New searchLand east of Ermine Street South, Papworth Everard
56
No uploaded files for public display
Agricultural land
N/A
None
Greenfield
Residential development with ancillary retail use.
Market and affordable housing; rural travel hub connecting Papworth Everard to Cambourne and beyond; off-road cycle path connecting to Cambourne; community facilities; extensive green infrastructure incl. sports pitches, allotments, areas of play.
1,500 residential units Employment uses and floorspaces to be confirmed.
No answer given
No uploaded files for public display
Current means of vehicular access is to the west of the site along Ermine Street South. See attached Site Features and Constraints Plan for the location of existing vehicular access. An improvement to the existing vehicular access could be provided as part of development of the site. Please refer to Vision Document (February 2020) https://rapleys.sharefile.com/d-s37827bb5c114917a.
The site has a slight southwards sloping topography. Please refer to Vision Document (February 2020) https://rapleys.sharefile.com/d-s37827bb5c114917a.
Please refer to Vision Document (February 2020) https://rapleys.sharefile.com/d-s37827bb5c114917a.
No answer given
The site is adjacent to an existing settlement and therefore has access to utilities infrastructure. Two pylons traverse the north part of the site in an east-west direction. See attached Site Features and Constraints Plan for the location of pylons. The presence of pylons on the site could allow for a buffer area of public open space between the employment area to the north and land to be developed to the south. Please refer to Vision Document (February 2020) https://rapleys.sharefile.com/d-s37827bb5c114917a.
Site is under option by a developer. Site is controlled by Mactaggart and Mickel Homes (homebuilder and land promoter) under a promotion agreement.
The site is adjacent to a popular settlement and is within a strong housing market area. The site is easily accessible from two strategic roads (the A14 and A428), both of which are currently subject to major improvement schemes.
None.
N/A
2023 (based on adoption of Greater Cambridge Local Plan)
Approx 2027
4-5 years
N/A