Support. Stand alone renewable energy projects supported in principle. There is a requirement for localised publically accessible anaerobic digestion plants to assist agriculture/chicken farming and removal of grass cuttings and tree and hedge trimmings/christmas trees to create electricity for the local area. Nearest public bio digester is in Suffolk/Essex. None in Cambridgeshire.

Full text:

Support. Stand alone renewable energy projects supported in principle. There is a requirement for localised publically accessible anaerobic digestion plants to assist agriculture/chicken farming and removal of grass cuttings and tree and hedge trimmings/christmas trees to create electricity for the local area. Nearest public bio digester is in Suffolk/Essex. None in Cambridgeshire.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 56743

Received: 03/12/2021

Respondent: Croydon Parish Council

Representation Summary:

Community power projects should be part of new settlements.

Full text:

Community power projects should be part of new settlements.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 56823

Received: 07/12/2021

Respondent: Dr Jonathan Graffy

Representation Summary:

The renewable energy and infrastructure policy needs to address the problems distributing electricity more effectively. Also there should be greater emphasis on encouraging property owners (developers, residential owners, landlords and commercial) to fit solar panels to roofs.

Full text:

Summary: The renewable energy and infrastructure policy needs to address the problems distributing electricity more effectively. Also there should be greater emphasis on encouraging property owners (developers, residential owners, landlords and commercial) to fit solar panels to roofs.

1. We have recently retrofitted insulation to our house in Grantchester, but both us and our neighbour were unable to install an air source heat pump because the cable in the road would not take the power load. UK Power Networks would have required at least £19,000 from us to upgrade the cable. We both still burn oil as a result. I suspect many Cambridgeshire villages have inadequate electricity cables, which will block the installation of fast charging for electric cars and Air Source Heat Pumps.

2. There are many, many roofs which could be have solar panels installed. The Cambridgeshire Solar Together initiative was a small step to improve this, but much more could be done.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 56882

Received: 08/12/2021

Respondent: Bassingbourn-cum-Kneesworth Parish Council

Representation Summary:

We support this policy.
Renewable energy projects should be developed early in the plan period in order to facilitate the move to electric vehicles and heat pumps.
Would some kind of scoring matrix / reference be useful to rank these projects against biodiversity and heritage?

Full text:

We support this policy.
Renewable energy projects should be developed early in the plan period in order to facilitate the move to electric vehicles and heat pumps.
Would some kind of scoring matrix / reference be useful to rank these projects against biodiversity and heritage?

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 56910

Received: 08/12/2021

Respondent: Save Honey Hill Group

Representation Summary:

Agree in principle. Suggest that Section 4vii needs to be expanded to include that not only visual impacts must be mitigated but also auditory, especially for wind energy.

Full text:

Agree in principle. Suggest that Section 4vii needs to be expanded to include that not only visual impacts must be mitigated but also auditory, especially for wind energy.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 56948

Received: 09/12/2021

Respondent: Cambridgeshire County Council

Representation Summary:

(Minerals and Waste) This policy may interact with the Cambridgeshire and Peterborough Minerals and Waste Local Plan, in respect of energy from waste and district heating. Early consultation about the wording of this policy would be appreciated.

Full text:

(Minerals and Waste) This policy may interact with the Cambridgeshire and Peterborough Minerals and Waste Local Plan, in respect of energy from waste and district heating. Early consultation about the wording of this policy would be appreciated.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 57023

Received: 09/12/2021

Respondent: Bedfordshire, Cambridgeshire & Northamptonshire Wildlife Trust

Representation Summary:

The Wildlife Trust support the inclusion of the policy and its proposed scope.

Full text:

The Wildlife Trust support the inclusion of the policy and its proposed scope.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 57172

Received: 10/12/2021

Respondent: Southern & Regional Developments Ltd

Agent: Claremont Planning Consultancy

Representation Summary:

It is considered that the Local Plan should support renewable energy production, use and investment including onshore wind capacity in Greater Cambridge.

Full text:

It is considered that the Local Plan should support renewable energy production, use and investment including onshore wind capacity in Greater Cambridge.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 57245

Received: 10/12/2021

Respondent: European Property Ventures (Cambridgeshire)

Agent: Claremont Planning Consultancy

Representation Summary:

It is considered that the Local Plan should support renewable energy production, use and investment including onshore wind capacity in Greater Cambridge.

Full text:

It is considered that the Local Plan should support renewable energy production, use and investment including onshore wind capacity in Greater Cambridge.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 57370

Received: 10/12/2021

Respondent: Huntingdonshire District Council

Representation Summary:

Huntingdonshire District Council supports a policy that provides a positive framework for stand-alone renewable energy projects and upgrades to grid capacity.

It is considered that any potentially hazardous uses such as battery storage facilities should be accompanied by a risk/safety assessment and appropriate responses to unforeseen events and meet the requirements as set out in the NPPG.



Full text:

Huntingdonshire District Council supports a policy that provides a positive framework for stand-alone renewable energy projects and upgrades to grid capacity.

The Council support criteria which consider the impacts on residential amenity and quality of life, landscape, biodiversity, heritage and water quality.
It is considered that any potentially hazardous uses such as battery storage facilities should be accompanied by a risk/safety assessment and appropriate responses to unforeseen events and meet the requirements as set out in the NPPG.

The Huntingdonshire Local Plan to 2036 supports proposals for renewable and low carbon energy through policy LP35. Consideration of Landscape, townscape and heritage impacts must be addressed as part of the development. The Council would expect any such development within proximity of the Huntingdonshire boundary to consider this in its assessment.
Huntingdonshire District Council have produced a Landscape Townscape SPD which can be used to assess the effects of any schemes that are in proximity to the Huntingdonshire District.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 57773

Received: 11/12/2021

Respondent: Carbon Neutral Cambridge

Representation Summary:

We support the proposed policy

Full text:

We support the proposed policy

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 57825

Received: 11/12/2021

Respondent: Mr Daniel Lister

Representation Summary:

Micro generation, with a mandate for solar panels on all new developments, could help meet the renewables target. Battery storage to help balance grid load is also an effective strategy to avoid peak demand requiring non-green energy generation.

Full text:

Micro generation, with a mandate for solar panels on all new developments, could help meet the renewables target. Battery storage to help balance grid load is also an effective strategy to avoid peak demand requiring non-green energy generation.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 57992

Received: 12/12/2021

Respondent: Cambridge Doughnut Economics Action Group

Representation Summary:

As stated in the section on net zero carbon new buildings, the renewable infrastructure needed will need to be large to meet the housing demand, let alone for the infrastructure. A very clear and integrated plan will be needed, rather than leaving it up to individual developers.

Full text:

As stated in the section on net zero carbon new buildings, the renewable infrastructure needed will need to be large to meet the housing demand, let alone for the infrastructure. A very clear and integrated plan will be needed, rather than leaving it up to individual developers.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 58311

Received: 13/12/2021

Respondent: Mrs Isabela Butnar

Representation Summary:

The direction of the policy looks good.
Is there a scope for district heating/cooling instead of individual homes?
No mention of smart grids to smooth peaks in demand/supply, which determine the size of required battery storage.
No mention of local use of waste e.g. in anaerobic digesters to generate compost and biogas, which can then be used locally.

Full text:

The direction of the policy looks good.
Is there a scope for district heating/cooling instead of individual homes?
No mention of smart grids to smooth peaks in demand/supply, which determine the size of required battery storage.
No mention of local use of waste e.g. in anaerobic digesters to generate compost and biogas, which can then be used locally.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 58416

Received: 13/12/2021

Respondent: Linton Parish Council

Representation Summary:

Support. But would not support onshore windfarms due to effect on landscape, loss of farmland, noise pollution and lack of wind in this area

Full text:

Support. But would not support onshore windfarms due to effect on landscape, loss of farmland, noise pollution and lack of wind in this area

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 58462

Received: 13/12/2021

Respondent: Marshall Group Properties

Agent: Quod

Representation Summary:

Marshall supports reducing carbon and increasing reliance on renewables. The potential for the use of on-site and local off-site renewables is also to be investigated as the vision develops and Marshall is currently seeking support to help develop an energy strategy focussed on renewables for Cambridge East.

Marshall also appreciates that there is significant movement towards greening of the centralised national grid. Marshall considers it may be more efficient in the future to utilise green energy from the grid rather than to produce it locally and therefore believes policy should be flexible enough to support that if necessary.

Full text:

Marshall supports this policy, with regards to reducing carbon and increasing reliance on renewables. The emphasis will be to support the design of development that is very energy efficient. The potential for the use of on-site and local off-site renewables is also to be investigated as the vision develops and Marshall is currently seeking support to help develop an energy strategy focussed on renewables for Cambridge East.

Marshall also appreciates, however, that there is significant movement towards greening of the centralised national grid. Marshall considers it may be more efficient in the future to utilise green energy from the grid rather than to produce it locally and therefore believes policy should be flexible enough to support that if necessary.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 58632

Received: 13/12/2021

Respondent: Cambridge Past, Present and Future

Representation Summary:

Policy must clearly protect the character and appearance of the landscape.
Need clear guidance on where wind and solar farms and energy infrastructure is acceptable.

Full text:

Policy must clearly protect the character and appearance of the landscape.
Need clear guidance on where wind and solar farms and energy infrastructure is acceptable.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 58760

Received: 13/12/2021

Respondent: Trumpington Meadows Land Company (‘TMLC’) a joint venture between Grosvenor Britain & Ireland (GBI) and Universities Superannuation Scheme (USS)

Agent: Grosvenor Britain & Ireland

Representation Summary:

TMLC supports the development of renewable energy within new developments and in-accordance with Policy CC/NZ.

