Greater Cambridge Local Plan Issues & Options 2020

Search form responses

Results for Hill Residential Limited search

New search New search
Form ID: 40110
Respondent: Hill Residential Limited
Agent: Hill Residential Limited

Land east of Cabbage Moor, Great Shelford

10.89

Site 40110 map

No uploaded files for public display

Caravan and Camping Site, rough pastureland, storage with existing buildings.

N/A

N/A

The majority of the site is greenfield. However as part of the site is currently used as a Caravan and Camping Site, this has required the establishment of access roads and ancillary buildings. There are a number of other buildings located on the wider site.

The site is available and suitable for residential development.

Market and affordable housing , Key worker housing , Older persons housing , Residential care home , Custom or self build housing

Public open space

The Site is ideally located to meet the identified needs that exist in the current market in terms of private housing, affordable housing, older persons accommodation and key worker accommodation.

A minimum of 400 new dwellings.

No uploaded files for public display

Yes (Please give details)

The Site can be accessed via the existing Cabbage Moor road that currently provides access to the site. We are exploring a number of other alternative access arrangements so as not to limit the development potential of the site.

No

The Site slopes slightly in a South Westerly direction by circa 5m. As this slope is minor it does not prohibit development.

Yes (Please give details)

The eastern part of the site is within flood Zone 2, however the residential development will be located to Flood Zone 1.

Water, sewerage, electricity, gas and broadband are available via connection in Cambridge Road.

Available now

The Site is available for development subject to the relocation of the Caravan and Camping Club. It can be delivered with 2-3 years post adoption of the Local Plan.

Enquiries received

The Site is within a strong residential market area where there is continued demand for a range of house types, sizes and tenures. The Site is located next to the Great Kneighton development and in close proximity to the Cambridge Biomedical Campus.

No

N/A

2024 onwards, subject to adoption

2029

5

No

N/A

Yes

Form ID: 40129
Respondent: Hill Residential Limited
Agent: Hill Residential Limited

Land east of Hinton Road, Great Shelford

1.99

Site 40129 map

No uploaded files for public display

Rough pasture

Rough pasture

N/A

Greenfield

Residential development

Market and affordable housing , Key worker housing , Older persons housing , Residential care home , Custom or self build housing

Public open space

The site can deliver circa 50 new homes, 40% of which would be affordable. The development would provide on-site open space.

The site will provide a policy compliant density of 30 dwelling per hectare as stipulated within the Adopted Local Plan. Circa 50 dwellings would therefore be appropriate for the site.

No uploaded files for public display

Yes (Please give details)

The Site benefits from a single access point from Hinton Road. Discussions are currently ongoing with adjoining landowners to secure an alternative access or widen the existing access.

No

Yes (Please give details)

The site is within flood zone 1 and there are no other environmental constraints that we are aware of that would restrict the development of this site.

Water, sewerage, electricity, gas and broadband are available via connections in Hinton Road.

Available now

The Site is available for development now. It can be delivered within 2 years post the adoption of the Local Plan.

Site is under option by a developer

The site lies in a village with excellent access to jobs, primary and secondary school, day-to-day convenience shopping, restaurants/pubs, recreation facilities, public transport, and where demand for housing is strong

No

N/A

2024 or earlier should the emerging local plan be adopted.

2026

2

No

N/A

Yes

Form ID: 40156
Respondent: Hill Residential Limited
Agent: Hill Residential Limited

Land North of Sidney Gardens

5.69

Site 40156 map

No uploaded files for public display

Part Residential, Part Greenfield

Part Residential, Part Greenfield

N/A

The majority is a greenfield site.

Residential development

Market and affordable housing , Key worker housing , Older persons housing , Residential care home , Custom or self build housing

Public open space , Community facilities , Recreation and leisure

The total site area is approximately 5.69 hectares and is of a scale to allow a high quality residential development to come forward along with other complimentary facilities.

The site could provide a development with a density of around 30 dwelling per hectare on part of the site. The remaining areas of the site can be set over to wider community benefits and public open space.

No uploaded files for public display

Yes (Please give details)

Access is currently provided from Sidney Gardens.

No

A slight slope southward of around circa 3m, however, nothing that would constrain the development.

Yes (Please give details)

The site is within flood zone 1. The majority of the site sits within the Green Belt.

Water, sewerage, electricity, gas and broadband are available via connections in the Sidney Gardens

Available now

There is a developer involved with the site who is willing to take the land forward through the planning process.

Site is under option by a developer

The site lies in a village within a strong residential market area where there is continued demand for a range of house types, sizes and tenures.

No

N/A

2024 or earlier should the emerging local plan be adopted

2026

2 years depending on the scale of the development

No

N/A

Yes

Form ID: 40242
Respondent: Hill Residential Limited

Land off Mill Lane, Impington

1.34

Site 40242 map

No uploaded files for public display

The majority of the land is Greenfield with some buildings located on the site.

N/A

No relevant application within the last 10 years

The majority of the land is Greenfield with some agricultural buildings located on the site. The majority of the site falls within the Green Belt.

