Greater Cambridge Local Plan Preferred Options

CC/FM: Flooding and integrated water management

Representation ID: 56905

Received: 08/12/2021

Respondent: Save Honey Hill Group

Representation Summary:

Agree with this Policy. It is of particular relevance to the proposed NECAAP proposals (Policy S/NEC) in the areas of highest density, i.e. 300/ha in the central areas, where appropriate SUDS will be needed and the large hard surface areas need to be permeable. Better stormwater management will be required.

Comment

Greater Cambridge Local Plan Preferred Options

CC/RE: Renewable energy projects and infrastructure

Representation ID: 56910

Received: 08/12/2021

Respondent: Save Honey Hill Group

Representation Summary:

Agree in principle. Suggest that Section 4vii needs to be expanded to include that not only visual impacts must be mitigated but also auditory, especially for wind energy.

Comment

Greater Cambridge Local Plan Preferred Options

CC/CE: Reducing waste and supporting the circular economy

Representation ID: 57508

Received: 10/12/2021

Respondent: Save Honey Hill Group

Representation Summary:

Agree in principle. Should include how the removal and transport of materials from demolition and remediation works should be included in the CEMP to reduce the impact of carbon footprint of HCVs.

Comment

Greater Cambridge Local Plan Preferred Options

CC/CS: Supporting land-based carbon sequestration

Representation ID: 57511

Received: 10/12/2021

Respondent: Save Honey Hill Group

Representation Summary:

Agree in principle. This policy protects existing carbon sinks from development and is in line with Policy GP/GB Protection and Enhancement of the Cambridge Green Belt. Because of these two policies it is inappropriate that the development on an existing carbon sink, i.e. the proposed CWWTP relocation on Green Belt at Honey Hill, has not been included in Policy S/EOC: Other existing allocations on the edge of Cambridge.
Note: Fulfilment of S/NEC Policy is contrary to this: decommissioning a fully operational and future proofed CWWTP and relocating to prime agricultural land.

Comment

Greater Cambridge Local Plan Preferred Options

BG/GI: Green infrastructure

Representation ID: 57514

Received: 10/12/2021

Respondent: Save Honey Hill Group

Representation Summary:

Figure 54 shows a map of proposed strategic green infrastructure initiatives. Area 4 is described as Enhancement of the eastern fens. This appears to contradict the proposed CWWTP relocation to part of that area. The policy needs clarification as it requires all new development to help deliver or contribute to support delivery of the green infrastructure strategic initiative objectives. Just putting a development on an area of green belt contradicts this principle.

Comment

Greater Cambridge Local Plan Preferred Options

BG/PO: Protecting open spaces

Representation ID: 57517

Received: 10/12/2021

Respondent: Save Honey Hill Group

Representation Summary:

Aree with this policy in principle. However, the achievement of Policy S/NEC: North East Cambridge, appears to contradict this policy as the development on Cambridge North East Area is predicated on the relocation of the Cambridge Waste Water Treatment Plant to an area of Green Belt.
Note: Fulfilment of S/NEC Policy through relocation of CWWTP to the Green Belt is contrary to this Policy

Comment

Greater Cambridge Local Plan Preferred Options

Sustainability Appraisal

Representation ID: 57531

Received: 10/12/2021

Respondent: Save Honey Hill Group

Representation Summary:

The inclusion of Policy S/NEC is premature and inappropriate as it is predicated on the relocation of Cambridge Waste Water Treatment Plant, the development Consent Order for which will not be examined until late 2022 or 2023 and consultation on NECAAP Regulation 19 proposals are deferred until after the DCO decision. Neither the SA nor SEA in either plan identify or assess the significant effects the relocation will have on the site identified by AW as a ‘viable’ alternative within the Greater Cambridge area.

Comment

Greater Cambridge Local Plan Preferred Options

STRATEGY

Representation ID: 57538

Received: 10/12/2021

Respondent: Save Honey Hill Group

Representation Summary:

Visions and Aims
Fully support vision and aims. However, under Infrastructure there should be emphasis on serving the existing community as clearly there are established deficits , for example new sustainable transport systems to assist known  commuters, not purely for future growth eg ‘Plan for transport, water, energy and digital networks; and health, education and cultural facilities; in the right places and built at the right times to serve both our existing and growing communities. ‘

Comment

Greater Cambridge Local Plan Preferred Options

How much development and where?

Representation ID: 57548

Received: 10/12/2021

Respondent: Save Honey Hill Group

Representation Summary:

The scale and high density of housing development at North East Cambridge is not supported.
Greater Cambridge Shared Planning specifies that neither the Local Plan nor NECAAP require the relocation of CWWTP ie neither is dependent on it (Ref. Page 6 Appendix 2 PINS Scoping Opinion - GCP's response to Scoping Report).
The housing development allocated to S/NEC is reliant upon the relocation of CWWTP to the Green Belt
There is no existing or emerging  Local Plan allocation or justification for development of the Green Belt to accommodate or fulfil S/NEC. NECAAP Reg 19 Submission is premature and inappropriate.

Comment

Greater Cambridge Local Plan Preferred Options

S/DS: Development strategy

Representation ID: 57551

Received: 10/12/2021

Respondent: Save Honey Hill Group

Representation Summary:

The development strategy of Densification is not supported. This strategy puts the Aims & Objectives of the Local Plan at risk. : ‘Wellbeing & Social inclusion’ and ‘Great Places’ are of particular relevance here for both existing and growth populations here. As stated in the CPIER report (2018) if Cambridge does not remain an attractive place to live , the high levels of economic growth aspired to may fail.Sustainable transport initiatives are needed in the Greater Cambridge Area to assist commuting both in and out of Cambridge with its high level of job mobility.