Full text:

TMLC supports the development of renewable energy within new developments and in-accordance with Policy CC/NZ.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59036

Received: 13/12/2021

Respondent: Royal Society for the Protection of Birds (RSPB)

Representation Summary:

Renewable energy projects need to be located appropriately and impacts on biodiversity minimised.

Full text:

RSPB supports the principles set out. Renewable energy provision in Greater Cambridge will provide an important contribution towards net carbon neutral targets. However, as with all infrastructure development, it can, and does have negative impacts on biodiversity if located in the wrong place or implemented insensitively to the environment present (eg: presence of priority spp populations and/or priority habitats). Therefore, we also support the provision of biodiversity impact criteria specific to renewable projects. As we mentioned in our previous consultation response, RSPB’s report Energy Futures has mapped how the UK can meet very high renewable energy provision whilst safeguarding nature and we would be pleased to discuss with the Greater Cambridge Councils how our Energy Vision peer-reviewed mapping methodology could be used to help identify suitable sites for renewable and low carbon energy.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59195

Received: 13/12/2021

Respondent: Cambourne Town Council

Representation Summary:

Cambourne Town Council understands the need for this policy as it addresses the aims contained in the vision.

Full text:

Cambourne Town Council understands the need for this policy as it addresses the aims contained in the vision.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59574

Received: 13/12/2021

Respondent: Campaign to Protect Rural England (CPRE)

Representation Summary:

Policy CC/RE: Renewable energy projects and infrastructure, is totally ineffective to halt the use of scarce farm land for solar energy generation and instead ensure that solar installations are mandated on all industrial buildings, new and existing.

Full text:

Climate change – development issues
40. CPRE largely supports Policy CC/NZ: Net zero carbon new buildings. However, to be effective it needs to be
taken in conjunction with three further policies which we have not discovered in the draft Local Plan,
namely:
• a ‘brownfield first’ policy for new building
• a policy to minimise the number of new buildings and developments in the Greater Cambridge
region
• a policy to halt the use of scarce farm land for solar energy generation and instead ensure that solar
installations are mandated on all industrial buildings, new and existing. Policy CC/RE: Renewable
energy projects and infrastructure, is totally ineffective in this respect.
41. The draft Local Plan is not consistent with national government policy because it does not follow a
'brownfield first' approach. It is also concerning that the Plan is seeking to build more houses in the
Cambridge area than required by current planning legislation and the ‘five-year land supply’.
42. As stated above, the Plan assumes the development of the Ox-Cam Arc, which is leading to more greenfield
building which maximises carbon emissions. The Local Plan should not be accepting the Arc, instead the
local planning authorities should be firmly resisting this outdated idea of ‘clustering’ of science-based
businesses. These businesses operate globally, increasingly using the internet to minimise business travel
and they can operate anywhere. The development of vaccines during the pandemic has proved the
effectiveness of remote collaborative working on a global scale.
43. Rather than encouraging further building on precious high grade farm land around Cambridge all
responsible local organisations involved in planning, including the University and businesses, should be
encouraging and enabling redevelopments in other regions, where there are up to 1 million empty homes
and space for 1.3 million more on registered brownfield sites.
44. Embedded carbon emissions arising from construction appear to be ignored in the Plan. Cement
manufacture contributes 8% of global carbon emissions which is more than three times the impact of
aviation fuel. Iron and steel production accounts for another 8%. Between them they account for more
emissions than the USA and are second only to China as greenhouse gas emitters.
45. According to the recent Cambridge and Peterborough Climate Commission report, at the present rate the
Region will have used up its entire carbon budget, allocated to meet its legal obligation to reach zero carbon
by 2050, in less than six years; due to the level of planned growth, emissions will accelerate further.
46. The Climate Change Committee, led by Lord Deben, has argued in its 2018, 2019 and 2020 Annual Reports
to Parliament that UK local and imported emissions arising from construction, must be reduced if the UK is
to meet its now legal emission targets. Yet this Plan is seeking to increase construction.
47. Large areas of some ‘brownfield’ sites, such as old airfields like Oakington, Waterbeach and Bourn, are not
brownfield at all. Only their disused runways, hard-standing and associated buildings are brownfield and
most of their area is already turned back to use as productive farmland. It is unacceptable that local
planning authorities are blindly ignoring this fact.
48. All unsustainable growth must be halted as a matter of global and national emergency, yet the level of
building and infrastructure growth contained in the draft Local Plan breaches all obligations for sustainable
development other than those arising from future operation.
49. Policy CC/DC: Designing for a changing climate, is closing the stable door after the horse has bolted.

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59670

Received: 13/12/2021

Respondent: Historic England

Representation Summary:

We broadly welcome the proposal to include a policy for renewable energy projects in the Plan. We make the following comments regarding the policy considerations for renewable energy projects and the historic environment and we would expect the emerging policy to reflect these considerations.Policies should include consideration of the impact on the historic environment for all commercial renewable energy technologies, Renewable energy policies should include reference to heritage assets and their settings (in conjunction with Local Plan heritage policies) and should seek to ensure that any harm to the significance of a heritage asset is satisfactorily addressed in the planning balance.The policy, or its supporting text, should not use arbitrary distance measurements for assessments from heritage assets to locations proposed for large-scale renewables. Instead the policy should ensure that settings are fully assessed, on a case by case basis.Biofuel crops such as short rotation coppice (willow) and Miscanthus can have a substantial below ground impact on buried archaeology, especially waterlogged archaeology. Palaeochannels, peats, kettle holes and other glacial features that preserve waterlogged sediments are often the very areas targeted for growing energy crops. Many of these impacts on the archaeological resource are covered by the Preservation of Archaeological Remains guidance (i.e. such as the impacts of dewatering sensitive waterlogged features):
https://historicengland.org.uk/images-books/publications/waterfeatures-historic-settings/including wind power (onshore and offshore), solar photovoltaics (PVs), hydropower, biomass and Energy from Waste facilities (EfW).Refer to Historic England Advice Note 15 (February 2021) for further information on commercial scale renewable energy development: https://historicengland.org.uk/images-books/publications/commercialrenewable-energy-development-historic-environment-advice-note15/heag302-commercial-renewable-energy-development-historicenvironment/
Para.155 of the NPPF advises LPAs to consider identifying suitable areas for renewable and low carbon energy sources in their plans and strategies. Therefore, your plan’s evidence base should include studies assessing areas of potential, particularly for the suitability of wind and solar power generation. An appropriate methodology should be used; i.e. all heritage assets in the area should be identified, arbitrary distance measurements should be avoided, and the setting of heritage assets should also be included as a consideration.

Full text:

Thank you for consulting Historic England on the First Proposals Public Consultation for the Greater Cambridge Local Plan. As the Government’s adviser on the historic environment Historic England is keen to ensure that the protection of the historic environment is fully considered at all stages and levels of the local planning process.

Cambridge is a beautiful, compact and historic city. It is also an historic seat of learning with a very high concentration of highly graded heritage assets. Much of the city is covered by Conservation Area status. The river corridor, green fingers and open spaces, with cows grazing in meadows even at the heart of the city, shape the character of the townscape and landscape.

Although a relatively flat landscape, the elevated positions to the west and south of the Cambridge afford important views across the city skyline, which is one of extensive tree cover and emerging spires. The flatter Fens landscape to the north and east provides very long-distance views of the City and the big east Anglian skies.

The surrounding rural hinterland of South Cambridgeshire comprises over 100 villages, each with their own unique character and heritage. New settlements are an important feature of the district, with their own special identity and are growing rapidly.

We recognise the area faces intense pressure for growth, driven by both the economic success and the attractiveness of the area, in large part a consequence of

its rich architectural and cultural heritage. This growth must be carefully managed to ensure that the very things that contribute to its success are not harmed in the process.

It is for this reason that Historic England is keen to ensure that the emerging plan gives full consideration to the historic environment, both in the choice of site allocations and policy criteria for sites, as well as through a robust and clear suite of historic environment and other policies that seek to both protect but also enhance the historic environment.

We have reviewed the Draft Plan and consultation material with a view to providing advice on heritage matters.

As a general comment, Historic England welcomes emerging plan and work undertaken to date. We have however identified below some of the key issues to be addressed in progressing the next iteration of the Plan: This should be read in conjunction with Appendix A which provides more detailed comments on these and other more minor issues.

a) Site Assessment and the need for Heritage Impact Assessments

We are pleased to note that a degree of site assessment has already been undertaken in relation to the historic environment. These are set out in the HELAA Report, especially Appendix 4.

To date, the assessment of sites is fairly high level and brief but provides a useful starting point, in particular helping to identify immediate showstoppers. We note that many of the sites are shown as amber.

As we have discussed previously, the need for further assessment of heritage in terms of significance, impact on that significance, potential mitigation and enhancements etc will be needed for the site allocations. There is currently an insufficient evidence base in this regard. We therefore welcome your commitment to undertake Heritage Impact Assessments for site allocations. These should be prepared prior to the next draft of the Local Plan.

This further assessment, known as Heritage Impact Assessment (HIA) should follow the 5 step methodology set out in out in our advice note, HEAN 3 on Site Allocations in Local Plans https://historicengland.org.uk/images- books/publications/historic-environment-and-site-allocations-in-local-plans/.

HIAs should be proportionate (both to the scale of the site and the assets affected). All potential sites will need to be appraised against potential historic environment

impacts. It is imperative to have this robust evidence base in place to ensure the soundness of the Plan. We recommend that the appraisal approach should avoid merely limiting assessment of impact on a heritage asset to its distance from, or inter-visibility with, a potential site.

