Greater Cambridge Local Plan: Proposed Submission
Search representations
Results for Granta Land search
New searchObject
Greater Cambridge Local Plan: Proposed Submission
Policy S/JH: New jobs and homes
Representation ID: 213403
Received: 25/09/2026
Respondent: Granta Land
Agent: Enodia Planning Limited
Legally compliant? Yes
Sound? No
There is concern that there is a lack of alignment between the jobs and homes numbers, Policy S/JH stating that development will deliver 73,300 additional new jobs and a minimum of 48,069 new homes. This level of housing provision does not fully reflect or account for the level of planned economic growth and that 48,069 new homes will not yield the increase in residents to meet potential employment growth. Greater Cambridge have used an economic growth forecast model at the lower end the evidence base and that doesn't reflect political ambition. More housing needs to be planned for.
Object
Greater Cambridge Local Plan: Proposed Submission
Policy S/DS: Development strategy
Representation ID: 213414
Received: 25/09/2026
Respondent: Granta Land
Agent: Enodia Planning Limited
Legally compliant? Yes
Sound? No
Overreliance on large strategic sites and new settlements for housing. Major sites expected to deliver 44,900 homes, but only 22,823 will likely be completed within the plan period. In highlighting the limitations on delivery on these sites in the Plan period, Greater Cambridge are acknowledging the risks to delivery. Particularly given the need for significant infrastructure to be delivered in advance of housing delivery. Greater numbers are likely to be pushed outside the Plan period, putting the Plan’s objectives at significant risk. More sites are needed.
Object
Greater Cambridge Local Plan: Proposed Submission
Policy S/DS: Development strategy
Representation ID: 213424
Received: 25/09/2026
Respondent: Granta Land
Agent: Enodia Planning Limited
Legally compliant? Yes
Sound? No
Unrealistic windfall allowance has been included with in the current supply.
The housing trajectory assumes ambitious delivery rates for large sites, with significant spikes that are not justified or evidenced. Infrastructure delays will impact the yield from sites within the anticipated build periods.
The 5-year supply method used (Liverpool) is not PPG-preferred (Sedgefield), and justification for its use is currently insufficient.
Local Plan soundness and effectiveness are at risk due to these assumptions.
Object
Greater Cambridge Local Plan: Proposed Submission
Policy S/SH: Settlement hierarchy
Representation ID: 213427
Received: 25/09/2026
Respondent: Granta Land
Agent: Enodia Planning Limited
Legally compliant? Yes
Sound? No
Granta Land would broadly reiterate previous comments submitted in respect of the settlement hierarchy for Greater Cambridge, and specifically the classification of Meldreth and Melbourn.
Meldreth is currently defined as a ‘Group Village’, and Melbourn as a ‘Minor Rural Centre’.
It is logical, both geographically and given the proximity of the services within the settlements, that they should be considered as a single settlement for the purposes of the hierarchy.
Object
Greater Cambridge Local Plan: Proposed Submission
Policy S/DE: Defined development extents
Representation ID: 213439
Received: 25/09/2026
Respondent: Granta Land
Agent: Enodia Planning Limited
Legally compliant? Yes
Sound? No
Whilst proceeding under plan-making policies of the 2024 NPPF, Local Plan policy should align with the 2026 NPPF. Particularly around policies such as Policy S5 for developments outside settlements. Policy S5, 1, h supports residential or mixed-use development near well-connected stations. Policy S5, 1, j further encourages development to address unmet housing needs near existing settlements. Given Greater Cambridge’s growth and housing shortages, sites like Granta Land’s holdings near Meldreth should be reassessed to meet projected demand, and considered for allocation accordingly.
Object
Greater Cambridge Local Plan: Proposed Submission
Chapter 2: Development strategy
Representation ID: 213447
Received: 25/09/2026
Respondent: Granta Land
Agent: Enodia Planning Limited
Legally compliant? Yes
Sound? No
This representation relates to a site submission (HELAA Site ID 200794; HELAA Site ID 40089; HELAA Site ID 40088; HELAA Site ID 200807).
Wider representations on the development strategy and provision of homes demonstrate the need for further allocations, including in the rural area to ensure a balanced, effective approach. Granta continue to promote 4 sites around the well-connected settlement of Meldreth suitable for allocation:
- Land west of Station Road: 1.42 ha for up to 20 dwellings
- Land east of Station Road: 3.82ha for up to 70 dwellings
- Land at Sheene Farm: 22.25ha for 365-521 dwellings
- Land at Valley Farm: 20.78ha for up to 200 dwellings
Full details are provided above, and within the detailed letter of representation
Object
Greater Cambridge Local Plan: Proposed Submission
Policy CC/WE: Water efficiency in new developments
Representation ID: 213452
Received: 25/09/2026
Respondent: Granta Land
Agent: Enodia Planning Limited
Legally compliant? Yes
Sound? No
Whilst it is appreciated that water infrastructure is a current pressure, it is noted that this policy goes significantly beyond current and proposed building regulations.
The proposed 80 litres per day in developments of 100 or more dwellings and 90 litres per day in other developments goes beyond the proposed mandatory 105 litres per day (currently 125) and proposed optional technical water efficiency standard of 100 litres per day (currently 110) for areas of serious water stress.
There is also a lack of evidence to suggest why there should be an increased restriction on developments over 100 dwellings.
Object
Greater Cambridge Local Plan: Proposed Submission
Policy BG/BG: Biodiversity and geodiversity
Representation ID: 213455
Received: 25/09/2026
Respondent: Granta Land
Agent: Enodia Planning Limited
Legally compliant? Yes
Sound? No
This policy has been amended from earlier drafts which applied a 20% BNG requirement across the board. It is now 10% on all developments, but with major development still required to provide 20%.
This is contrary to national statutory net gain requirements of 10%. The 2026 NPPF states at Policy N1 part 2 that development plans should only set local standards for BNG which are in excess of the statutory requirement where this is for specific site allocations, and is fully justified and deliverable.
A blanket approach to major development is therefore contrary to NPPF policy.
Object
Greater Cambridge Local Plan: Proposed Submission
Sustainability Appraisal
Representation ID: 213462
Received: 25/09/2026
Respondent: Granta Land
Agent: Enodia Planning Limited
Legally compliant? No
Sound? No
Doesn't consider risk associated with the development strategy and reliance on large scale developments.
It takes policies on face value in terms of meeting the objectives around access to homes, and access to services given several allocations seek to make additional non-resi provision. Assumes that development will come forward as intended and in line with stated trajectories. There is little to no analysis of risk if this does not happen. It doesn't adequately evaluate whether a more flexible strategy, including additional allocations in sustainable locations, would better achieve the Plan’s housing, affordability and economic objectives, contributing to more ambitious growth.
Object
Greater Cambridge Local Plan: Proposed Submission
Policy S/JH: New jobs and homes
Representation ID: 213619
Received: 25/09/2026
Respondent: Granta Land
Agent: Bidwells
Legally compliant? Yes
Sound? No
The representation objects to Policy S/JH on the grounds that it is unsound, not positively prepared, ineffective and inconsistent with national policy. It argues that the proposed housing requirement of 48,069 homes merely reflects the minimum standard method need and fails to respond to Greater Cambridge’s nationally significant economic growth ambitions. The Plan does not adequately support forecast economic growth, address acute affordability pressures, or meet identified affordable housing needs. Given substantial unmet housing demand and strategic growth objectives, the Council should plan for a significantly higher housing requirement to support economic prosperity and improve housing affordability across Greater Cambridge.