Comment

Cambridge Northern Fringe East AAP - Issues and Options

Representation ID: 29918

Received: 02/02/2015

Respondent: Cambridgeshire County Council

Representation Summary:

Proposed new local centre in Options 2-4 is supported in principle. It is noted that it is proposed that this includes a residential element and other elements which will be used by people, and in Option 2 the local centre appears to lie partially within the odour zone which is not suitable for such a use. The location of the local centre must have regard to development existing or proposed in the locality, so that potential amenity issues arising from proximity to the Water Recycling Centre, waste management uses, and railheads are avoided and / or can be satisfactorily mitigated.

Full text:

The proposed new local centre in Options 2-4 is supported in principle. However, it is noted that it is proposed that this include a residential element and other elements which will be used by people, and in Option 2 the local centre appears to lie partially within the odour zone which is not suitable for such a use. The location of the local centre must have regard to other development existing or proposed in the locality, so that potential amenity issues arising for example from proximity to the Water Recycling Centre, waste management uses, and the railheads are avoided and / or can be satisfactorily mitigated.