Site allocations which include a heritage asset (for example a site within a Conservation Area) may offer opportunities for enhancement and tackling heritage at risk, while conversely, an allocation at a considerable distance away from a heritage asset may cause harm to its significance, rendering the site unsuitable.

Impacts on significance are not just based on distance or visual impacts, and assessment requires a careful judgment based on site visits and the available evidence base. Cumulative effects of site options on the historic environment should be considered too.

The following broad steps might be of assistance in terms of assessing sites:

• Identify the heritage assets on or within the vicinity of the potential site allocation at an appropriate scale
• Assess the contribution of the site to the significance of heritage assets on or within its vicinity
• Identify the potential impacts of development upon the significance of heritage asset
• Consider how any harm might be removed or reduced, including reasonable alternatives sites
• Consider how any enhancements could be achieved and maximised
• Consider and set out the public benefits where harm cannot be removed or reduced

The HIAs should assess the suitability of each area for development and the impact on the historic environment. Should the HIA conclude that development in the area could be acceptable and the site be allocated, the findings of the HIA should inform the Local Plan policy including development criteria and a strategy diagram which expresses the development criteria in diagrammatic form.

Which sites require HIA?

Ideally all sites should have an HIA, albeit proportionate to the site and heritage sensitivities.

For existing allocations being carried forward into this Local Plan, the HIA is less about the principle of development (that has already been established through previous plan allocation) and more about exploring capacity, height, density and any heritage mitigation and enhancement opportunities so that these can then be

included in the updated policy wording.

For new allocations, the HIA will be a more holistic view and consider both the principle of development as well as the other matters identified above.

b) Policy Wording for sites

If, having completed the heritage impact assessments, it is concluded that a site is suitable for allocation, we would remind you to include appropriate policy criteria for the historic environment in the policy. Please refer to the advice we give on policy wording in the attached table.

It can be helpful to refer to an HIA in the policy wording. Concept diagrams can also be useful to include in the plan to illustrate key site considerations/ recommendations.

c) Edge of Cambridge sites

The Plan proposes carrying forward a number of partially built out allocations on the edge of the City as well as some minor extensions to these. The Plan also proposes revisiting the dwelling capacity/density for some of these sites e.g. Eddington.

Proposals for North East Cambridge are very high density and also quite tall.

The Plan also includes a very large new allocation at East Cambridge (previously released from the Green Belt and allocated in the 2006 Plan, although not in the 2018 Plan). The number of dwellings now being proposed represents a significant increase in density from the 2006 Plan.

We have some concerns regarding these densities and heights on edge of Cambridge sites. Development at very high densities/heights and the potential impact on the overall setting of this historic city. HIAs should give careful consideration to the issue of development and site capacity and height – we will be looking for evidence in this regard.

d) Historic Environment Policy

We welcome your intention to include a policy for the Historic Environment. This should cover both designated and non-designated heritage assets. Policy wording should be in line with the NPPF but we are also looking for a local flavour.

Policies should be spatially specific, unique to the area, describing the local characteristics of the area and responding accordingly with policies that address the local situation.

You should also include a policy for Heritage at Risk and a policy for historic shopfronts. For further detail see Appendix A.

e) Design Policy

We welcome the proposals for a design policy on the plan. We note that this policy is also intended to address tall buildings. We are concerned that the policy might become overly long and detailed, given it is covering such a wide and important range of issues and wonder whether separating out tall buildings into a separate policy might be helpful?

f) Tall Buildings Study and Policy

Related to the above, given the growth pressures that we would anticipate Cambridge is likely to experience over the coming years, we are pleased to see that the matter of Tall buildings and the skyline will be addressed in policy.

We had understood that you were commissioning a study in relation to tall buildings and the skyline policy. Is this still proposed to inform the policy in the next draft of the Local Plan?

See our advice note HEAN 4 and the consultation draft of HEAN 4. Any policy should indicate what considerations are needed for taller buildings, where buildings may or may not be appropriate etc. and in particular consider in the impact on the historic environment.

We broadly welcome policy 60 and Appendix F of the 2018 Cambridge City Local Plan. However, we consider that this could be further supplemented to indicate which areas may or may not be suited to taller buildings. Our advice note in relation to tall buildings provides further guidance in this respect

We have been having discussions with the team preparing The North East Area Action Plan in relation to tall buildings studies and have provided a detailed advice letter in that regard. Please refer to our advice letters in relation to NEA Action Plan and tall buildings for further information on our position.

g) Other Supporting Evidence

We welcome the preparation of the HELAA although consider that further, more detailed evidence is needed in relation to heritage impact and so welcome your intention to prepare HIAs for site allocations.

We broadly welcome the Strategic Heritage Impact Assessment including the baseline study of the setting of Cambridge. However, we have expressed some concerns regarding some aspects of this baseline, in particular the weighting given to some of the key characteristics and aspects of setting of Cambridge including views. Further detail is given in Appendix A.

We welcome the evidence in relation to landscape character assessment. We do however continue to suggest that it would also be helpful to commission Historic Landscape Characterisation work for inform this Plan and future growth in the area.

We welcome the production of the Sustainability Appraisal. We would comment however that since many of the site allocations are grouping together under particular policies, the different impacts for individual sites are not always drawn out in the assessment tables – this sometimes has the effect of neutralising the scoring.

Historic England – Ox Cam research work

Historic England has commissioned consultants to undertake some work looking at development in the OxCam Arc. ‘Measuring Impact: Managing Change’ looks at the question, ‘How should the form of growth in the Oxford-Cambridge arc positively respond to the Historic Environment’. This research is due to report in the next few months and we hope to be able to share this with you at that time as it may provide useful evidence to inform your Local Plan work.

Other comments

In preparation of the forthcoming Greater Cambridge Local Plan, we encourage you to draw on the knowledge of local conservation officers, archaeologists and local heritage groups.

Please note that absence of a comment on an allocation or document in this letter does not mean that Historic England is content that the allocation or document forms part of a positive strategy for the conservation and enjoyment of the historic environment or is devoid of historic environment issues. Where there are various options proposed for a settlement, identification of heritage issues for a particular

allocation does not automatically correspond to the support for inclusion of the alternative sites, given we have not been able to assess all of the sites.

Finally, we should like to stress that this opinion is based on the information provided by the Council in its consultation. To avoid any doubt, this does not affect our obligation to provide further advice and, potentially, object to specific proposals, which may subsequently arise where we consider that these would have an adverse effect upon the historic environment.

We trust that these comments are helpful to you in developing the Local Plan. Should you have any queries, please do not hesitate to contact us.

We suggest it might be helpful to set up a meeting to discuss our comments and, in particular, heritage impact assessments and policy wording for site allocations.
Please feel free to suggest some dates.

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59916

Received: 13/12/2021

Respondent: Fen Ditton Parish Council

Representation Summary:

Broad support but OBJECT to standalone projects in the Green Belt and lack of weight given to success of National Grid in importing sustainable energy to GC or role of district schemes in major new developments.

Full text:

Broad support but OBJECT to standalone projects in the Green Belt and lack of weight given to success of National Grid in importing sustainable energy to GC or role of district schemes in major new developments.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59975

Received: 13/12/2021

Respondent: Natural England

Representation Summary:

We support requirements for renewable energy projects to consider impacts on biodiversity, geodiversity, landscape and water quality.

Full text:

Thank you for consulting Natural England on the above in your letter dated 1 November 2021.

Natural England is a non-departmental public body. Our statutory purpose is to ensure that the natural environment is conserved, enhanced, and managed for the benefit of present and future generations, thereby contributing to sustainable development.

Natural England’s key comments
We are pleased that many of our comments at the Issues and Options stage, in our letter dated 24 February 2020 (ref. 304246), are reflected in the First Proposals Plan, helping to strengthen the Plan’s approach to the ‘big themes’ including climate change, biodiversity and green spaces, wellbeing and social inclusion. Natural England supports the general thrust of the Plan in directing development to where it will have least environmental impact and provide opportunities for enhancements.

Natural England’s previous advice highlighted the need for the Plan to address uncertainties relating to water resources and infrastructure needed to support new growth, in light of evidence that current levels of abstraction are already damaging the natural environment. We also signalled the need for the establishment of a strategic green infrastructure network that is resilient to the scale of proposed Plan development, capable of meeting people’s needs and addressing adverse impacts to the natural environment. We therefore welcome that the First Proposals Plan recognises the challenges in identifying long-term and interim solutions to the current water resource crisis to enable sustainable development without further detriment to the natural environment. We support the Plan’s progress, through the Green Infrastructure Recommendations (LUC, September 2021), in presenting opportunities for the Plan to deliver /contribute towards delivery of strategic green infrastructure.

Notwithstanding the above, Natural England believes significant additional work is required through the next stages of Plan preparation to progress these ‘solutions’ and demonstrate that development can be delivered sustainably. We have major concerns with the scale of proposed Plan development, and the 2041 timeframe for delivery, given the damage already being inflicted on the natural environment and the lengthy lead-in time for identification and delivery of measures to address the water resource issue and to implement strategic green infrastructure. Some of this Plan development is already progressing, through the adopted strategy, prior to solutions being identified and implemented; the natural environment is already being impacted. The Plan should consider how these impacts and spiralling environmental deterioration can be retrospectively

mitigated.

