Cambridge Northern Fringe East AAP - Issues and Options

Search representations

Results for Cambridgeshire County Council search

New search New search

Comment

Cambridge Northern Fringe East AAP - Issues and Options

Question 30e

Representation ID: 29915

Received: 02/02/2015

Respondent: Cambridgeshire County Council

Representation Summary:

If housing (of any type) is to be provided it should be in a location where amenity issues from the Water Recycling Centre, aggregate railheads and existing and planned waste uses will not arise and / or can be satisfactorily mitigated.

Comment

Cambridge Northern Fringe East AAP - Issues and Options

Question 31

Representation ID: 29917

Received: 02/02/2015

Respondent: Cambridgeshire County Council

Representation Summary:

The proposed approach to the delivery of supporting services is supported in principle. The location of facilities must have regard to other development in the locality, so potential amenity issues arising from proximity to the Water Recycling Centre, waste management uses, and the railheads are avoided and / or can be satisfactorily mitigated.

Supportive of this policy, especially regarding co-location of services for community, retail and leisure uses.

The proposal on services and facilities are supported. Community facilities should be provided early in the development of the residential component of the development. Services and facilities should include community development.

Comment

Cambridge Northern Fringe East AAP - Issues and Options

Question 32

Representation ID: 29918

Received: 02/02/2015

Respondent: Cambridgeshire County Council

Representation Summary:

Proposed new local centre in Options 2-4 is supported in principle. It is noted that it is proposed that this includes a residential element and other elements which will be used by people, and in Option 2 the local centre appears to lie partially within the odour zone which is not suitable for such a use. The location of the local centre must have regard to development existing or proposed in the locality, so that potential amenity issues arising from proximity to the Water Recycling Centre, waste management uses, and railheads are avoided and / or can be satisfactorily mitigated.

Comment

Cambridge Northern Fringe East AAP - Issues and Options

Question 33

Representation ID: 29920

Received: 02/02/2015

Respondent: Cambridgeshire County Council

Representation Summary:

The approach to the provision of open space is supported in principle. Regard needs to be paid to amenity issues which may arise from other uses in the CNFE area, such as the Water Recycling Centre, waste management uses and railheads which could give rise to dust, noise and odour. Open space needs to be located in a position where such matters will not arise and / or can be satisfactorily mitigated

The policy to require open space is supported

Access to open space is a key wider determinant of health.

Comment

Cambridge Northern Fringe East AAP - Issues and Options

Question 34

Representation ID: 29921

Received: 02/02/2015

Respondent: Cambridgeshire County Council

Representation Summary:


All options will require more detailed transport assessment work to understand the transport implications, across all modes, of the proposals including their inter-relationship with emerging proposals under development by the County Council as part of the City Deal programme. Although this is true of all options, this is particularly the case for those that propose higher levels of development which might require significant transport intervention to ensure that transport impacts are not severe. This applies to both the local networks (walk, cycle, bus, and highway) and also the strategic road (i.e.: Highways Agency) and rail (i.e.: Network Rail) networks.

Comment

Cambridge Northern Fringe East AAP - Issues and Options

Question 35a

Representation ID: 29922

Received: 02/02/2015

Respondent: Cambridgeshire County Council

Representation Summary:

All options will require more detailed transport assessment work to understand the transport implications, across all modes, of the proposals including their inter-relationship with emerging proposals under development by the County Council as part of the City Deal programme. Although this is true of all options, this is particularly the case for those that propose higher levels of development which might require significant transport intervention to ensure that transport impacts are not severe. This applies to both the local networks (walk, cycle, bus, and highway) and also the strategic road (i.e.: Highways Agency) and rail (i.e.: Network Rail) networks.

Comment

Cambridge Northern Fringe East AAP - Issues and Options

Question 35b

Representation ID: 29923

Received: 02/02/2015

Respondent: Cambridgeshire County Council

Representation Summary:

All options will require more detailed transport assessment work to understand the transport implications, across all modes, of the proposals including their inter-relationship with emerging proposals under development by the County Council as part of the City Deal programme. Although this is true of all options, this is particularly the case for those that propose higher levels of development which might require significant transport intervention to ensure that transport impacts are not severe. This applies to both the local networks (walk, cycle, bus, and highway) and also the strategic road (i.e.: Highways Agency) and rail (i.e.: Network Rail) networks.

Comment

Cambridge Northern Fringe East AAP - Issues and Options

Question 35c

Representation ID: 29924

Received: 02/02/2015

Respondent: Cambridgeshire County Council

Representation Summary:

All options will require more detailed transport assessment work to understand the transport implications, across all modes, of the proposals including their inter-relationship with emerging proposals under development by the County Council as part of the City Deal programme. Although this is true of all options, this is particularly the case for those that propose higher levels of development which might require significant transport intervention to ensure that transport impacts are not severe. This applies to both the local networks (walk, cycle, bus, and highway) and also the strategic road (i.e.: Highways Agency) and rail (i.e.: Network Rail) networks.

Comment

Cambridge Northern Fringe East AAP - Issues and Options

Question 35d

Representation ID: 29925

Received: 02/02/2015

Respondent: Cambridgeshire County Council

Representation Summary:

All options will require more detailed transport assessment work to understand the transport implications, across all modes, of the proposals including their inter-relationship with emerging proposals under development by the County Council as part of the City Deal programme. Although this is true of all options, this is particularly the case for those that propose higher levels of development which might require significant transport intervention to ensure that transport impacts are not severe. This applies to both the local networks (walk, cycle, bus, and highway) and also the strategic road (i.e.: Highways Agency) and rail (i.e.: Network Rail) networks.

Object

Cambridge Northern Fringe East AAP - Issues and Options

Question 36a

Representation ID: 29927

Received: 02/02/2015

Respondent: Cambridgeshire County Council

Representation Summary:

There will be an increasing number of users and a wide variety of modes of transport using this area, ranging from pedestrian and cyclists going to the offices and the station, to HCVs. The redevelopment of the area provides an opportunity to improve conditions. This includes improved separation between HCVs and other users, given the significant levels of demand likely to be generated by the AAP proposals, but also to minimise the impact of such traffic on other land uses through minimisation of noise and vibration of vehicles.