North East Cambridge Area Action Plan Issues and Options 2019

Search representations

Results for U+I Group PLC search

New search New search

Comment

North East Cambridge Area Action Plan Issues and Options 2019

Question 30: Should we look at innovative solutions to high volume cycle storage both within private development as well as in public areas?

Representation ID: 33632

Received: 25/03/2019

Respondent: U+I Group PLC

Agent: Carter Jonas

Representation Summary:

Cycling is key to achieving a mode split and demand must be met, and therefore we support the suggestion of innovative solutions to cycle parking. As part of further capacity testing, Masterplanning and detailed design, consideration will be given to innovative storage solutions (using domestic and international examples) that enables cycle parking to be integrated appropriately into the public realm. The concept of micromobility should also be embraced, with provision made for parking dockless bikes to ensure that they are not left in inconsiderate locations such as the footway.

Comment

North East Cambridge Area Action Plan Issues and Options 2019

Question 31: What additional factors should we also be considering to encourage cycling use (e.g. requiring new office buildings to include secure cycle parking, shower facilities and lockers)?

Representation ID: 33633

Received: 25/03/2019

Respondent: U+I Group PLC

Agent: Carter Jonas

Representation Summary:

New office buildings should include covered, secure cycle storage, showers and lockers. The cycle parking should also be conveniently located at basement/ground floor level or within easy access of lifts capable of transferring bikes between levels. Where possible segregated access for cyclists should be provided to minimise the conflict with pedestrians and vehicles accessing buildings.

Comment

North East Cambridge Area Action Plan Issues and Options 2019

Question 32: How do we design and plan for a place that makes the best use of current technologies and is also future proofed to respond to changing technologies over time?

Representation ID: 33634

Received: 25/03/2019

Respondent: U+I Group PLC

Agent: Carter Jonas

Representation Summary:

There are a range of options that encompass energy strategies, form and fabric, building services and energy generation and supply. Please see attached statement for full details.

Comment

North East Cambridge Area Action Plan Issues and Options 2019

Question 33: what sort of innovative measures could be used to improve links between the Cambridge North Station and destinations like the Science Park?

Representation ID: 33635

Received: 25/03/2019

Respondent: U+I Group PLC

Agent: Carter Jonas

Representation Summary:

It is considered unlikely that an at grade crossing can be located to link the Science Park with the station due to capacity constraints on Milton Road. A well-designed overpass for pedestrians and cyclists may provide the best option to effectively reduce severance caused by Milton Road and link the station with the Science Park. The journey from the station to the Science Park, will be the last / first mile of commuter journey and micromobility solutions such as dockless e-bikes should be provided to support the movement on this link.

Comment

North East Cambridge Area Action Plan Issues and Options 2019

Question 34: Are there specific types of employment spaces that we should seek to support in this area?

Representation ID: 33636

Received: 25/03/2019

Respondent: U+I Group PLC

Agent: Carter Jonas

Representation Summary:

The knowledge-based cluster around Cambridge Science Park, St John's Innovation Park, and Cambridge Business Park is internationally recognised, and the significant economic role that it offers to NEC must be fully harnessed to encourage complementary industries (Artificial Intelligence, R+D and laboratories for smaller emerging businesses that need the cluster benefits, maker-space etc) and optimise further employment opportunities. We would therefore expect a range (in terms of use and size) of employment spaces across NEC, including Science, Research & Development and Technology-related employment. However, in advocating innovation throughout NEC, policy limitations should not be imposed that unduly restrict any particular use at this stage.

Support

North East Cambridge Area Action Plan Issues and Options 2019

Question 35: In particular, should the plan require delivery of:

Representation ID: 33637

Received: 25/03/2019

Respondent: U+I Group PLC

Agent: Carter Jonas

Representation Summary:

We generally support all of the suggested options at this stage, and would seek inclusion of corporate headquarters within category A. These options should equally be applied to proposals for meanwhile/worthwhile uses, in order to optimise economic development benefits and promote innovation at the earlier stages of the development process for NEC.

Comment

North East Cambridge Area Action Plan Issues and Options 2019

Question 36: Which of the following approaches should the AAP take to existing industrial uses in the North East Cambridge area?

Representation ID: 33638

Received: 25/03/2019

Respondent: U+I Group PLC

Agent: Carter Jonas

Representation Summary:

Comments on option A&B:

This is dependent on Housing Infrastructure Funding that will facilitate the relocation of the Water Treatment Works. Capacity testing and Masterplanning will need to carefully identify what uses (and how much) will be appropriate. A greater understanding of industrial need is required.

Consideration should be given to whether existing businesses are compatible with residential neighbourhoods, as if so, there may be scope to incorporate industrial (i.e. b1c) accommodation within a mixed use development. For existing businesses where there is not a demonstrable need to be in Cambridge, relocation options outside the NEC should be considered.

Comment

North East Cambridge Area Action Plan Issues and Options 2019

Question 37: Are there particular uses that should be retained in the area or moved elsewhere?

Representation ID: 33639

Received: 25/03/2019

Respondent: U+I Group PLC

Agent: Carter Jonas

Representation Summary:

See response to question 36. The AAP should set out the strategy for determining the needs of individual businesses (and whether there is an operational imperative to be closely related to Cambridge, and how the relocation of existing industrial uses can be appropriately implemented.

Comment

North East Cambridge Area Action Plan Issues and Options 2019

Question 38: Should the AAP require a mix of dwelling sizes and in particular, some family sized housing?

Representation ID: 33640

Received: 25/03/2019

Respondent: U+I Group PLC

Agent: Carter Jonas

Representation Summary:

For the high density levels of new housing envisaged, innovation will be essential at all stages and in all forms. Traditional approaches to housing in Cambridge are unlikely to be appropriate. Housing will be made available for a much wider market than might otherwise be expected for a new settlement/strategic urban extension elsewhere in the county (e.g. Northstowe, Waterbeach, Cambourne), including that which is more aligned to smaller household sizes e.g. students, single persons and those downsizing. Family housing will require 'smarter-space' solutions to reflect the Site-wide high density approach.

A greater understanding of need and demand, market trends and viability will be needed to define housing requirements for NEC in later stages of the AAP process.

Support

North East Cambridge Area Action Plan Issues and Options 2019

Question 39: Should the AAP seek provision for housing for essential local workers and/or specific housing provided by employers (i.e. tethered accommodation outside of any affordable housing contribu

Representation ID: 33641

Received: 25/03/2019

Respondent: U+I Group PLC

Agent: Carter Jonas

Representation Summary:

Yes, see response to Question 38.