The section on ‘Ensuring a Deliverable Plan – Water Supply’ recognises the challenge relating to water resources; however, the Councils need to act urgently, in collaboration with relevant stakeholders, to identify strategic and interim water resource/infrastructure solutions to ensure any level of proposed development is delivered sustainably. There are currently no measures in place to mitigate the adverse effects of current development on the natural environment i.e., more water is being abstracted from the aquifer to serve this development, depleting groundwater resources and causing further declines in the condition of designated sites and supporting habitat.

Potential solutions to address Greater Cambridge’s green infrastructure deficit, and the recreational pressure effects of development, lie within the Green Infrastructure Initiatives identified in LUC’s Opportunity Mapping Recommendations Report. Natural England fully supports the Initiatives identified; however, these aspirational areas must be progressed into real projects that are happening on the ground by the time the Plan is adopted. Robust Plan policy requirements should secure funding for the delivery and long-term management of these projects from all major development.

We have provided additional comments on the Plan’s key themes and policies below; however, reference should be made to the detailed advice provided in our response to the Issues and Options consultation.

Vision and aims
We support the Plan vision and aims for decreases in our climate impacts and increase in quality of life for communities, minimising carbon emissions and reliance on the private car, increases in nature, wildlife, greenspaces and safeguarding landscapes focusing on what is unique to Greater Cambridge embracing bold new approaches.

Natural England strongly recommends that the vision should advocate a more holistic approach to securing multi-functional benefits through the protection and enhancement of the natural environment. In accordance with paragraphs 17 and 109 of the National Planning Policy Framework (NPPF) the Plan should encourage multiple benefits from the use of land in urban and rural areas, recognising that land can deliver a wide range of ecosystem services required for sustainable development including climate change mitigation, flood management, improved water resources and water quality, biodiversity net gain, accessible high quality green infrastructure and associated health and wellbeing benefits, enhanced landscapes and soil resources.

The Plan should contribute to and enhance the natural and local environment by recognising the wider benefits of ecosystem services, considering a natural capital evidence approach and making strong links to the Nature Recovery Network and the Cambridge Nature Network. National Habitats Network mapping is available to view at www.magic.defra.gov.uk.

Development Strategy
The Plan will deliver around 44,400 new homes and provide for approximately 58,500 new jobs. We welcome that the new development strategy aims to meet our increased need for new homes in a way that minimises environmental impacts and improves the wellbeing of our communities.
The strategy proposes 19 additional sites for development, along with sites already allocated in the adopted 2018 Local Plans, along with associated infrastructure including green spaces.

We support proposals to direct development to where it has the least climate impact, where active and public transport is the natural choice, where green infrastructure can be delivered alongside new development, and where jobs, services and facilities can be located near to where people live. The vision includes creating new city neighbourhoods which have the critical mass of homes, jobs and services to create thriving communities, making best use of brownfield and safeguarded land and making the most of public transport links.

Natural England welcomes the use of evidence including the Employment Land and Economic Development Evidence Study and the Greater Cambridge Housing and Employment Relationships

Report to understand the relationship between future jobs and housing growth. We note that these studies found that planning for the standard method housing figure set by government would not support the number of jobs expected to arise between 2020 and 2041. Planning for this housing figure would risk increasing the amount of longer distance commuting into Greater Cambridge, with the resulting impacts on climate change and congestion. On this basis planning for a higher jobs figure and planning for government’s standard method local housing need figure have been rejected as reasonable alternatives.

We note that high-level consideration has been given to the potential impacts of COVID-19 on the economy of Greater Cambridge, to inform this First Proposals consultation. We support the proposal to gather evidence to consider the potential longer-term quantitative impacts of COVID- 19 prior to the Draft Plan stage to understand any implications for the objectively assessed need for jobs and homes for the plan.

Natural England has no objection in principle to the proposed Plan development strategy; however, this is subject to: 1) the identification of strategic water supply solutions and / or interim measures; and 2) development of deliverable strategic GI initiatives and developer requirements and funding mechanisms being secured through the Plan.

Policy S/DS: Development strategy
Figure 6: Map shows proposed sites to be included in the Plan including existing planning permissions alongside a limited number of new sites in the most sustainable locations. We welcome that the sustainability merits, opportunities and constraints for each of the nine potential strategy choices have been considered through the Sustainability Appraisal. Alongside considering the best locations for new homes and jobs, consideration has also been given to the best locations to restore the area’s habitat networks and provide more green spaces for people providing health and wellbeing benefits. Natural England fully supports the identification of 14 Strategic Green Infrastructure Initiatives, through the Green Infrastructure evidence, to help achieve this. We welcome the approach to preparing the preferred development strategy / draft allocations and green infrastructure initiatives in parallel.

We support the general policy direction to focus development where it will have the least climate impact, where it can be aligned with active and public transport, opportunities for delivery of green infrastructure and where jobs, services and facilities can be located nearby whilst ensuring all necessary utilities can be provided in a sustainable way. We support the approach to using less land for development to reduce carbon emissions and allow more space for nature and wildlife.
The strategy focuses on opportunities to use brownfield land and opportunities created by proposed major new infrastructure.

We note that delivery of the adopted strategy is progressing well with development permitted/underway /completed at the edge of Cambridge sites and new settlement sites including Northstowe and Waterbeach New Town. Natural England is aware that these schemes are being delivered in the absence of adequate sustainable water supply infrastructure to serve the development without adverse impact to the natural environment including statutorily designated sites. Many of these schemes are also unlikely to deliver sufficient level of accessible high quality green infrastructure to meet the needs of new residents without adverse recreational pressure impacts to the existing ecological network including statutorily designated sites. These issues need to be addressed urgently through further stages of Plan preparation as discussed in our advice above and below.

Ensuring a deliverable plan – water supply
We welcome the Councils’ recognition that water supply is a significant issue for the deliverability of the Local Plan and we fully support preparation of the Integrated Water Management Study: Outline Water Cycle (WCS) by Stantec (August 2021) to address this. The WCS has identified the need for new strategic water supply infrastructure, such as a new fens reservoir, to provide for longer term needs, and to protect the integrity of the chalk aquifer south of Cambridge, in addition to a range of interim demand management measures. The draft Sustainability Appraisal also identifies significant environmental impacts if the issue is not resolved. This is a major concern for

Natural England in light of proposed growth levels and the damaging effects that groundwater abstraction is already having on the natural environment including water-dependent designated sites and important chalk stream habitats. Natural England has provided its detailed advice on this matter, and highlighted the statutorily designated sites potentially affected, in our response to the consultation on the WCS. These ‘Designated Sites of Concern’ are listed in Appendix B of the August 2021 report.

We are aware that Water Resources East is currently preparing its Water Management Plan for the region and that this will help to identify long-term measures to address the issue. However, these strategic measures, including a new fens reservoir, are unlikely to be available until the 2030’s hence interim measures are required to enable some level of sustainable growth. We welcome the suggestion of including Plan policies to phase delivery of development that can be supported by a sustainable water supply until new strategic infrastructure is in place; however, it will need to be clearly demonstrated that interim solutions are sustainable and will not cause further environmental decline. The risk is that it may not be possible to demonstrate delivery of the full objectively assessed needs within the plan period.

Natural England appreciates that pressure on water supplies is a regional issue. We share the Councils’ aspirations that the water industry, supported by government, will set out its intentions for positively addressing this key infrastructure issue at an early point in the ongoing plan making process, to provide confidence that adequate water supply will be available to support delivery of the preferred options allocations, before the next stage of a full draft Local Plan. In our view the Councils need to act urgently, in collaboration with relevant stakeholders, to identify strategic and interim water resource/infrastructure solutions, including demand management measures, to ensure any level of proposed development is delivered sustainably.

We have serious concerns that Plan development is already being progressed, through the adopted strategy, without sustainable water supply measures in place. More water will be abstracted from the aquifer to serve this development, depleting groundwater resources and causing further declines in the condition of designated sites and supporting habitat. The Plan will need to consider the impacts of this development and identify measures to address adverse environmental impact.

Natural England fully supports the concerns raised by the Environment Agency, as lead authority on this matter, including the high degree of uncertainty as to whether sufficient sustainable water supplies can be provided for the proposed growth over the plan period without further detriment to the natural environment. Further development of the WCS, informed by evidence from regional and water company water resource plans, will need to demonstrate that appropriate deliverable mitigation measures can support sustainable growth until new strategic water supply infrastructure becomes operational. We agree with the Environment Agency that it in the face of current challenges it may be appropriate to consider an extended timeframe for delivery of Plan development to limit further environmental degradation until new strategic measures become available. This would allow further time for the identification of truly sustainable options that build in resilience to climate change and robust mitigation and monitoring measures to address impacts to the natural environment and restore habitat condition.

Duty to Cooperate
Natural England welcomes consideration of how the Plan fits with other plans and strategies including cross boundary projects such as the Ox Cam Arc. We support recognition of the Plan to be prepared within a wider regional context noting the Councils’ legal duty to cooperate with key stakeholders and surrounding areas of cross boundary issues. We agree that the development of a clear and positive vision for the future of the Greater Cambridge area can help to shape the proposals for the Ox Cam Arc, noting that the outcome of the Oxford-Cambridge framework is currently awaited.

We particularly support the Councils’ recognition that the water supply challenge discussed above is a serious issue to be resolved.

Natural England will be pleased to engage with the Councils in the preparation and development of a draft Statement of Common Ground.

Transport Strategy
Natural England welcomes that the proposed strategy is heavily informed by the location of existing and committed public transport schemes. We support the use of transport modelling to understand whether additional infrastructure and policies are required to address the transport impacts of the preferred development strategy.

Transport policies should include requirements for projects to undertake robust ecological impact assessment and application of the ecological mitigation hierarchy.

