Comment

Greater Cambridge Statement of Community Involvement Draft Consultation 2023

Representation ID: 200028

Received: 17/11/2023

Respondent: Ms Annabel Sykes

Representation Summary:

A priority not mentioned in paragraph 3.1 is secondary and tertiary healthcare. There is no link between adequate hospital provision and the Local Plan. Infrastructure referred to in paragraph 3.4 ought to include hospitals, but does not.
The Local Development Scheme update is overdue (paragraph 3.9).
As well as the local Nature Partnership (paragraph 3.28), GCSP should consider engaging (where appropriate and relevant) with Hobson's Conduit Trust, the Cam Valley Forum and other interest groups for particular chalk streams (eg the Wilbraham River Protection Society, referred to in Cambridge Water's draft Water Resources Management Plan 2024 Statement of Response).

Full text:

A priority not mentioned in paragraph 3.1 is secondary and tertiary healthcare. There is no link between adequate hospital provision and the Local Plan. Infrastructure referred to in paragraph 3.4 ought to include hospitals, but does not.
The Local Development Scheme update is overdue (paragraph 3.9).
As well as the local Nature Partnership (paragraph 3.28), GCSP should consider engaging (where appropriate and relevant) with Hobson's Conduit Trust, the Cam Valley Forum and other interest groups for particular chalk streams (eg the Wilbraham River Protection Society, referred to in Cambridge Water's draft Water Resources Management Plan 2024 Statement of Response).