North East Cambridge Area Action Plan Issues and Options 2019

Question 80: Should there be any limit on the scale of a proposed 'meanwhile use'?

Representation ID: 33682

Received: 25/03/2019

Respondent: U+I Group PLC

Agent: Carter Jonas

Representation Summary:

It seems unnecessary to impose a limitation on the scale of a proposed 'meanwhile use', as the purpose of a meanwhile use is, fundamentally, to make optimum use of a site that will otherwise be under-utilised for many years. This can have many short-term economic and social benefits. A policy limitation may stifle innovation and creativity. It is considered likely that many of the meanwhile use proposals will require formal planning consent, which will provide the Local Planning Authority with the ability to control and enforce development that is deemed inappropriate.

Object

North East Cambridge Area Action Plan Issues and Options 2019

Question 81: Do you think it appropriate to set a maximum period for how long a 'meanwhile use' could be in operation?

Representation ID: 33683

Received: 25/03/2019

Respondent: U+I Group PLC

Agent: Carter Jonas

Representation Summary:

No. A minimum period should be based on the need and timetable for the permanent development. For the most successful meanwhile initiatives a reasonable period of operation is required in order to recoup the initial capital investment.

Object

North East Cambridge Area Action Plan Issues and Options 2019

Question 82: Should the AAP also include a requirement for 'meanwhile uses' to demonstrate how they will add vibrancy and interest and/or deliver on the wider development outcomes and vision for the N

Representation ID: 33684

Received: 25/03/2019

Respondent: U+I Group PLC

Agent: Carter Jonas

Representation Summary:

No. 'Meanwhile' uses are temporary in nature and an approach that seeks to make efficient use of land, in a compatible manner with surrounding uses, should be encouraged.

Comment

North East Cambridge Area Action Plan Issues and Options 2019

Question 83: What negative or positive impacts might the proposed plans have on residents or visitors to Cambridge with low incomes or who have particular characteristics protected under the Equality

Representation ID: 33685

Received: 25/03/2019

Respondent: U+I Group PLC

Agent: Carter Jonas

Representation Summary:

Due to proximity of two highly deprived wards in Cambridgeshire, regeneration on the scale envisaged will create significant socio-economic opportunities for a wider catchment beyond the AAP boundary. And we support the intention Health Needs and Impact Assessment, to better understand the challenges and issues faced in neighbouring wards, so as to link into opportunities that will arise in NEC.

Comment

North East Cambridge Area Action Plan Issues and Options 2019

Question 84: Do you have any other comments about the North East Cambridge area and/or AAP? Are there other issues and alternatives that the councils should consider? If you wish to make suggestions,

Representation ID: 33686

Received: 25/03/2019

Respondent: U+I Group PLC

Agent: Carter Jonas

Representation Summary:

We would encourage a specific section on education and health provision within the NEC, noting the likelihood that if on-site provision is required, it may require different formats/approaches on how such provision is made i.e. traditional forms of provision in Cambridgeshire are unlikely to be suitable in a high density urban regeneration scheme of this nature.
If off-site provision is considered to be more appropriate, comment should be given on how and where need is expected to be accommodated (for instance it may be more appropriate to extend existing or proposed schools in Cambridge, to create additional Forms of Entry, rather than have a lower number of Forms of Entry on-site that falls below the recommended minimum sizes).

Comment

North East Cambridge Area Action Plan Issues and Options 2019

Question 66: Are there additional issues we should consider in developing the approach to deliver an exemplar development?

Representation ID: 33848

Received: 25/03/2019

Respondent: U+I Group PLC

Agent: Carter Jonas

Representation Summary:

This response was submitted under question 32 and full details can be found there. However this response is also relevant to Question 66:

There are a range of options that encompass energy strategies, form and fabric, building services and energy generation and supply. Please see attached statement for full details.