Site allocation policies
Proposed site allocation policies are described through sections 2.2 – 2.5. Natural England has no objection in principle to the existing and new allocations, areas of major change or opportunity areas being taken forward for development. However, this is subject to:
• identification of strategic water supply infrastructure and/or feasible interim solutions to demonstrate that development can be delivered sustainably and without adverse impact to the natural environment;
• establishment of a framework and robust plan policies to deliver the 14 Strategic Green Infrastructure initiatives ahead of development, to meet development needs and to address the effects of recreational pressure on sensitive sites and habitats.

The site allocation policies will need to include robust requirements to secure delivery of biodiversity net gain and on-site accessible green infrastructure to meet people’s need and to contribute towards the Plan’s 20% BNG targets and delivery of the Nature Recovery Network / Cambridge Nature Network. Our advice is that major allocation policies should set a framework for development to maximum opportunities for environmental gains.

Climate Change
We welcome the proposed policies relating to net zero carbon and water efficiency, designing for climate change, flooding and integrated water management, renewable energy projects, reducing waste and supporting land-based carbon sequestration. We particularly support the proposed requirement for residential developments to be designed to achieve a standard of 80 litres/person/ day; however, we support the Environment Agency’s concerns as to whether the Plan is likely to achieve the reductions in demand required to support sustainable growth. As indicated above the WCS will need to demonstrate how water, to meet growth needs, will be supplied sustainably without adverse impact to the natural environment.

Proposed requirements for developments to provide integrated water management, including sustainable drainage systems (SuDS) where possible and for SuDS and green /brown roofs to provide multiple benefits (including biodiversity and amenity) are welcomed.

We support requirements for renewable energy projects to consider impacts on biodiversity, geodiversity, landscape and water quality.

Natural England welcomes a proposed policy to support the creation of land and habitats that play a role as carbon sinks and protect existing carbon sinks from development, particularly peatlands such as those remaining in the north of South Cambridgeshire district. We welcome recognition of the importance of peatlands as a carbon store and the role of other habitats such as woodlands and grasslands, noting loss and degradation of natural habitats results in the direct loss of carbon stored within them.

As indicated above we recommend that the Plan takes a more holistic approach to securing multi- functional benefits for climate change, flood management, water resources and water quality through the protection and enhancement of the natural environment. Natural solutions can achieve significant additional benefits for biodiversity, green infrastructure and associated health and wellbeing benefits, enhanced landscapes and soil resources.

Biodiversity and green spaces
We strongly support the proposed biodiversity and green spaces policies and the inclusion of Figure 53 depicting the existing Greater Cambridge green infrastructure network including designated sites.

We welcome that these policies will help to deliver the aims of the Ox Cam Arc of doubling the area of land managed primarily for nature and to deliver a minimum 20% biodiversity net gain on development sites, beyond the mandatory 10% biodiversity net gain requirements of the Environment Act 2021. We agree that Greater Cambridge has a relatively low level of designated sites and priority habitats, highlighting the need for development to deliver net gains beyond the 10% proposed nationally, hence we are fully supportive of minimum 20% BNG ambitions. Our advice is that the Councils, working with key partners, should identify BNG opportunities through the next phases of Plan preparation. This should take the form of a BNG opportunities / requirements map building on the foundations of the Nature Recovery Network and the Cambridge Nature Network. National Habitats Network mapping is available to view at www.magic.defra.gov.uk.

The Councils should also set a landscape / GI framework for the Site Allocations to maximise opportunities for delivery of GI and BNG within the development sites.

BG/BG: Biodiversity and geodiversity
Natural England fully supports this policy and requirements for development to achieve a minimum 20% biodiversity net gain, delivered on site where possible and calculated using the Defra Metric
3.0 or its successor. Requirements for off-site measures to be consistent with the strategic aims of the Greater Cambridge green infrastructure network strategic initiatives are welcomed.

The policy should take a natural capital evidence approach and recognise the wider benefits of ecosystem services for climate change, flood risk management, green infrastructure and health and wellbeing, in addition to biodiversity. They main thrust of this policy should be the Plan’s contribution to the Nature Recovery Network / Cambridge Nature Network and the establishment of a framework for the development of a Local Nature Recovery Strategy.

We support proposed requirements for development to avoid adverse impact to site of biodiversity or geological importance and development to mitigate recreational pressure on statutorily designated sites, applying Natural England’s SSSI Impacts Risk Zones (IRZs). The Plan’s biodiversity policy should recognise the hierarchy of international, nationally and locally designated sites across Greater Cambridge. This should be accompanied by a map of the existing ecological network and enhancement opportunity areas to guide site allocations / development away from more sensitive areas and to identify opportunities for developers to deliver net biodiversity gain enhancements.

We welcome that the policy will seek wider environmental net gains. These should focus on measures to restore ecological networks, enhance ecological resilience and provide an overall increase in natural habitat and ecological features.

Reference should be made to the detailed advice provided in our response to the Issues and Options consultation with regard to protecting and enhancing biodiversity including designated sites, priority habitats, ecological networks and priority and/or legally protected species populations. This includes additional detailed advice on embedding biodiversity net gain into the Greater Cambridge Local Plan policies.

BG/GI: Green infrastructure
We welcome the comprehensive and thorough approach taken in developing the GI evidence base for the Greater Cambridge Local Plan, including the Opportunity Mapping and the identification of 14 Strategic GI initiatives. The multifunctional benefits of GI are fully recognised, as well as the links between GI provision and the delivery of other strategic policy areas including the wider natural environment, sustainable transport and social inclusion. These threads/links

should continue through future drafts to ensure the value of GI for people and the natural environment is fully reflected in the Local Plan.

The Strategic GI initiatives are comprehensive and capture a wide variety of GI opportunities within the 14 proposals; this range of GI elements and habitats will help to maximise benefits for people and nature through the strategic planning and delivery of GI across Greater Cambridge. We support the emphasis given to blue infrastructure in Strategic Initiatives 1 and 2 given the considerable pressures on Cambridgeshire’s chalk streams and aquifer from agriculture and development. The Chalk Stream Strategy Report1 recently published by CaBA identifies a number of recommendations to protect/restore chalk stream habitats, including those in areas of high population density such as Cambridge. This report may be a useful reference in planning and progressing strategic blue infrastructure initiatives as part of the Greater Cambridge Local Plan.

We support the proposed approach to have a distinct GI policy within the Local Plan, rather than a stand-alone SPD. As noted in the Topic Paper, we agree that the policy should require all developments to contribute towards GI and that it should be incorporated into design from an early stage and through all phases of development, with a longer-term plan in place for its management and maintenance. As well as a GI policy, Green Infrastructure should be integrated into other strategic policy areas and Local Plan themes where relevant. This will give weight to the multifunctional role of GI and demonstrate where it can contribute to policy delivery and outcomes (e.g., in climate change adaptation, supporting healthy communities etc). It will also support the role of GI in implementing other mechanisms and tools, such as Biodiversity Net Gain, and may help in targeting and prioritising opportunities for GI creation and enhancement.

In addition to securing GI within individual developments, the Local Plan should also provide a framework for proposals to contribute to / link up with the wider Strategic Initiatives, including the ‘dispersed initiatives’ 10-14 (e.g., ‘Expanding the Urban Forest’). Consideration should also be given to potential join-ups on cross-boundary projects and, in time, how the strategic GI network in Greater Cambridge may contribute to greenspace at the regional level (as one of the 5 Ox-Cam counties). There may also be overlaps with other initiatives, such as the Nature Recovery Network, where Cambridgeshire’s GI resource can make an important contribution (such as that highlighted in Strategic Initiative 3 for the Gog Magog Hills and Chalkland fringe).

We note from the Part 2 Recommendations Report that there are several points for further consideration, including the funding mechanisms required to ensure that all developments include GI and contribute towards the strategic initiatives. Funding mechanisms (e.g., developer contributions) should be embedded in policy where required and should be identified as early as possible to ensure that benefits are secured long-term. For example, the policies for major allocations will need to include specific requirements for the funding / delivery of the strategic GI ahead of the developments being occupied so that these are clear from the outset. The report presents a number of potential funding sources, including land use planning obligations (e.g., S106) agri-environment streams (such as ELMS) and any ad-hoc opportunities that may arise through partnership working. The increasing emphasis on nature-based solutions may also bring in new revenue streams to support strategic projects, given that many NBS will require a landscape scale / ‘ecosystem’ approach. The costings for the delivery of the GI and biodiversity aspects of the Local Plan could be included in the IDP so that the investment required to bring about delivery is clear and transparent from an early stage and factored into development proposals. Given the significant scale of the work required, consideration should also be given to how the land will be secured to deliver the GI initiatives, whether through direct purchase, lease or management agreements. A long-term approach to the management and maintenance of GI (ideally in perpetuity) also needs to be factored in from an early stage.

Alongside its value for natural capital and placemaking, green infrastructure provides alternative natural greenspaces that can help alleviate and buffer recreational pressures on protected sites. We welcome the recognition of the recreational pressure impacts across Greater Cambridge, and

1 1 Catchment Based Approach (October 2021) Chalk Stream Restoration Strategy: Main Report. See: New strategy launched to protect chalk streams - GOV.UK (www.gov.uk)

the Strategic Initiatives aimed at addressing these (e.g., the Coton corridor and multifunctional GI corridors, Strategic Initiatives 7-8). We support the development of clear policy requirements to address these significant pressures (as suggested in the Topic Paper).

