gain cannot be achieved on site. This could include a range of options including biodiversity net gain ‘credits’ being able to be purchased from other sites.



1.15 Ultimately, the aim of BNG is to leave the natural environment in a measurably better condition than beforehand. Therefore, if it can be robustly demonstrated that on-site provision is not achievable, the opportunity to measurably improve the natural environment of other appropriate receptor sites through off-site provision should still have a significant value attached to it.

Policy WS/HD: Creating Healthy New Developments

SUPPORT

1.16 We broadly support the 10 principles for creating healthy places. The vision for North-East Cambridge is of a healthy, inclusive, walkable, low-carbon new city district with a vibrant mix of high quality homes, workplaces, services and social spaces, fully integrated with surrounding neighbourhoods.
1.17 One of the five strategic objectives of the NEC AAP is for a healthy and safe neighbourhood and notes the principles of the Health New Towns programme.

Policy WS/MU: Meanwhile Uses During Long Term redevelopments

SUPPORT

1.18 We support the inclusion of a Meanwhile Use policy and agree that it can play an important role on strategic development sites. Phases of development can occur over a significant period of time, and therefore utilisation of vacant/redundant land/buildings for social and/or economic purposes can help activate an area and provide short/medium term benefits that might not otherwise be realised.

Policy GP/LC: Protection and Enhancement of Landscape Character

COMMENT

1.19 The policy notes that ‘the edges of Cambridge and the villages are an important area of transition which require sensitive landscaping to protect the setting of the settlements and to provide a well- defined edge which respects townscape and the countryside beyond’.
1.20 The Core Site at North-East Cambridge will need to be planned to a high density in order to fully achieve the the strategic objectives of the NEC AAP, as well as to hit the quantum of development required under Homes England’s Housing & Infrastructure Fund. This will require a number of buildings that are taller than may otherwise be commonly found in the north of Cambridge (including surrounding villages, such as Milton). The masterplan for the Core Site will take great care in how its development edges interface with the landscape and setting of nearby settlements, as well as adjoining ‘bad neighbour’ uses currently in existence. The policy will need to recognise the strategic objectives of NEC AAP and avoid imposing conditions that could unreasonably restrict development.

Policy GP/QD: Achieving High Quality Development

SUPPORT



Policy GP/QP: Establishing High Quality Landscape and Public Realm

SUPPORT


Policy J/NE: New Employment Development Proposals

SUPPORT

1.21 We broadly support the intent of the policy but consider it essential that GCSP takes a more ambitious approach in seeking to capture and accommodate the substantial demand in office, R&D, lab and associated manufacturing space in the Greater Cambridge area. There is a need to provide sufficient supply in order to meet the balanced homes/jobs requirements and to reflect the high employment density and employment skills these uses engender.
1.22 The Greater Cambridge Local Plan Strategic Spatial Options Assessment (Housing and Employment Relationships Nov 2021), upon which the homes and jobs growth of the First Proposals has been based (‘Central Growth’), considered a Higher Growth option of 78,742 jobs in the Plan Period. It
noted that ‘this is a plausible but more aspirational growth outcome’. We believe that the Higher Growth option should be pursued to reflect the Combined Authority’s commitment to doubling GVA by 2040 and capitalise on the significant appetite for research/knowledge-based, commercial development in the City.

Policy J/AW: Affordable Workspace and Creative Industries

SUPPORT

Policy H/HD: Housing Density

SUPPORT

Policy H/CB: Self and Custom-build Homes

OBJECT

1.23 The concern we have with this policy is the ability for the Core Site scheme to comply with the amount of Self-build/custom build being sought, given the high-density development that is envisaged. We would seek reference in the policy to wording that reflects the relevant policy in the NEC AAP i.e. to support ‘custom-finish’ as well.


