North East Cambridge Area Action Plan Issues and Options 2019

Search representations

Results for Iansyst Ltd & Fen House Property Ltd search

New search New search

Support

North East Cambridge Area Action Plan Issues and Options 2019

Question 72: Do you agree with an approach of devising a Section 106 regime specifically for the North East Cambridge area? If not, what alternative approach should we consider?

Representation ID: 33336

Received: 25/03/2019

Respondent: Iansyst Ltd & Fen House Property Ltd

Representation Summary:

Yes, the Section 106 Regime should be specifically used, along with a contribution from Network Rail, to support the enhanced roadbridge with the cycle and pedestrian bridge proposed to access recreational facilities in the green belt on Fen Road and the Cam.

Comment

North East Cambridge Area Action Plan Issues and Options 2019

Question 50: Should the area provide for other forms of specialist housing, either on-site or through seeking contributions for off-site provision?

Representation ID: 33337

Received: 25/03/2019

Respondent: Iansyst Ltd & Fen House Property Ltd

Representation Summary:

Whether or not East of the Railway line is formally included in the NECAAP EotR's needs must be heeded. It needs mains sewage.

Comment

North East Cambridge Area Action Plan Issues and Options 2019

Question 24: Within the North East Cambridge area green space can be provided in a number of forms including the following options. Which of the following would you support?

Representation ID: 33339

Received: 25/03/2019

Respondent: Iansyst Ltd & Fen House Property Ltd

Representation Summary:

Acess to the Cam must also consider the needs of those living and working east of the railway line.

Comment

North East Cambridge Area Action Plan Issues and Options 2019

Question 2: Is the proposed boundary the most appropriate one for the AAP?

Representation ID: 33395

Received: 25/03/2019

Respondent: Iansyst Ltd & Fen House Property Ltd

Representation Summary:

The Area East of the railway is seriously impacted by the AAP and should be included so that its needs are properly taken into account.

Support

North East Cambridge Area Action Plan Issues and Options 2019

Question 17: Should we explore delivery of a cycling and pedestrian bridge over the railway line to link into the River Cam towpath?

Representation ID: 33396

Received: 25/03/2019

Respondent: Iansyst Ltd & Fen House Property Ltd

Representation Summary:

The proposed cycle and pedestrian bridge towards the Cam must be considered with the needs of those living East of the Railway line, not in isolation.

Comment

North East Cambridge Area Action Plan Issues and Options 2019

Question 83: What negative or positive impacts might the proposed plans have on residents or visitors to Cambridge with low incomes or who have particular characteristics protected under the Equality

Representation ID: 33397

Received: 25/03/2019

Respondent: Iansyst Ltd & Fen House Property Ltd

Representation Summary:

Whether or not East of the Railway line is formally included in the NECAAP EotR's needs must be heeded, including those of EQ Act protected travellers

For instructions on how to use the system and make comments, please see our help guide.