Given the Local Plan’s strong emphasis on GI and the widespread benefits that it can achieve, we feel there is clear value in having a recognised GI standard in place. A standard would help to guide and inform GI planning and delivery and provide a consistent benchmark on quality across different scales/locations of development. It would also support the recommendation in the report for a GI-led design approach to new development. A standard could be supported by other documents, e.g., Local Design Guides, to ensure that nature is fully built into design through the provision of high-quality green infrastructure. Natural England is currently developing a Green Infrastructure Framework to set standards for green space and access to natural greenspaces, as well as a Design Guide and mapping data2 to support this work. We would encourage the use of these resources to guide and inform development of strategic Green Infrastructure and policies for Greater Cambridge. The Framework of GI Standards and products are due for launch in summer/autumn 2022, with a pre-release of the beta mapping and the principles of good green infrastructure in December 20213.

Natural England fully supports the proposed inclusion of policies to improve tree canopy cover, enhance river corridors and protect and enhance open spaces. We advise that robust policy requirements should be included to secure delivery of enhancements through development to ensure the achievement of multi-functional benefits for climate change, biodiversity, water quality, access. As indicated in our comments at the Issues and Options stage tree planting needs to be targeted in appropriate locations and considered in the context of wider plans for nature recovery. Consideration should be given to ecological impacts and the opportunities to create alternative habitats that could deliver better enhancements for people and wildlife, and store carbon effectively. Where woodland habitat creation is appropriate, consideration should be given to natural regeneration, and ‘rewilding’ for the economic and ecological benefits this can achieve.
Any tree planting should use native and local provenance tree species suitable for the location. Natural England advocates an approach which seeks to increase biodiversity and green infrastructure generally, not simply planting of trees, and protecting / enhancing soils, particularly peat soils.

For further advice and guidance on green infrastructure please refer to our comments at the Issues and Options consultation stage.

Wellbeing and inclusion
Natural England is fully supportive of the proposed policies including WS/HD: Creating healthy new developments. Our advice is that the policy should include strong links to the importance of adequate level and quality of accessible green infrastructure for people’s physical and mental health and wellbeing.

Great places
Natural England supports the proposed Great Places policies. We welcome the establishment of a Place and Design Quality Panel to conduct a site typologies study to understand, protect, utilise and enhance the valued characteristics of different areas in the plan, with the intention of using this information to raise design standards to ensure development reflects and enhances Cambridge’s distinctive landscape and townscape character.

We support Policy GP/LC Protection and enhancement of landscape character. Natural England is pleased to see that the Greater Cambridge landscape character assessments have been updated and will provide an up-to-date evidence base for the development of policy GP/LC. Existing retained policies form the South Cambridgeshire Local Plan NH/1, NH/2 and NH/13 and policy 8 of the Cambridge Local Plan should be reviewed and updated in the light of these updated landscape

2 See the GI Framework Mapping Portal: https://designatedsites.naturalengland.org.uk/GreenInfrastructure/Home.aspx 3 How Natural England’s Green Infrastructure Framework can help create better places to live - Natural England (blog.gov.uk)

character assessments to ensure they reflect the most recent baseline evidence.

Policy GP/LC seeks to identify, protect and enhance locally valued landscapes. Any locally designated landscapes, e.g., Areas of Greater Landscape Value, should be identified within the plan and given appropriate policy protection to protect and enhance them and to ensure that development reflects their distinctive character. It is not the role of Natural England to define locally valued landscapes – this is for LPAs and their communities. However, it should be noted that NE considers World Heritage Sites designated for their natural interest, local landscape designations and Inheritance Tax Exempt land to be locally valued. Therefore, these areas should be identified and included on policy maps showing locally designated landscapes along with any ‘Protected views’.

The Strategic Spatial Options Assessment appears to have considered a wide range of options based on up-to-date evidence on landscape and townscape character considerations. We support this approach which is useful in identifying and considering key landscape issues early in the Plan- making process, to feed into the Sustainability Appraisal. We note that the appraisal of the strategic spatial options is based on the interim draft findings of the emerging Landscape Character Assessment. We trust that the preliminary conclusions will be updated following completion of this work. The analysis also notes that recommendations are provided for strategic landscape mitigation and enhancement for each of the strategic spatial options. Natural England supports the proposal to identify specific mitigation as part of more detailed studies in locating and designing future development.

We are generally supportive of policies to protect and enhance the Cambridge Green Belt, achieve high quality development and establish high quality landscape and public realm.

Jobs
Natural England supports proposed policy J/AL: Protecting the best agricultural land. We welcome recognition of soil as a valuable resource and key element of the environmental ecosystem which requires protection, in accordance with paragraph 174 of the NPPF. We note that the protection of peat soils is addressed under the climate change theme discussed above.

Beyond the wider water resource / supply issue, discussed above, we have no substantive comments on the other proposed policies. However, policies will need to include appropriate requirements to ensure that all development avoids adverse impact to the natural environment and delivers net gains for biodiversity in accordance with the requirements of policy BG/BG: Biodiversity and geodiversity.

Homes
Beyond the wider water resource / supply issue we have no specific comments to make on these proposed policies subject to the inclusion of appropriate requirements to ensure that all development avoids adverse impact to the natural environment and delivers net gains for biodiversity in accordance with the requirements of policy BG/BG: Biodiversity and geodiversity. Residential development should also contribute towards delivery of the Strategic GI Initiatives.

Infrastructure
Natural England supports proposed policy I/ST: Sustainable transport and connectivity for the environmental and health benefits this could achieve including reduced emissions, air quality and climate change benefits.

We have no substantive comments on the other proposed policies subject to the inclusion of appropriate requirements to ensure that all development avoids adverse impact to the natural environment and delivers net gains for biodiversity in accordance with the requirements of policy BG/BG: Biodiversity and geodiversity.

Habitats Regulations Assessment (HRA)
Natural England supports preparation of the HRA Report by LUC (August 2021). We welcome that this incorporates a screening assessment and Appropriate Assessment. The Screening stage

identifies likely significant effects on European sites, either alone or in combination with other policies and proposals, for several plan policies. These include:
• Physical damage and loss (offsite) – in relation to Eversden and Wimpole Woods SAC.
• Non-physical disturbance (offsite) – in relation to Eversden and Wimpole Woods SAC.
• Recreation – in relation to Wicken Fen Ramsar SAC and Fenland SAC.
• Water Quantity and Quality – in relation to Ouse Washes SAC, SPA and Ramsar site, Wicken Fen Ramsar site, Chippenham Fen Ramsar site, Fenland SAC and Portholme SAC.
The Appropriate Assessment concludes no adverse effect on site integrity as follows: Eversden and Wimpole Woods SAC
Subject to the following safeguards and mitigation measures being implemented:
• Completion of bat surveys for site allocations identified with moderate or high potential to support barbastelle to determine the ecological value of these sites in relation to this bat species and to inform specific mitigation proposals.
• There is a commitment in the plan that proposed development will avoid key habitat features likely to be used by this species and to create and enhance suitable habitat for this species.
• It is also recommended that policy wording in the plan is strengthened to include specific inclusion of the safeguard measures detailed above and that Policy BG/BG Biodiversity and geodiversity is strengthened to include specific reference that mitigation provided should be suitable to the level of protection afforded to designated sites.

Wicken Fen Ramsar site and Fenland SAC
The Appropriate Assessment concludes no adverse effect on integrity as a result of increased recreational pressure provided that the following safeguards and mitigation measures are required by the plan and successfully implemented:
• A commitment in the plan to ensure that development within 20km of the Ramsar site and SAC to provide sufficient suitable alternative natural greenspace in line with advice from Natural England and that there should be specific detail on the policy on the appropriate quantity and quality of open spaces and how delivery and management in perpetuity will be secured.

The Appropriate Assessment is currently unable to conclude no adverse effect on the integrity of the Ouse Washes SAC, SPA and Ramsar, Wicken Fen Ramsar site, Chippenham Fen Ramsar site, Fenland SAC and Portholme SAC, with regard to water quantity and quality, pending the provision of further evidence through the Greater Cambridge IWMS and the WRE IWMP.

We welcome that the HRA has provided a detailed consideration of air quality impacts, associated with Plan development, for the relevant European sites. This is based on best practice Highways England Design Manual for Road and Bridges (DMRB) LA 105 Air quality guidance and considers the potential for traffic-related emissions on the affected road network based on traffic modelling data, in line with the advice provided by Natural England at the Issues and Options stage. Whilst the assessment has ruled out likely significant effects on all relevant European sites Natural England has been unable to carry out a detailed review of this information and will provide comments at the next stage of Plan consultation.

Please note that Natural England is reviewing the Impact Risk Zone (IRZ) for Eversden and Wimpole Woods SAC to take into account the findings of emerging SAC barbastelle tracking surveys being undertaken for major development schemes. It will also take into consideration the availability of suitable foraging resource which is considered to be quite scarce in the local area. In the meantime, until the IRZ is formally amended, and accompanying guidance prepared, we welcome application of a precautionary 20km buffer zone for SAC barbastelles in line with Natural England’s current local guidance.

Natural England is generally supportive of the interim findings of the HRA and will provide further

advice as the HRA is updated in line with the development of Plan policies and further evidence.

Sustainability Appraisal
Through the Sustainability Appraisal (LUC, October 2021) the preferred policy approaches for the Local Plan have been subject to appraisal against the SA objectives. A range of reasonable alternative options has also been assessed, including alternatives to the preferred policy approaches, Strategic Spatial Options and site options. We welcome that the findings of the HRA will be incorporated into the SA and will provide further insight into biodiversity impacts specifically at designated sites, presenting the opportunity to limit adverse impacts at these locations.

