Support
North East Cambridge Area Action Plan Issues and Options 2019
Representation ID: 32781
Received: 24/03/2019
Respondent: Matthew Danish
Representation Summary:
(1) A walking/cycling bridge alongside the A14 bridge to connect Horningsea and Cambridge. (2) Closure of the Fen Road level crossing and creation of multiple, safe, grade-separated walking/cycling routes across the railway.
Full text:
(1) A walking/cycling bridge alongside the A14 bridge to connect Horningsea and Cambridge. (2) Closure of the Fen Road level crossing and creation of multiple, safe, grade-separated walking/cycling routes across the railway.