Greater Cambridge Local Plan Issues & Options 2020
Search form responses
Results for Abbey Properties Cambridgeshire Limited search
New searchLand north of Elbourn Way and The Limes, Bassingbourn
2.82
No uploaded files for public display
Agricultural land, open land and drainage lagoon
N/A
N/A
Mixture
Residential development with open space.
Public Open Space
30-40 Dwellings
No uploaded files for public display
See draft masterplan - access from Elbourn Way. This does involve additional third party land but heads of terms for an agreement are in place
See Planning Policy Overview and Analysis. Landscape and Visual Statement and Technical Note on Flood Risk The Below information has been extracted from the applicants Landscape and Visual statement: The site does not fall within or lie close to AONB or National Park landscape designations. 2.4 There are no registered historic parks and gardens within a 2km radius of the site. 2.5 The site does not fall within a Local Green Space as described in Policy NH/12 in the Local Plan. 2.6 The western half of the site at Bassingbourn falls within the Bassingbourn Conservation Area, which is subject to Policy NH/14 in the Local Plan.
See Planning Policy Overview and Analysis
The land is available as the access rights have been agreed in principle. Standard planning considerations will need to be further reviewed and mitigated where necessary.
Very attractive owing to the location of the site within the village and the desirability of the village given the transport links
Yes but solutions are agreed
Yes the site was proposed for a housing allocation within the early 1990's but was removed by the Examining Inspector
2021
2022
2
Yes the drainage lagoon can be removed and the drainage reconfigured within the site
Golf practice ground
Leisure as part of golf club
N/A
Previously developed
Residential development with open space and community facilities
Community building and Public open space
30-40 dwellings
No uploaded files for public display
See draft masterplan
See Technical Note on Flood Risk and draft masterplan
See Technical Note on Flood Risk and Planning Policy Overview and Analysis
Electricity line would be undergrounded (if need be). Otherwise services are available from Oakington Road
No constraints
Very attractive owing to the location of the site within the village and the desirability of the village given the transport links
N/A
N/A
2021
2022
1
Yes through undergrounding the overhead electricity line which is not considered to act as a constraint to the viable delivery of the site
Land at and to the rear of Nos. 30 and 32 New Road and to the east of the recreation ground, Over
2.9
2 x bungalows, paddock and open land
Residential
S/1279/18/FL
Mixture
Residential development with open space
Public Open Space
44 dwellings as per Planning Application S/1279/18/FL
See drawing number JNY9037-02
See planning statement
See Flood Risk Assessment, Preliminary Ecological Assessment, Species Surveys, Tree Survey Report and Arboricultural Impact Assessment and Foul Sewerage and Utilities Assessment
See Foul Sewerage and Utilities Assessment
Limited demolition is required - otherwise the site is free of constraints.
Very attractive owing to the location of the site within the village and the desirability of the village given the transport links
No
No
2020
2021
2
Yes
Land to the east of Caxton Gibbet Services
0.62Ha
No uploaded files for public display
Vacant Land
N/A
None
Greenfield.
Commercial use to complement the approved employment land to the south and the existing services to the west. This could comprise a mixture of B and/or D Use Class Land Uses. Abbey retain ownership of the roadside services site to the west.
Employment generation.
Employment space of c. 2,500sqm.
No Specified.
No uploaded files for public display
Road access from the north.
N/A
N/A
Utilities are available from existing connections to the west serving the roadside services site.
Utilities are available from existing connections to the west serving the roadside services site.
No constraints.
Very attractive owing to the location of the site relative to transport links and new proposed housing to the south.
No
No
2021
2022
1
N/A
No uploaded files for public display
The plan should be the subject of detailed in-depth consultations with key stakeholders (such as UKPN, the County Council and the Environment Agency) and positive discussions with local communities through a range of measures. Reaching out to young people is vitally important.
No uploaded files for public display
Yes we agree that 2040 is an appropriate date.
No uploaded files for public display
Yes but we reserve the right to make further representations.
No uploaded files for public display
Yes but we reserve the right to make further representations.
No uploaded files for public display
Climate Change, Biodiversity and Green Spaces, Wellbeing and Social Inclusion, Great Places
By allocating new renewable energy schemes and ensuring that housing developments provide a balanced strategy for renewable energy.
No uploaded files for public display