Results for Bidwells search
New searchAgricultural Land / Building
No answer given
No answer given
Greenfield
Development of 750 - 850 residential dwellings
BNG
750 - 850 residential units
Within the Cambridge Green Belt
No uploaded files for public display
No answer given
No answer given
Within Cambridge Green Belt
The site has access to key utilities.
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
Commercial and B2 industrial use.
No answer given
No answer given
Previously developed land.
Proposing up to 6,160 square metres of general and light industrial, storage and distribution, and specialist employment floor space.
No answer given
Proposing between 5500 to 6,160 square metres of light and general industrial, storage and distribution, and specialist employment floor space.
The site lies outside the development framework boundary. Proposing vegetation to west, north-west, and south-west of site to retain rural character. Scope for a landmark element of agricultural character to stand against skyline (in place of existing silo). The roofs to the proposed buildings would not be substantially taller than existing buildings and would vary in height. Low density to the western part of the site. Gaps retained between buildings.
Existing access into the site from Dry Drayton Road to the south-east.
The site is mostly surrounded by agricultural land, though this is also a patch of woodland to the immediate south. The site is contained within the countryside.
The vehicular access lies within Flood Zone 3. The site is located outside the development framework.
The site has access to key utilities.
The site does not contain, or lie adjacent to, key infrastructure (e.g., pipelines, pylons, electricity sub-stations).
The site will be available for development in the next 0 to 5 years.
The site would be well received in the market given the general lack of supply but even more so in this particular size bracket. The supply dynamics are such that it forces occupiers to consider locations outside the city and they are seeing the benefits of being located along major road networks such as the A14. Previous case studies suggest that units within this size range can be transacted swiftly keeping good Cambridge companies and jobs in the region.
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
Commercial and Industrial
No answer given
No answer given
previously developed land
Non-residential - employment space
No answer given
employment between 6093 and 9290 square metres
No answer given
No uploaded files for public display
No answer given
No answer given
No answer given
Yes
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
Agricultural Land / Building
Part of the land is currently part of a farmyard in Litlington, the rest is greenfield.
No answer given
Greenfield
Residential Development of 70 - 100 residential units
No answer given
70 - 100 residential units
No answer given
No uploaded files for public display
No answer given
No answer given
Flood zone 1 Adjacent to Conservation Area and Listed Buildings
The Site has access to key utilities
No answer given
No answer given
No answer given
No answer given
No answer given
Paddock/scrub.
No answer given
No answer given
Greenfield land.
Proposing up to 34 market and affordable homes.
No answer given
Proposing up to 34 residential units.
The site lies outside the development framework boundary.
No uploaded files for public display
No answer given
No answer given
The site is not affected by flood risk.
The site has access to key utilities.
The site does not contain, or lie adjacent to, key infrastructure (e.g., pipelines, pylons, electricity sub-stations).
The site will be available for development in the next 0 to 5 years.
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No uploaded files for public display
Land west of High Street, Trumpington, Cambridge CB2 9LP
0.63 ha
Paddock / Scrub
No answer given
No answer given
Greenfield
50-80 residential dwellings
No answer given
50-80 residential dwellings
No answer given
No uploaded files for public display
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No uploaded files for public display
Agricultural Land / Building
No answer given
No answer given
Greenfield
Non-residential: 83,0000sqm General industrial, Storage and distribution uses, Office or research and development space and Specialist or other types of employment space floorspace
Mixed-use - General industrial uses; storage and distribution uses; office or research and development space; specialist or other types of employment space.
83,0000sqm employment floorspace
No answer given
No uploaded files for public display
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
Agricultural Land / Building
No answer given
No answer given
Greenfield
2,500-3,000 residential dwellings
No answer given
2,500-3,000 residential dwellings
No answer given
No uploaded files for public display
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
Land at Bury Farm, Haverhill Road, Stapleford, CB22 5BP
35.05 ha
Agricultural Land / Building
No answer given
No answer given
Greenfield and previously developed land
Residential: 1,080 - 2,000 residential dwellings
No answer given
1,080 - 2,000 residential dwellings
No answer given
No uploaded files for public display
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No uploaded files for public display