Support

Draft North East Cambridge Area Action Plan

Representation ID: 53282

Received: 02/10/2020

Respondent: Cambridgeshire and Peterborough Clinical Commissioning Group (CCG)

Representation Summary:

The recognition of the need to provide health care facilities in a phased and potentially temporary manner linked to the phasing of the development is welcomed. Design considerations should take into account that such provision is likely to be pre-fabricated and only on site for a limited period while permanent facilities are developed.

Full text:

The recognition of the need to provide health care facilities in a phased and potentially temporary manner linked to the phasing of the development is welcomed. Design considerations should take into account that such provision is likely to be pre-fabricated and only on site for a limited period while permanent facilities are developed.