North East Cambridge Area Action Plan Issues and Options 2019

Search representations

Results for Cambridgeshire County Council search

New search New search

Support

North East Cambridge Area Action Plan Issues and Options 2019

Question 2: Is the proposed boundary the most appropriate one for the AAP?

Representation ID: 33033

Received: 25/03/2019

Respondent: Cambridgeshire County Council

Representation Summary:

The proposal to include both the Cambridge Northern Fringe East (CNFE) and Cambridge Science Park is welcomed. The highway network in the vicinity of both sites already operates at capacity at peak times of the day and in order for the intensification of either or both sites to be acceptable in transport terms, the way in which people travel to, from and within the sites will need to be significantly different in the future. it is essential that key pieces of infrastructure are used to their maximum potential and the area considered holistically. The proposed boundary is therefore supported.

Support

North East Cambridge Area Action Plan Issues and Options 2019

Question 6: Do you agree with the overarching Objectives? If not, what might you change?

Representation ID: 33034

Received: 25/03/2019

Respondent: Cambridgeshire County Council

Representation Summary:

The objectives for the North East Cambridge area to continue to meet the strategic needs of the city, and explicitly by enabling the continued use of the mineral railheads is supported. It should be recognised that this will have implications for the uses which can be located near to the railheads, and only development which will not be prejudicial to the ongoing operation of the railheads should be located in the associated Transport Safeguarding Area designed by the adopted Cambridgeshire and Peterborough Minerals and Waste Plan (see also the response to Question 7).

Comment

North East Cambridge Area Action Plan Issues and Options 2019

Question 7: Do you support the overall approach shown in the Indicative Concept Plan? Do you have any comments or suggestions to make?

Representation ID: 33036

Received: 25/03/2019

Respondent: Cambridgeshire County Council

Representation Summary:

It is noted that a considerable area of land which has 'Opportunity for Residential and Mixed Use' (shown on Figure 5.1: Concept Plan) is adjoining the aggregate railheads and which falls within the railheads designated Transport Safeguarding Area. Residential development (including hotel development) immediately adjacent to the railheads would not be appropriate, as this could prove to be prejudicial to the operation of the railheads. The Concept Plan should therefore be revised to remove residential use from the immediate proximity of the railheads.

Support

North East Cambridge Area Action Plan Issues and Options 2019

Question 8: Do you agree that outside of the existing business areas, the eastern part of the North East Cambridge AAP area (i.e. the area east of Milton Road) should provide a higher density mixed us

Representation ID: 33039

Received: 25/03/2019

Respondent: Cambridgeshire County Council

Representation Summary:

The Ely to Cambridge Transport Study recommended that in order to redevelop and intensify the use of this important area of brownfield land, a more varied development mix would be needed which included residential as well as employment land uses as well as other ancillary land uses such as education, retail and leisure.

Comment

North East Cambridge Area Action Plan Issues and Options 2019

Question 9: Should Nuffield Road Industrial Estate be redeveloped for residential mixed use development?

Representation ID: 33040

Received: 25/03/2019

Respondent: Cambridgeshire County Council

Representation Summary:

The County Council is working closely with SCDC and the City Council to provide further transport evidence to support the development of the AAP. One of its key elements is the development of a highway trip budget which will help to understand what transport impact a range of development mixes and levels in the area might have on the surrounding highway network. This work hasn't yet concluded therefore it is considered premature to give too much commentary on development types and mixes at this time.

Comment

North East Cambridge Area Action Plan Issues and Options 2019

Question 10: Do you agree that opportunities should be explored to intensify and diversify existing business areas? If so, with what sort of uses?

Representation ID: 33041

Received: 25/03/2019

Respondent: Cambridgeshire County Council

Representation Summary:

The County Council is working closely with SCDC and the City Council to provide further transport evidence to support the development of the AAP. One of its key elements is the development of a highway trip budget which will help to understand what transport impact a range of development mixes and levels in the area might have on the surrounding highway network. This work hasn't yet concluded therefore it is considered premature to give too much commentary on development types and mixes at this time.

Comment

North East Cambridge Area Action Plan Issues and Options 2019

Question 11: Are there any particular land uses that should be accommodated in the North East Cambridge area?

Representation ID: 33042

Received: 25/03/2019

Respondent: Cambridgeshire County Council

Representation Summary:

As you are aware, the Transport Strategy and Funding team at the County Council is working closely with SCDC and the City Council to provide further transport evidence to support the development of the AAP. This work hasn't yet concluded therefore it is considered premature to give too much commentary around development types and mixes at this time.

Support

North East Cambridge Area Action Plan Issues and Options 2019

Question 13: Should the AAP require developments in the North East Cambridge AAP area to apply Healthy Towns principles?

Representation ID: 33043

Received: 25/03/2019

Respondent: Cambridgeshire County Council

Representation Summary:

The County Council supports the AAP requiring developments in the North East Cambridge area to apply Healthy Town principles.

The principles of Healthy Towns are compatible with the types of travel modes that this area will need to develop for it to be acceptable in transport terms. A higher proportion of daily trips will need to be made on foot or by bike, with the health benefits that these modes can realise.

Consideration needs to be given to the suitable location of schools to avoid high levels of car pollution and other local environmental considerations that impact on health.

Comment

North East Cambridge Area Action Plan Issues and Options 2019

Question 16: Should the AAP include any or a combination of the options below to improve pedestrian and cycling connectivity through the site and to the surrounding area?

Representation ID: 33044

Received: 25/03/2019

Respondent: Cambridgeshire County Council

Representation Summary:

Pedestrian and cycling connectivity both within and external to the AAP area will be critical to the success of this development and will be one of the determinants to what level of development can be accommodated. We are pleased to be working with colleagues at SCDC and the City Council to help provide further transport evidence to support the AAP and we will be considering all of these possibilities in the very near future. Therefore, at this stage no options should be ruled out and indeed we may wish to see further connections included as the work continues.

Comment

North East Cambridge Area Action Plan Issues and Options 2019

Question 17: Should we explore delivery of a cycling and pedestrian bridge over the railway line to link into the River Cam towpath?

Representation ID: 33045

Received: 25/03/2019

Respondent: Cambridgeshire County Council

Representation Summary:

As already mentioned, we are pleased to be working with colleagues at SCDC and the City Council to help provide further transport evidence to support the AAP and we will be considering a range of possibilities in the very near future. Future plans for the rail network need to be better understood to inform the suitability of alternative provision for crossing the railway line. Therefore, at this stage no options should be ruled out and indeed we may wish to see further connections included as the work continues.

For instructions on how to use the system and make comments, please see our help guide.