Policy I/ST: Sustainable Transport and Connectivity
SUPPORT

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 60765

Received: 13/12/2021

Respondent: U+I Group PLC

Agent: Carter Jonas

Representation Summary:

SUPPORT - We support the inclusion of a Meanwhile Use policy and agree that it can play an important role on strategic development sites. Phases of development can occur over a significant period of time, and therefore utilisation of vacant/redundant land/buildings for social and/or economic purposes can help activate an area and provide short/medium term benefits that might not otherwise be realised

Full text:

0.0 INTRODUCTION

0.1 This document sets out written representations on behalf of U+I to a formal consultation by Greater Cambridge Shared Planning Services (‘GCSP’) on the Greater Cambridge Local Plan ‘First Proposals’ (Preferred Options, Regulation 18, 2021) (‘First Proposals’).

0.2 This response concerns a site of 1.86 hectares, identified as Land South of Cambridge Road, Milton, whose red-line boundary is provided in Appendix A (“the Site”). The Site lies to the north of the A14 and adjoins the village of Milton. The Site has recently been used by Balfour Beatty as an offices and storage compound for the A14 Improvement Works since 2018, and photos of the Site (from Google Streetview), are provided in Appendix B. Balfour Beatty has now completed the relevant works on the A14 and has vacated the Site.

0.3 In terms of the broader context, U+I have been selected by Anglian Water and Cambridge City Council (as landowners) to act as Master Developer for the comprehensive redevelopment of the existing Waste Water Treatment Works (‘WWTW’), council depot and golf driving range (referred collectively as ‘the Core Site’), for the delivery of approximately 5,500 homes, 23,500m2 of new business space, 13,600m2 of new shops, community, leisure and recreation space (as currently set out in the North East Cambridge Area Action Plan (‘NEC AAP’) Proposed Submission Regulation 19 document).

0.4 In order to deliver the comprehensive redevelopment envisaged in the NEC AAP, a number of existing industrial /non-conforming uses (to residential) will need to either be re-accommodated within a mixed use, higher density, development superblock within NEC AAP or, more likely, be relocated from areas such as Cowley Road Industrial Estate to another location close to the north-eastern edge of Cambridge.

0.5 A Commercial Advice and Relocation Strategy has been commissioned by GCSP to consider this matter in greater detail, and its findings are expected imminently. It is unfortunate that this has not been made available to comment upon during this consultation process.

0.6 Notwithstanding this, it is considered that the Site has significant potential to accommodate the existing, important, businesses in the NEC AAP that will be displaced as a consequence of the major residential-led mixed use development that will be brought forward, following the decommissioning and relocation of the Waste Water Treatment Works.

0.7 Pre-Application Advice was sought from GCSP in respect of a series of development scenarios for the Site, as provided in Appendix C. The purpose of this was to explain the flexibility of the Site, and the attitude towards development of U+I to support those businesses that play a vital role in the wider economy and have a demonstrable need to be on the North-Eastern edge of Cambridge on a site that has excellent connectivity to the strategic highways network and pedestrian/cycle connectivity into Cambridge via the Jane Costen bridge.

0.8 A series of preliminary technical documents were also provided to support the pre-application request and can also be found in Appendix C.

0.9 The Site is currently located within the Green Belt, and this representation requests that it is released and allocated to accommodate commercial/employment uses for those business displaced from the NEC AAP

1.0 POLICY RESPONSE

Policy S/JH: Level of Jobs and Housing OBJECT

1.1 The Cambridgeshire and Peterborough Devolution Deal committed to delivering substantial economic growth and to double economic output during the next 25 years. The Cambridge and Peterborough Combined Authority and the Greater Cambridge Greater Peterborough Enterprise Partnership acknowledge and support the economic growth potential of the Greater Cambridge area and consider that there is a need to substantially increase housing delivery in order to support economic growth (that is needed to meet the objective of doubling GVA by 2040) and address the significant housing affordability issues that exist (Cambridgeshire and Peterborough Independent Economic Review). At present there is an imbalance between rates of economic growth and housing delivery in Greater Cambridge.

1.2 These factors support a significantly higher number of homes than are proposed in the preferred ‘medium plus’ growth option of Policy S/JH. It is considered that the ‘medium plus’ growth option makes insufficient upward adjustments to the housing requirement (from Section Id.2a of the Planning Practice Guidance) to take into account growth strategies, strategic infrastructure improvements and housing affordability in Greater Cambridge.

