Comment
North East Cambridge Area Action Plan Issues and Options 2019
Representation ID: 33784
Received: 20/02/2019
Respondent: Pam & Mal Schofield
There is far too much detail presented here and no overarching vision that takes us through to 2050. Please put one simple document forward for consultation that expresses eg:
How rail commuting along the Ely - Cambridge corridor will form part of the backbone of the new transportation network alongside CAM;
How North East Cambridge sets new standards for car free social/affordable housing schemes
Anticipating a step increase in cycling to work including and led by electric powered bikes
There is far too much detail presented here and no overarching vision that takes us through to 2050. Please put one simple document forward for consultation that expresses eg
1 Where the open space will be located -eg an extensive country park between Cambridge and Waterbeach
2 How rail commuting along the Ely - Cambridge corridor will form part of the backbone of the new transportation network alongside CAM
3 How North East Cambridge sets new standards for car free social/affordable housing schemes
4 Anticipating a step increase in cycling to work including and led by electric powered bikes