Object
Land North of Cherry Hinton SPD
Representation ID: 31625
Received: 21/08/2017
Respondent: Peter Tribble
I argue that the movement strategy is incomplete, as it does not include rail. Consideration should be given to a railway station in Cherry
Hinton/Fulbourn
- near the Tesco Fulbourn site
- which has good road access
- could have a good cycle path along Gazelle Way
- is already a good bus interchange
- has space
- would reduce the need for road traffic to go to the main Cambridge
station
I argue that the movement strategy is incomplete, as it does not include rail. Consideration should be given to a railway station in Cherry
Hinton/Fulbourn
- near the Tesco Fulbourn site
- which has good road access
- could have a good cycle path along Gazelle Way
- is already a good bus interchange
- has space
- would reduce the need for road traffic to go to the main Cambridge
station