1.3 It is essential that any increase to housing is supported by a commensurate increase in the level of jobs (and vice versa), in order to maintain to maintain an appropriate balance of locating homes close to opportunities to work, within or on the edge of Cambridge, where it is accessible to public transport and/or good pedestrian / cycle / micro-mobility connections. 1.4 It is suggested that the emerging GCLP should have selected the higher growth level option to support economic growth, address housing affordability, and reduce in-commuting. A higher growth level option would be consistent with the Government’s aspirations for the Oxford to Cambridge Arc.

1.5 It is essential that housing and jobs requirements in Policy S/JH are based on delivering the higher growth level option.

Policy S/DS: Development Strategy OBJECT

1.6 Whilst we broadly, partially, support this approach, given that it identifies North-East Cambridge for the creation of new compact city district on brownfield land (noting that it has already been identified for homes and jobs growth) we object on the basis that it does not identify the Site as a suitable ‘receptor’ site for displaced commercial uses from NEC AAP.

1.7 Paragraph 140 of the NPPF allows Green Belt boundaries to be altered through the plan-making process provided exceptional circumstances exist, and those exceptional circumstances should be based on evidence and justified. It is considered that exceptional circumstances exist to release the Site, which is related to the specific need to provide land for existing businesses that will displaced by the NEC AAP.

1.8 Paragraph 141 requires plan-making authorities to examine all other reasonable options to meet identified development needs before considering whether exceptional circumstances exist to justify changes to Green Belt boundaries i.e. make as much use of previously developed land, increase the density of development, and consider whether development needs could be accommodated in neighbouring areas. In the case of Cambridge increasing densities and reusing previously developed land is not straightforward and may be inappropriate because of heritage assets and the difficulty of finding alternative sites for existing uses. The adopted Local Plans for Cambridge and South Cambridgeshire already identified previously developed land opportunities, and the emerging GCLP seeks to do them same. As such, previously developed land opportunities that are deliverable have already been identified within and on the edge of Cambridge.

1.9 Paragraph 142 requires any review of Green Belt boundaries to consider the need to promote sustainable patterns of development, and that where the release of land from the Green Belt is necessary that priority is given to previously developed land or sites that are well-served by public transport. It is acknowledged in emerging GCLP and the associated Sustainability Appraisal that the edge of Cambridge is a sustainable location because of its close proximity to employment and the opportunity to travel by non-car modes of transport.

1.10 The Site is ideally located to NEC AAP, being on the fringe of it, well connected to the strategic highway network and will be extremely well connected to NEC AAP via existing pedestrian and cycle routes across the Jane Costen bridge, that will lead directly into St John’s Innovation Park and the wider NEC area beyond it. Therefore, the release of the Site from the Green Belt would be consistent with the approach in national policy to give priority to those Green Belt sites that will support active travel.

Section 2.6: Rest of Rural Area / Policy S/RRA: Allocations in Rest of the Rural Area OBJECT

1.11 The successful delivery of the redevelopment of NEC is a key part of the development strategy for emerging GCLP. However, the redevelopment of NEC is reliant in part on the timely relocation of existing business from land to be redeveloped by other uses. It is considered that the relocation process would be made easier if additional land was identified in emerging GCLP for relocated businesses from NEC, whether temporary or permanent.

1.12 It is requested that the Site should be allocated in emerging GCLP as a suitable relocation site for some businesses that will be displaced from the NEC AAP. This outcome would represent the exceptional circumstances to justify the release of land from the Green Belt.

1.13 It is considered that, taking into account the current Green Belt status of the Site, land could be suitable for a range of potential industrial uses (or other uses that would be deemed ‘non-conforming’ to the residential uses within the NEC AAP). The Site is ideal for this type of end-use – there are no existing residential receptors within close proximity (the nearest residential property in Milton is 125m away, but this would separated by the intervening existing Industrial Park and Tesco), and the nearest new residential receptor in NEC AAP will be over 100m away and separated by the A14 (and therefore any residential edge of NEC AAP will be protected by new acoustic barriers on the southern edge of the A14).

