Hill full representations are set out within the attached document named: "GCLP Reg 19 Consultation Representations - Cambridge East". Specifically please see Section 5: Infrastructure and Viability for relevant comments regarding Policy I/ID.
Infrastructure and Delivery
Draft Policy I/ID (Infrastructure and Delivery) confirms that planning permission will only be granted for proposals that have made suitable arrangements for the improvement or provision of physical and social infrastructure necessary to make the scheme acceptable in planning terms. This requirement is supported by the Infrastructure Delivery Plan (IDP) which identifies a list of infrastructure requirements that GCSP has deemed necessary to support the growth strategy.
For Cambridge East, a specific itemised list is included at Appendix A of the Infrastructure Delivery Plan and it assumes delivery of 3,950 homes and 21,750sqm of commercial floorspace within the plan period (i.e. 2024-2045). Delivery of development at Cambridge East is scheduled to extend beyond the plan period, and consequently there are details to be established through a planning application in relation to phasing and timing of infrastructure to ensure the development is appropriately serviced and any impacts of the development mitigated.
Hill reserves the right to demonstrate and evidence the appropriate package of infrastructure requirements for the development, having regard to the requirements of the IDP, once there is greater clarity on the scope of the application.
In the meantime, Hill have more detailed comments on the specific requirements listed in Appendix A of the Infrastructure Delivery Schedule for Cambridge East.
Notwithstanding the above, the IDP fails to identify several key pieces of transport infrastructure that are considered to be relevant to the delivery of Cambridge East:
Newmarket Road Travel Hub: The Greater Cambridge Partnership (GCP) is proposing to relocate the existing Newmarket Road Park & Ride to a new Newmarket Road Travel Hub site near the Newmarket Road and Airport Way junction. The current Park & Ride is on leased land within the Marleigh development and is safeguarded for future development, so GCP is progressing a replacement site off Airport Way. The new travel hub would form part of the movement network serving the development at Cambridge East, materially strengthening the site’s wider connectivity. GCP has been preparing an application which it is proposing to submit later in 2026. The Travel Hub has been progressed as part of the Cambridge Eastern Access programme and the GCP budget indicates funding of £58.5m is agreed to deliver this2.
Eastern Access Phase A: Phase A, proposed by the GCP, is not dependent on the relocation of airport activities but would see Newmarket Road improved for public transport, walking and cycling alongside enhanced landscaping and environmental schemes. Whilst not dependent on the airport being redeveloped, Phase A will have significant benefits for Cambridge East by delivering infrastructure that will enable a positive modal shift for both the existing and any new community. The Phase A Business Case has been approved and detailed scheme designs have been prepared by the GCP. Phase A is funded with the current GCP budgets.
Fulbourn Greenway: This has not yet been delivered, but forms an important component of the wider active travel network within which Cambridge East will sit. The scheme is being promoted and funded separately through the GCP Greenways project and is therefore not an item that Cambridge East is required to deliver directly. However, it remains a strategically important corridor that will provide enhanced walking, wheeling and cycling connections between Cambridge East, Fulbourn and destinations further south and east. Whilst the Greenway has not yet been delivered, it should be identified within the list of related transport schemes to ensure that the masterplanning and delivery of Cambridge East facilitates appropriate connections to it, thereby maximising sustainable travel opportunities and strengthening the site's integration with the wider active travel network.
Comments on the social infrastructure requirements are as follows:
Education: 3,950 homes in the allocation does not in itself justify the delivery of an 8FE secondary school. The IDP and Local Plan policies must make explicit that education delivery should always be proportionate to need from the development and that, should a school be required in excess of the needs of the Cambridge East site, funding for both land and capital cost will be pooled from other developments and/or Basic Needs funding. The IDP Appendix A for Cambridge East should make it explicit whether sixth form is intended to be included or excluded from both the land-take and capital contribution.
New healthcare facility: £15m is a very high cost for a health centre of the likely scale required here – all contributions will be based on a realistic and proportionate cost planning exercise at the time of agreeing the S106.
Community Centres and Libraries: Budgets for library and community floorspace should be seen as indicative until an appropriate site-specific strategy is agreed, relevant to the needs of the community at the time.
Sports Hall: The option should be retained for the sports hall provision to be met by an appropriately designed collocated facility at the secondary school and therefore have negligible net additional cost.
Swimming Pool: The swimming pool requirement in the IDP should take account of the representations made for Policy S/CE regarding the specific size dimensions of the pool which should be determined based on up-to-date evidence at the time the application is submitted. Any swimming pool meeting wider regional needs will require contributions from other developments where this facility is addressing those needs.
Outdoor Sports: The sports provision should be made flexible to respond to more diverse outdoor sport, recreation and activity needs at the time of delivery, including sport for women and girls.
