New searchFarmland
N/A
None applicable
Greenfield
Residential development of up to 185 units and potential for any community facilities required to support development.
Much needed market and affordable homes and any community facility required to support development. We understand that there is a problem in the village of no car park being available for the church which causes issues on Church Street. We will investigate the potential to provide a car park for the church. We are also happy to look at the potential for providing public footpaths on the site.
Approximately 185 dwellings
No uploaded files for public display
There is access from Hauxton Road which will require improvement
Site has level topography suitable for residential development
Small area of Flood Zone 2 - no development will take place in small area of Flood Zone 2.
Site adjoins the built-up boundary it is therefore anticipated that the site has good connections to existing infrastructure. A water main crosses the site and will be integrated into the scheme's designs.
The site is vacant and available
The site is under option to a developer who is committed to developing the site without delay.
No known constraints.
N/A
Assuming the site secures an allocation in the emerging Greater Cambridge Local Plan following adoption in 2023, an application could be progressed immediately and could start to deliver in 2024/25
2028/29
3
No known constraints to development
Little Shelford, land north of Newton Road
1.776
No uploaded files for public display
Farmland
N/A
None applicable
Greenfield
Residential development of circa 40 units
Much needed market and affordable homes
Approximately 40 dwellings
No uploaded files for public display
There is access from Newton Road
Site has level topography suitable for residential development
No known constraints
Site adjoins the built-up area boundary it is therefore anticipated that the site has good connections to existing infrastructure. Following searches there does not appear to be any key utilities which cross the site.
The site is vacant and available
The site is under option by a developer who is committed to developing the site without delay.
No known constraints
N/A
Assuming the site secures an allocation in the emerging Greater Cambridge Local Plan following adoption in 2023 an application could be progressed immediately and could start to deliver 2024/25.
2026/27
1
No known constraints to development