Policy S/NEC: North-East Cambridge SUPPORT

1.14 We support this approach but would request that GCLP policy for S/NEC is entirely consistent with NEC AAP. A simple policy that specifies reference to NEC AAP will enable GCLP policy to remain up to date, as and when changes are made through the examination and adoption process. 1.15 We would note that Policy 1 of the NEC AAP Proposed Submission states ‘approximately 8,350 new homes, 15,000 new jobs’, as opposed to ‘up to’ as set out in S/NEC. 1.16 S/NEC policy should therefore be amended to refer to ‘approximately’ and provide a clearer link to NEC AAP. Policy BG/BG: Biodiversity and Geodiversity OBJECT 1.17 The policy wording suggests that there will be a requirement for development to achieve a minimum 20% biodiversity net gain, which has been based on the South Cambridgeshire District Council Doubling Nature Strategy (2021), the draft Cambridge City Council Biodiversity Strategy 2021 – 2030, and the Oxford-Cambridge Arc Environment Principles (2021).

1.18 The Environment Act 2021, however, states that a minimum of 10% Biodiversity Net Gain should be achieved, and specifies the three forms for doing so: • Post-development biodiversity value of the onsite habitat; • the biodiversity value, in relation to the development, of any registered offsite biodiversity gain allocated to the development; • the biodiversity value of any biodiversity credits purchased for the development;

1.19 Whilst U+I recognise the importance in providing significant biodiversity improvements through development, it is considered that the mandatory minimum limit should reflect the legislative target. However, policy could still actively encourage schemes to exceed the minimum, recognising that those that do will be considered as a planning ‘benefit’ of development in sustainability terms (the greater the increase, the greater the weight attached to the assessment of benefit in any planning balance).

1.20 GCSP must also consider alternatives to on-site provision where the necessary biodiversity net gain cannot be achieved on site. This could include a range of options including biodiversity net gain ‘credits’ being able to be purchased from other sites.

1.21 Ultimately, the aim of BNG is to leave the natural environment in a measurably better condition than beforehand. Therefore, if it can be robustly demonstrated that on-site provision is not achievable, the opportunity to measurably improve the natural environment of other appropriate receptor sites through off-site provision should still have a significant value attached to it.

Policy WS/MU: Meanwhile Uses During Long Term redevelopments
SUPPORT


1.22 We support the inclusion of a Meanwhile Use policy and agree that it can play an important role on strategic development sites. Phases of development can occur over a significant period of time, and therefore utilisation of vacant/redundant land/buildings for social and/or economic purposes can help activate an area and provide short/medium term benefits that might not otherwise be realised.

Policy J/NE: New Employment Development Proposals
SUPPORT

1.23 We broadly support the intent of the policy but consider that GCSP should be taking a more ambitious approach in seeking to capture and accommodate the substantial demand in office, R&D, lab and associated manufacturing space in the Greater Cambridge area.

1.24 The Greater Cambridge Local Plan Strategic Spatial Options Assessment (Housing and Employment Relationships Nov 2021), upon which the homes and jobs growth of the First Proposals has been based (‘Central Growth’), considered a Higher Growth option of 78,742 jobs in the Plan Period. It noted that ‘this is a plausible but more aspirational growth outcome’. We believe that the Higher Growth option should be pursued to reflect the Combined Authority’s commitment to doubling GVA by 2040 and capitalise on the significant appetite for research/knowledge-based, commercial development in the City.

Policy J/AW: Affordable Workspace and Creative Industries
SUPPORT

HELAA Site Assessment – Land South of Milton, North of the A14 (Site Ref. 47943)

1.25 U&I’s comments and suggested amendments to the site assessment are as follows: – Proposed Development – refers to Residential, Market and affordable housing, Specialist/other forms of housing, Office, Research and Development. We would request this be amended to B2/B8/sui generis uses applicable to other uses currently in NEC AAP i.e. those that might be considered non-conforming to residential; – Flood Risk – it is considered that this should be categorised as ‘green’.
The Site lies within Flood Zone 1, and any planning application would need to be accompanied by a site-specific Flood Risk Assessment, demonstrating how any localised flood risk arising from the proposed development could be adequately mitigated. Furthermore, the proposed use would be considered less vulnerable in flood risk terms.

