Comment
Greater Cambridge Local Plan Preferred Options
Representation ID: 57517
Received: 10/12/2021
Respondent: Save Honey Hill Group
Aree with this policy in principle. However, the achievement of Policy S/NEC: North East Cambridge, appears to contradict this policy as the development on Cambridge North East Area is predicated on the relocation of the Cambridge Waste Water Treatment Plant to an area of Green Belt.
Note: Fulfilment of S/NEC Policy through relocation of CWWTP to the Green Belt is contrary to this Policy
Aree with this policy in principle. However, the achievement of Policy S/NEC: North East Cambridge, appears to contradict this policy as the development on Cambridge North East Area is predicated on the relocation of the Cambridge Waste Water Treatment Plant to an area of Green Belt.
Note: Fulfilment of S/NEC Policy through relocation of CWWTP to the Green Belt is contrary to this Policy