Comment

North East Cambridge Area Action Plan Issues and Options 2019

Representation ID: 33788

Received: 25/03/2019

Respondent: Trinity College

Agent: Bidwells

Representation Summary:

As for Cambridge Science Park [CSP], it should more fully reflect the walking and cycling routes around the loop-road and through the central park. It should recognise the 'plaza' link from the CGB route to the south east of CSP; this will be a strategic pedestrian and cycle link into CSP that will be a high-quality public realm that will encourage more people to enter the park (on foot and cycle) through the plaza; this is part of the construction of the nearly completed CSP 22 and CSP 25 new buildings.

Full text:

Please see attached representation