– Landscape and Townscape: the Site lies between the existing urban edge of Milton (with Tesco to the north, the industrial park to the east, and separated from NEC AAP by the A14. The northern edge of NEC AAP (opposite the Site) has been considered acceptable (in Landscape / Townscape assessment) for new development of 3-6 storeys. It therefore seems perverse that the Site can be assessed as ‘Red’ in Landscape and Townscape terms and would request this be
changed to Green. The intended uses for the Site would be industrial / storage / sui generis uses, that are likely to be typically 1-2 storeys in height. The Site also benefits from landscaping on its boundaries, to help soften the impact of any new development.

– Site Access – we would request that this is changed to ‘Green’, given that the assessment notes that the proposed site is acceptable in principle subject to detailed design. There are potential access constraints, but these could be overcome through development.

- Noise, Vibration, Odour and Light Pollution – we would request that this is changed to ‘Green’, given that the assessment notes that ‘the proposed site will be affected by road traffic noise from nearby main roads but is acceptable in principle subject to appropriate detailed design considerations and mitigation. The proposed site will be affected by noise from nearby industrial/commercial activities but is acceptable in principle subject to appropriate detailed design considerations and mitigation. The site is capable of being developed to provide healthy internal and external environments in regard to noise / vibration/ odour/ Light Pollution after careful site layout, design and mitigation. Furthermore, the proposed use for industrial / storage / sui generis would be less sensitive (than for a residential use, for instance).

– Strategic Highways Impact: The good accessibility of the Site by sustainable modes of transport and future improvements to public transport, walking and cycling, would provide employees with an alternative to the car for journeys to work and reduce traffic impacts from the promoted development. If the Site is to be used as a ‘receptor’ site for existing industrial uses in NEC AAP, such uses will already be making a contribution to the strategic network (in terms of existing trips) and therefore the proposed use of this Site will have a negligible impact.

– Green Belt: The Site is currently located within the Green Belt. The Site has been assessed as having ‘moderate high’ Green Belt value. In comparative terms, this performs well in the context of other Green Belt sites in the north of Cambridge. Notwithstanding this, in terms of the five spatial ‘Purposes’ of Green Belt, namely: (a) to check the unrestricted sprawl of large built-up areas; (b) to prevent neighbouring towns merging into one another; (c) to assist in safeguarding the countryside from encroachment; (d) to preserve the setting and special character of historic towns; and (e) to assist in urban regeneration, by encouraging the recycling of derelict and other urban land.

1.26 It is considered that only (b) and (e) would potentially be relevant here. In terms of (b) the Site lies in between the urban edge of Milton, and the northern edge of Cambridge. Theoretical coalescence between Milton and Cambridge has already, in effect, taken place by the presence of the industrial park, and its relationship to the north of Cambridge. However, this is physically separated by the permanent presence of the A14. The same would be true if the Site is developed. In terms of (e), it is considered applicable, albeit in the opposite manner of how (e) is intended. The release of land from the Green Belt here will assist in urban regeneration, by providing a receptor site that aids relocation of existing sites and facilitates NEC’s delivery.

1.27 It is considered that the Site provides lower value in Green Belt terms than has been assessed and its release would provide significant benefits insofar as providing a receptor site for important commercial/employment uses that would be displaced by the wider regeneration taking place at NEC.

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 60776

Received: 13/12/2021

Respondent: Cambridge and South Cambridgeshire Green Parties

Representation Summary:

Recommend temporary spaces and buildings are used to assist with unaffordable housing via property guardianship.

Full text:

We recommend that temporary spaces and buildings are used to assist with Cambridge’s glaring problem of unaffordable housing via the method of property guardianship which is endorsed on our government’s website: “It is widely accepted that a property guardian is someone who has entered into an agreement to live in a building or part of a building that would otherwise be empty for the primary purpose of securing and safeguarding the property.” [1] There are a number of well established property guardianship organisations and it is known that one of them, Dot Dot Dot, has experience of finding temporary tenants in empty properties in Eastfield, Chesterton which provided an affordable place to live for a number of individuals in the interim period before these properties were demolished to build more social housing by local housing association, Hundred Houses Society. [2]
[1] https://www.gov.uk/government/publications/property-guardians-fact-sheet/property-guardians-afact-