Comment
Draft North East Cambridge Area Action Plan
Representation ID: 55918
Received: 05/10/2020
Respondent: Network Rail
Representation Summary:
Policy 17, Part g) promotes the construction of a new pedestrian and cycle bridge over the railway
to provide direct access to Chesterton Fen to the east of the railway line, and onwards to the
River Cam tow path.
GCSP will need to engage with Network Rail with regards to the proposed new pedestrian and cycle
bridge. This will enable Network Rail to advise on the railway industry review and approval
processes which would be associated to any proposed bridge scheme over railway infrastructure.