We support recognition of the over-abstraction of water in this region as a serious concern. We welcome acknowledgement that action is required now to ensure the availability of water for future uses without detrimental impact on the environment. Natural England agrees that water resource availability and water quality are inter-related and that these are likely to be exacerbated by the effects of climate change.

The new Local Plan presents the opportunity for new development to come forward at the most appropriate locations in order to avoid detrimental impacts on biodiversity assets. However, we support recognition of potential risks to the ecological network including statutorily designated sites, through degradation and other impacts associated with development.

We agree that the new Local Plan provides the opportunity to promote biodiversity gain and to improve the overall ecological network. Natural England also agrees that opportunities identified through the Green Infrastructure Study (2020) could support delivery of Natural England's Habitat Network nearby opportunity zones and support pollinator corridors. Robust plan policies will need to be developed to secure delivery of these enhancements through all relevant development.

The report concludes that overall, the proposed direction of the Local Plan performs well in sustainability terms with a strong focus on providing an appropriate amount of development and policies focused on minimising carbon emissions, particularly through minimising the need to travel, using land efficiently and making the most of existing and planned sustainable transport links. Natural England suggests this is a premature conclusion in the current absence of strategic water supply infrastructure and sustainable interim measures. Development through the adopted strategy is already being progress without these measures in place. Further development of the Green Infrastructure Initiatives is also required to ensure adequate GI to meet development needs and to alleviate recreational pressures on some of our most sensitive sites habitats. Robust plan policies, to secure timely delivery of this strategic green infrastructure, will be required to demonstrate the Plan’s sustainability.

We generally welcome the policy recommendations presented within Chapter 5 of the SA report including reference to the mitigation hierarchy within Policy BG/BG: Biodiversity and geodiversity and stronger commitments to protect and enhance biodiversity within this and the site allocation policies. However, in our view SA recommendations should focus on the urgent requirement for the identification of strategic and interim water resource/infrastructure solutions and further work to progress the GI Initiatives into real projects.

Natural England will provide further advice as the SA is updated in line with the development of Plan policies and further evidence.

We hope our comments are helpful. For any queries relating to the specific advice in this letter only please contact Janet Nuttall on […]. For any new consultations, or to provide further information on this consultation please send your correspondences to consultations@naturalengland.org.uk.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59998

Received: 08/12/2021

Respondent: Steeple Morden Parish Council

Representation Summary:

Future development and trends will increase the use of electricity so do we have an obligation to consider where we might generate this locally? There should be clear comments on how and where solar PV farms and windfarms are going to be planned.

Support for community led projects but should include access to funding.

Full text:

FORM RESPONSE

Vision and development strategy
Section / Policy Your comments
Vision and aims
How much development, and where – general comments Support the approach to contain any development to major clusters.
S/JH: New jobs and homes
S/DS: Development strategy Support to the extent that development should be very restricted in smaller rural villages with limited public transport.
S/SH: Settlement hierarchy Support Steeple Morden is a group village and should remain in this category. It is well down the sustainability hierarchy.
S/SB: Settlement boundaries Support tightly drawn development boundaries are important to reduce encroachment into the countryside and particularly for linear villages protecting their character. Also assists in delivering exception sites.

Cambridge urban area
Policy Your comments
Cambridge urban area - general comments
S/NEC: North East Cambridge
S/AMC: Areas of Major Change
S/OA: Opportunity Areas in Cambridge
S/LAC: Land allocations in Cambridge

Edge of Cambridge
Policy Your comments
Edge of Cambridge - general comments
S/CE: Cambridge East
S/NWC: North West Cambridge
S/CBC: Cambridge Biomedical Campus
S/WC: West Cambridge
S/EOC: Other existing allocations on the edge of Cambridge

New settlements
Policy Your comments
New settlements - general comments
S/CB: Cambourne
S/NS: Existing new settlements

Rural southern cluster
Policy Your comments
Rural southern cluster - general comments
S/GC: Genome Campus, Hinxton
S/BRC: Babraham Research Campus
S/RSC: Village allocations in the rural southern cluster
S/SCP: Policy areas in the rural southern cluster

Rest of the rural area
Policy Your comments
Rest of the rural area - general comments
S/RRA: Allocations in the rest of the rural area
S/RRP: Policy areas in the rest of the rural area

Climate change
Policy Your comments
Climate change - general comments Future development and trends will increase the use of electricity so do we have an obligation to consider where we might generate this locally? There should be clear comments on how and where solar PV farms and windfarms are going to be planned
CC/NZ: Net zero carbon new buildings Should not be specific about not connecting a gas pipe to new housing. This might prevent the future distribution of Hydrogen. Should keep this option open
CC/WE: Water efficiency in new developments Absolutely necessary.
CC/DC: Designing for a changing climate
CC/FM: Flooding and integrated water management Infrastructure should be operational before housing occupation. Especially managing hard surface run off.
CC/RE: Renewable energy projects and infrastructure Support for community led projects but should include access to funding.
CC/CE: Reducing waste and supporting the circular economy
CC/CS: Supporting land based carbon sequestration

Biodiversity and green spaces
Policy Your comments
Biodiversity and green spaces - general comments
BG/BG: Biodiversity and geodiversity Biodiversity Net Gain conditions should include developer funds for monitoring and remedialaction if required.
BG/GI: Green infrastructure Support for recognition of Pollinator corridors. Strategic Green Infrastructure should include protection and enhancement of chalk aquifer spring line.
BG/TC: Improving Tree canopy cover and the tree population Support particularly providing enhanced protection to existing mature trees.
BG/RC: River corridors Support Steeple Morden has an important tributary of the Cam flowing through the Parish – The Rhee. There should also be recognition enhancement and protection for the brooks which emanate from the aquifer spring line and help feed the river system.
BG/PO: Protecting open spaces Support
BG/EO: Providing and enhancing open spaces Support

Wellbeing and inclusion
Policy Your comments
Wellbeing and inclusion - general comments
WS/HD: Creating healthy new developments
WS/CF: Community, sports, and leisure facilities Support
WS/MU: Meanwhile uses during long term redevelopments
WS/IO: Creating inclusive employment and business opportunities through new developments
WS/HS: Pollution, health and safety Support

Great places policies
Policy Your comments
Great places – general comments
GP/PP: People and place responsive design Support
GP/LC: Protection and enhancement of landscape character Support. Need to ensure protection of landscape setting of villages and penetration of countryside gaps as an important element of character particularly those villages with a predominantly linear form.
GP/GB: Protection and enhancement of the Cambridge Green Belt
GP/QD: Achieving high quality development Support
GP/QP: Establishing high quality landscape and public realm Support
GP/HA: Conservation and enhancement of heritage assets Support Need to complete Conservation Area Assessments for villages
GP/CC: Adapting heritage assets to climate change
GP/PH8: Protection of Public Houses Support but condition included that if part of Pub is agreed for another use the marketing policy remains.

Jobs policies
Policy Your comments
Jobs – general comments
J/NE: New employment development proposals
J/RE: Supporting the rural Economy Support
J/AL: Protecting the best agricultural land Strongly support particularly in the light of grade I peat soil requiring remedial action and the need for increased food security.
J/PB: Protecting existing business space
J/RW: Enabling remote working Support
J/AW: Affordable workspace and creative industries
J/EP: Supporting a range of facilities in employment parks
J/RC: Retail and centres
J/VA: Visitor accommodation, attractions and facilities
J/FD: Faculty development and specialist / language schools

Homes policies
Policy Your comments
Homes – general comments
H/AH: Affordable housing
H/ES: Exception sites for affordable housing Support but all types of sites should retain local connection and permanence criteria
H/HM: Housing mix
H/HD: Housing density
H/GL: Garden land and subdivision of existing plots Support
H/SS: Residential space standards and accessible homes
H/SH: Specialist housing and homes for older people
H/CB: Self- and custom-build homes
H/BR: Build to rent homes
H/MO: Houses in multiple occupation (HMOs)
H/SA: Student accommodation
H/DC: Dwellings in the countryside Support but would stress the importance of ensuring that structures are sound.
H/RM: Residential moorings
H/RC: Residential caravans
H/GT: Gypsy and Traveller and Travelling Show People sites
H/CH: Community led housing Support and encouraged where there is no conflict with exception site policy.

Infrastructure policies
Policy Your comments
Infrastructure – general comments Agree there should be support for community led projects but should describe what form the support should take.

Infrastructure should be operational before occupation of new housing particularly the need to manage surface water runoff from hard surfaces to minimise the amount of sewage being released into the waterways
I/ST: Sustainable transport and connectivity Support but Improvements required to rural public transport and the last mile congestion into Cambridge City.
I/EV: Parking and electric vehicles Support for rural public charging points at community facilities
I/FD: Freight and delivery consolidation
I/SI: Safeguarding important infrastructure Support. Should also include disused railway lines with potential for future use.
I/AD: Aviation development Airfields are an important resource and difficult to replace. Local Plan should recognise the need for National Network of General Airfields.Government National Planning Policy Framework section 106.f, to ensure that planning decisions have regard to the importance of the national network of General Aviation airfields is clear. Environmental health concerns should be taken into account when deciding on housing location to avoid new occupants stress, disappointment and possible conflict.
I/EI: Energy infrastructure masterplanning
I/ID: Infrastructure and delivery Greater Cambridge is in a severely water stressed area and is causing environmental damage. Development should be curtailed until new water supply and sewage infrastructure is operational.
I/DI: Digital infrastructure Need for enhancement of mobile phone coverage in villages with poor reception by well sited and suitably camouflaged masts.