Residential development

Market and affordable housing , Key worker housing , Older persons housing , Student accommodation

Public open space

The site can deliver approximately 40 new homes, 40% of which would be affordable. The development would provide on-site open space.

40 residential units has been assumed on the basis of Impington being a Rural Centre in accordance with Policy S/9 of the South Cambs 2018 adopted Local Plan. Policy H/8 provides a guide of an average net density of 30 dwellings per hectare in Minor Rural Centres.

No uploaded files for public display

Yes (Please give details)

The site currently has a single track means of accessing part of the site. The proposal is for the demolition of 32 Mill Lane, Impington to allow a sufficient vehicular access into the site.

No

Yes (Please give details)

The majority of the site has been identified to be within Flood Zone 1 meaning it is of 'low risk' of flooding. There is a very small portion of the site in the south east corner that falls within Flood Zone 2. Some of the trees across the site may need to be felled. No trees within the site are subject to TPO's.

Water, sewerage, electricity, gas and broadband are available via connections in the surrounding area.

Available now

Developer is already involved in promoting the property.

Enquiries received

The site lies in a village with excellent access to jobs, primary and secondary school, day-to-day convenience shopping, restaurants/pubs, recreation facilities, public transport, and where demand is strong for housing.

No

N/A

2024 or sooner dependent on Local Plan Adoption

2026 or sooner dependent on the Adoption of the Local Plan

2

No

N/A

Yes

Form ID: 40269
Respondent: Hill Residential Limited

Land south of Melrose, Meldreth

1.47

Site 40269 map

No uploaded files for public display

The Land is Greenfield.

N/A

No relevant application within the last 10 years

Greenfield

Residential Development

Market and affordable housing , Older persons housing , Residential care home , Custom or self build housing

Public open space

The site can deliver approximately 40 new homes, 40% of which would be affordable. The development would provide on-site open space. Please see a proposed site layout for 40 units appended with this submission.

40 residential units has been assumed on the basis of Meldreth being a Group Village in accordance with Policy S/10 of the South Cambs 2018 adopted Local Plan. Policy H/8 provides a guide of an average net density of 30 dwellings per hectare in Minor Rural Centres. This density has been tested and illustrated through the proposed site layout for 40 units appended with this submission.

No uploaded files for public display

Yes (Please give details)

The site can be accessed through Melrose which was installed as part of a recent development. The road has been designed to allow access through to this proposed site being put forward. This can be seen on the Appended plan.

No

N/A

Yes (Please give details)

The site has been identified to be within Flood Zone 1 meaning it is of 'low risk' of flooding. The majority of the site is covered with scrub and old fruit trees which will require removal to facilitate development. No trees within the site are subject to TPO.

Water, sewerage, electricity, gas and broadband are available via connections in the surrounding area.

Available now

The site is owned by Stonewater who is a leading national social housing provider. The site will be jointly developed by Hill and Stonewater.

Site owned by a developer

The site lies in a village with excellent amenities and where there is continued demand for a range of house types, sizes and tenure. Meldreth is a desirable village with access to key public transport connections. There is strong demand for housing in this location.

No

N/A

2024 (or sooner dependant on Local Plan Adoption)

2026 (or sooner subject to the Adoption of the Local Plan)

2

No

N/A

Yes

Form ID: 40271
Respondent: Hill Residential Limited

Land East of Balsham Road, Fulbourn

2.76

Site 40271 map

Rough pasture land

Rough pasture land

No relevant application within the last 10 years

Greenfield

Residential Development

Market and affordable housing , Key worker housing , Older persons housing , Residential care home , Custom or self build housing

Public open space , Recreation and leisure

The site can deliver up to 40 new homes, 40% of which would be affordable. The development would provide on-site open space. The development could also facilitate an extension to the existing recreational area for the village on the land edged in blue.

40 residential units based on a capacity study, see masterplan attached.

No answer given

No uploaded files for public display

Yes (Please give details)

The site can currently be accessed from Balsham Road. A new access will be required to form part of any application on the site to facilitate development. A transport statement has been prepared for the site and it has been concluded that a new access will be viable in the location shown.

No

N/A

Yes (Please give details)

The site has been identified to be within Flood Zone 1 meaning it is of 'low risk' of flooding. Ground water flooding was identified within the development site but this can be mitigated by setting finished floor levels 150mm above ground level. A flood risk assessment has been undertaken and concludes that Surface Water can be managed meaning that the development would not result in an increased flood risk. The site is situated within the Green Belt. There is a group of TPO's forming the Northern Boundary of the site but these can be retained and incorporated within the design. It has been concluded that the development can be facilitated without any undue impact on many of the boundary trees. The removal of any boundary trees can be compensated by landscaping on the site. The trees that will require felling works to be undertaken are not subject to TPO's. No reptiles were found on site as part of the latest survey effort. A disused badger set was found on site with no sign of recent activity. Bat foraging was present on the northern boundary of the site by the row of existing trees. These trees would be retained as part of the development, therefore it was concluded that the development of the site would not result in adverse impacts on bats. All ecological works will be updated should the site become allocated. The site is considered to have a low to low-moderate potential for archaeological remains. There is a right of way along the western side of the site which will be retained, incorporated and enhanced as part of the design proposals for the site.

