Comment
North East Cambridge Area Action Plan Issues and Options 2019
Representation ID: 33045
Received: 25/03/2019
Respondent: Cambridgeshire County Council
As already mentioned, we are pleased to be working with colleagues at SCDC and the City Council to help provide further transport evidence to support the AAP and we will be considering a range of possibilities in the very near future. Future plans for the rail network need to be better understood to inform the suitability of alternative provision for crossing the railway line. Therefore, at this stage no options should be ruled out and indeed we may wish to see further connections included as the work continues.
As already mentioned, we are pleased to be working with colleagues at SCDC and the City Council to help provide further transport evidence to support the AAP and we will be considering a range of possibilities in the very near future. Future plans for the rail network need to be better understood to inform the suitability of alternative provision for crossing the railway line. Therefore, at this stage no options should be ruled out and indeed we may wish to see further connections included as the work continues.