Supporting documents on which we are consulting
Policy Your comments
Sustainability Appraisal (incorporating the requirements of the Strategic Environmental Assessment)
Habitats Regulations Assessment

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 60042

Received: 13/12/2021

Respondent: Defence Infrastructure Organisation

Representation Summary:

Where development falls outside designated safeguarding zones the MOD may also have an
interest, particularly where the development is of a type likely to have an impact on operational capability.
Examples of this type of development are the installation of renewable energy generation systems and their
associated infrastructure. The MOD has, in principle, no issue or objection to renewable energy development
though some methods of renewable energy generation, for example wind turbine generators or solar photo
voltaic panels can, by virtue of their physical dimensions and properties, impact upon military aviation
activities, cause obstruction to protected critical airspace encompassing military aerodromes, and impede the
operation of safeguarded defence technical installations. Where turbines are erected in line of sight to
defence radars and other types of defence technical installations, the rotating motion of their blades can
degrade and cause interference to the effective operation of these types of installations with associated
impacts upon aviation safety and operational capability. Planning Practice Guidance published on the Gov.uk
website acknowledges the potential effect of wind turbine generators and directs developers and Local
Planning Authorities to consult the MOD where a proposed turbine has a tip height of or exceeding 11m or
has a rotor diameter of 2m or more.

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 60080

Received: 12/12/2021

Respondent: Guilden Morden Parish Council

Representation Summary:

Future development and trends will increase the use of electricity. Where might this be generated locally by solar and/or wind?

Support for community led projects but should include access to funding

Full text:

Firstly, the Form To Assist gives a comment column for Vision and Aims.
We have numerous comments to make under this heading but I have not been able to locate this on the online system.
Secondly, the online system asks "Did you raise the matter that is the subject of your representation with the LPA earlier in the process?"
Guilden Morden Parish Council have not been involved earlier in the process. I have therefore clicked "No" but the system will not allow me to proceed further.
The online system allows only 100 words for each comment and to summarise the comments to avoid exceeding 100 words. It would have been helpful if the Form To Assist had stated that.
Vision and development strategy
Section / Policy Your comments
Vision and aims 1.Guilden MordenParish Council has concerns that the increase in population resulting from the additional homes target of 44,000 will have a negative impact on an already struggling traffic, school and healthcare infrastructure.
Specifically on traffic and congestion:
Commuting into and out of Cambridge at peak times already attracts significant congestion and delay for commuters.
This not only effects commuting by car but also bus and the Park&Ride buses as these typically use the same roads as the other commuters and the bus lane network doesn’t extend to where it’s needed.
Links between the train stations and the city centre are also currently inadequate and equally effected by commuter congestion.
The guided busway is too infrequent to be a viable alternative and typically the Park& Ride parking is at capacity leaving commuters with little alternative other than to drive into the city centre.
All of the above describes the current situation which will clearly be significantly worsened by the addition of 44,000 homes by 2041.
2. Is the methodology used in arriving at the figure of 44,000 defendable?

How much development, and where – general comments Support that the proposed developments are to be in major clusters in areas with good public transport.
S/JH: New jobs and homes
S/DS: Development strategy Support to the extent that development should be very restricted in smaller rural villages with limited public transport.
S/SH: Settlement hierarchy Support. Guilden Morden is a group village and should remain in this category. It is well down the sustainability hierarchy.
S/SB: Settlement boundaries Support. Tightly drawn development boundaries are important to reduce encroachment into the countryside.

Cambridge urban area
Policy Your comments
Cambridge urban area - general comments
S/NEC: North East Cambridge
S/AMC: Areas of Major Change
S/OA: Opportunity Areas in Cambridge
S/LAC: Land allocations in Cambridge

Edge of Cambridge
Policy Your comments
Edge of Cambridge - general comments
S/CE: Cambridge East
S/NWC: North West Cambridge
S/CBC: Cambridge Biomedical Campus
S/WC: West Cambridge
S/EOC: Other existing allocations on the edge of Cambridge

New settlements
Policy Your comments
New settlements - general comments
S/CB: Cambourne
S/NS: Existing new settlements

Rural southern cluster
Policy Your comments
Rural southern cluster - general comments
S/GC: Genome Campus, Hinxton
S/BRC: Babraham Research Campus
S/RSC: Village allocations in the rural southern cluster
S/SCP: Policy areas in the rural southern cluster

Rest of the rural area
Policy Your comments
Rest of the rural area - general comments
S/RRA: Allocations in the rest of the rural area
S/RRP: Policy areas in the rest of the rural area

Climate change
Policy Your comments
Climate change - general comments Future development and trends will increase the use of electricity. Where might this be generated locally by solar and/or wind?
CC/NZ: Net zero carbon new buildings Support
CC/WE: Water efficiency in new developments Absolutely necessary
CC/DC: Designing for a changing climate
CC/FM: Flooding and integrated water management Infrastructure should be operational before housing occupation
CC/RE: Renewable energy projects and infrastructure Support for community led projects but should include access to funding
CC/CE: Reducing waste and supporting the circular economy
CC/CS: Supporting land based carbon sequestration

Biodiversity and green spaces
Policy Your comments
Biodiversity and green spaces - general comments
BG/BG: Biodiversity and geodiversity Biodiversity Net Gain conditions should include developer funds for monitoring and remedial action if required
BG/GI: Green infrastructure Support for recognition of pollinator corridors. Strategic Green Infrastructure should include protection and enhancement of chalk aquifer spring line.
BG/TC: Improving Tree canopy cover and the tree population Support
BG/RC: River corridors Support
BG/PO: Protecting open spaces Support
BG/EO: Providing and enhancing open spaces Support

Wellbeing and inclusion
Policy Your comments
Wellbeing and inclusion - general comments
WS/HD: Creating healthy new developments
WS/CF: Community, sports, and leisure facilities Support
WS/MU: Meanwhile uses during long term redevelopments
WS/IO: Creating inclusive employment and business opportunities through new developments
WS/HS: Pollution, health and safety

Great places policies
Policy Your comments
Great places – general comments
GP/PP: People and place responsive design Support
GP/LC: Protection and enhancement of landscape character Support. Need to ensure protection of landscape setting of villages and penetration of countryside gaps as an important element of character.
GP/GB: Protection and enhancement of the Cambridge Green Belt
GP/QD: Achieving high quality development Support
GP/QP: Establishing high quality landscape and public realm Support
GP/HA: Conservation and enhancement of heritage assets Support
GP/CC: Adapting heritage assets to climate change
GP/PH8: Protection of Public Houses Support

Jobs policies
Policy Your comments
Jobs – general comments
J/NE: New employment development proposals
J/RE: Supporting the rural Economy Support
J/AL: Protecting the best agricultural land Support
J/PB: Protecting existing business space
J/RW: Enabling remote working Support
J/AW: Affordable workspace and creative industries
J/EP: Supporting a range of facilities in employment parks
J/RC: Retail and centres
J/VA: Visitor accommodation, attractions and facilities
J/FD: Faculty development and specialist / language schools

Homes policies
Policy Your comments
Homes – general comments
H/AH: Affordable housing
H/ES: Exception sites for affordable housing Support but all types of sites should retain local connection and permanence criteria
H/HM: Housing mix
H/HD: Housing density
H/GL: Garden land and subdivision of existing plots Support
H/SS: Residential space standards and accessible homes
H/SH: Specialist housing and homes for older people
H/CB: Self- and custom-build homes
H/BR: Build to rent homes
H/MO: Houses in multiple occupation (HMOs)
H/SA: Student accommodation
H/DC: Dwellings in the countryside Support
H/RM: Residential moorings
H/RC: Residential caravans
H/GT: Gypsy and Traveller and Travelling Show People sites
H/CH: Community led housing Support

Infrastructure policies
Policy Your comments
Infrastructure – general comments Agree there should be support for community led projects but should describe what form the support should take.
Infrastructure should be operational before occupation of new housing particularly the need to manage surface water runoff fromhard surfacesto minimise the amount of sewage being released into the waterways
I/ST: Sustainable transport and connectivity Support but improvements required rural public transport and congestion into Cambridge (see comments under Vision and Aims)
I/EV: Parking and electric vehicles Support
I/FD: Freight and delivery consolidation
I/SI: Safeguarding important infrastructure Support
I/AD: Aviation development Support
I/EI: Energy infrastructure master planning
I/ID: Infrastructure and delivery Greater Cambridge is in a severely water stressed area and is causing environmental damage. Development should be curtailed until new water supply and sewage infrastructure is operational.
I/DI: Digital infrastructure Need for enhancement of mobile phone coverage in villages with poor reception by well sited and suitably camouflaged masts.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 60437

Received: 12/12/2021

Respondent: Great and Little Chishill Parish Council

Representation Summary:

A priority for all developments we need to keep ahead of new renewable technologies and review these yearly.

Full text:

This should be key to all development and this could go further in terms of sustainability
We endorse net zero carbon in new builds and this should be a priority.
We are concerned about the lack of water in South Cambridgeshire so water efficiency is a priority.
A priority for all developments. Further research needs to be undertaken to understand the future challenges we face.
A priority for all developments
A priority for all developments we need to keep ahead of new renewable technologies and review these yearly.
Key. (See document)
Key

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 60750

Received: 13/12/2021

Respondent: Cambridge and South Cambridgeshire Green Parties

Representation Summary:

Highly important policy area, given potential landscape impacts. We broadly support proposed policy direction and further detail as the plan progresses.

Full text:

We feel this is a highly important policy area, given the potential for landscape impacts. We broadly support the proposed policy direction and look forward to seeing further detail as the plan progresses.