No answer given

No

Water, sewerage, electricity, gas and broadband are available via connections in Balsham Road.

Available now

The site is under option to the housebuilder, who will be developing out the land.

Site is under option by a developer

The site lies in a village with excellent access to jobs, primary and secondary school, day-to-day convenience shopping, restaurants/pubs, recreation facilities, public transport, and where demand is strong.

No

No

N/A

October 2024 (or sooner dependant on Local Plan Adoption and the relase of the site from the Greenbelt)

June 2026

1.75

No

N/A

Yes

Form ID: 40272
Respondent: Hill Residential Limited

Land East of Balsham Road, Fulbourn

1.08

Site 40272 map

No uploaded files for public display

Rough pasture land

Rough pasture land

Not within Last 10 years

Greenfield

Residential Development

Market and affordable housing , Key worker housing , Older persons housing , Residential care home , Custom or self build housing

Public open space

The site can deliver up to 40 new homes, 40% of which would be affordable. The development would provide on-site open space.

40 residential units based on a capacity study, see masterplan attached.

No uploaded files for public display

Yes (Please give details)

The site can currently be accessed from Balsham Road. A new access will be required to form part of any application on the site to facilitate development. A transport statement has been prepared for the site and it has been concluded that a new access will be viable in the location shown.

No

N/A

Yes (Please give details)

The site has been identified to be within Flood Zone 1 meaning it is of 'low risk' of flooding. Ground water flooding was identified within the development site but this can be mitigated by setting finished floor levels 150mm above ground level. A flood risk assessment has been undertaken and concludes that Surface Water can be managed meaning that the development would not result in an increased flood risk. The site is situated within the Green Belt. There is a group of TPO's forming the Northern Boundary of the site but these can be retained and incorporated within the design. It has been concluded that the development can be facilitated without any undue impact on many of the boundary trees. The removal of any boundary trees can be compensated by landscaping on the site. The trees that will require felling works to be undertaken are not subject to TPO's. No reptiles were found on site as part of the latest survey effort. A disused badger set was found on site with no sign of recent activity. Bat foraging was present on the northern boundary of the site by the row of existing trees. These trees would be retained as part of the development, therefore it was concluded that the development of the site would not result in adverse impacts on bats. All ecological works will be updated should the site become allocated. The site is considered to have a low to low-moderate potential for archaeological remains. There is a right of way along the western side of the site which will be retained, incorporated and enhanced as part of the design proposals for the site.

Water, sewerage, electricity, gas and broadband are available via connections in Balsham Road.

Available now

The site is under option to the housebuilder, who will be developing out the land.

Site is under option by a developer

The site lies in a village with excellent access to jobs, primary and secondary school, day-to-day convenience shopping, restaurants/pubs, recreation facilities, public transport, and where demand is strong.

No

N/A

October 2024 (or sooner dependant on Local Plan Adoption and the release of the Land from the Greenbelt)

2026

1.75

No

N/A

Yes

Form ID: 46828
Respondent: Hill Residential Limited

The Council should involve a wide range of stakeholders in the preparation of the plan. That should include significant involvement of the development industry to ensure that the plan is deliverable and responsive to a rapidly changing world. We would recommend the establishment of a developers sounding board as a means for engaging with the development industry. That could be based on an existing group, such as the Cambridgeshire Developers Forum. Such a group could advise on implementation of and drafting of policy to ensure that the plan is deliverable.

No uploaded files for public display

Form ID: 46831
Respondent: Hill Residential Limited

Strongly disagree

Whilst the NPPF requires that strategic policies should have a minimum 15 year time horizon on adoption, there would be considerable merit in strategic policies looking beyond this time period to 2050. The development plan system provides for policies to be reviewed every 5 years and hence if there are significant changes in circumstances that would be picked up during a review of strategic policies and trigger an updating of the plan. Planning to 2050 would provide a clear direction and base and would simply mean that in future the plan making process can focus on allocating land to meet agreed development needs, rather than revising and debating growth levels. That would greatly speed up plan making. We also consider there is a practical reason to look further ahead. The local plan will need to be adopted by March 2025 to provide a 15 year horizon to 2040. Experience suggests that such a timetable will be challenging and may not be achieved. It would be disappointing to get close to adoption only to find that there will not be a 15 year time horizon on adoption and hence further work required, delaying adoption further. We consider it would be prudent therefore to plan to 2050.

No uploaded files for public display

Form ID: 46832
Respondent: Hill Residential Limited

Strongly disagree

The plan cannot be developed without consideration of London’s economy and unmet housing need. London exerts a powerful influence across a wide area, including Greater Cambridge. London’s unmet need is now considered to be around 140,000 homes over the period 2018 to 2028. If consideration is not given to the implications of that it is likely that there will continue to be under provision with negative economic, social and environmental impacts.

No uploaded files for public display

For instructions on how to use the system and make comments, please see our help guide.