Comment
North East Cambridge Area Action Plan Issues and Options 2019
Representation ID: 32813
Received: 24/03/2019
Respondent: Dr Robert Norton-Wright
Representation Summary:
Yes, the assessment is largely correct. Especially the permeability issue is a potentially major barrier to encouraging walking and cycling. The guided busway / business park line is currently very limiting in this respect.
Full text:
Yes, the assessment is largely correct. Especially the permeability issue is a potentially major barrier to encouraging walking and cycling. The guided busway / business park line is currently very limiting in this respect.