Hill request that the IDP Appendix A Infrastructure Delivery Schedule for Cambridge East is reconsidered on the basis of the comments identified above.
Viability
Hill have reviewed the Council's viability evidence and consider that a number of the assumptions underpinning the assessment require further scrutiny before the conclusions can be relied upon.
While the viability appraisal provides a high-level assessment of plan-wide viability, it does not fully reflect the specific circumstances, costs and infrastructure requirements associated with the delivery of Cambridge East. The evidence should therefore not be treated as a definitive assessment of the viability implications of the allocation or the policy requirements proposed within the Plan.
In particular, there is insufficient evidence that the full cost of strategic transport infrastructure required to support Cambridge East has been tested through the viability appraisal.
The assessment states that "the cost of mitigation measures (e.g. highways improvements, travel plans, bus contributions) is assumed to be included in the CIL rate and the site-specific s106 contributions." (page 23). However, the current CIL charging schedule was established to address infrastructure requirements associated with the adopted Local Plans (which doesnt not include an allocation for Cambridge East) and the assessment does not reflect the transport interventions necessary to support the scale of growth proposed through the emerging Greater Cambridge Local Plan. Equally, the extent of site-specific transport mitigation required to support Cambridge East has not yet been fully determined, which will be established through ongoing masterplanning, transport modelling and infrastructure planning work. The full cost implications of these requirements are not yet known and hence have not been reflected in the viability assessment.
This is acknowledged in the Council’s appraisal which states "at this point our appraisals do not incorporate any infrastructure costs over and above standard development costs" and that "site specific constraints may affect costs on a case-by-case basis” (page 24). Cambridge East is a complex strategic allocation with a range of site-specific costs, including relocation and vacant possession costs associated with existing airport operations, together with transport infrastructure requirements that remain subject to further assessment. By its own admission, the viability appraisal has not incorporated these costs. As a result, the assessment does not provide a complete picture of the cost assumptions associated with the delivery of Cambridge East.
There is also a risk that the infrastructure assumptions underpinning the viability evidence do not fully reflect the long-term delivery trajectory of Cambridge East. The Infrastructure Delivery Plan principally considers infrastructure required to support development within the plan period, whereas Cambridge East will continue to be delivered significantly beyond that timeframe. Consequently, the appraisal has not assessed the full extent of infrastructure requirements that may arise over the lifetime of the development, particularly where strategic transport interventions are linked to later phases of growth.
Hill will continue to undertake detailed masterplanning and technical work to better understand the precise costs associated with the development, which will provide a more detailed picture than presented in the evidence that supports the Local Plan. If necessary, in accordance with the requirements of Policy DM5 of the NPPF (2026), this will support a financial viability assessment that may be submitted along the future planning application for the site.
Community Infrastructure Levy
5.15 The draft policy states that financial contributions via the Community Infrastructure Levy will be required where this is operable at the point of the application. In relation to Cambridge East, Quod submitted representations on behalf of Marshalls to the Draft Charging Schedule consultation which took place in February and March 2026 (Appendix 5). These representations highlight that the proposed CIL appears to have been calculated to help meet a gap in infrastructure funding relevant to the 2018 local plans. Those local plans do not assume or plan for the development of the Cambridge East site – they in fact prevent its development until after those local plans have been reviewed. Hill intends to submit a Hearing Statement ahead of the CIL examination which builds upon Marshall’s earlier representations.
Through those representations, it is therefore proposed that the Charging Schedule should not apply to the development of the land and amendments have been sought to ensure the status of the Charging Schedule and its relationship to future growth is clarified.
Hill have commenced a masterplanning exercise to determine the type and scale of development that planning permission will be sought for, but this is currently at an early stage. In the meantime, the draft site allocation in the emerging GCLP (Policy S/CE) indicates that the site’s development will need to be supported by a range of infrastructure albeit the scale of development and the range of infrastructure has not yet been masterplanned or assessed.
For example, the Regulation 19 draft GCLP sets high expectations for the site’s sustainable development, including in relation to transport. In particular, draft Policy S/CE provides that the site’s development must:
“Ensure an exemplar approach to movement and transport within and through the site, transforming the wider connectivity of the eastern edge of Cambridge and promoting a low car living approach where ‘walking and wheeling’ are the first choice for most residents, workers and visitors from the outset.”
It is apparent from the draft Policy that a deliberate site-specific solution is required in order to ensure that this and other critical objectives for the site are achieved. The draft site allocation provides:
“To support delivery of the agreed masterplan, a strategic and local transport mitigation plan must be prepared by the developer for agreement with the Local Highways Authority and Local Planning Authority. This must include:
a. Active and public transport measures;
b. Vehicular transport measures, including site access arrangements;
c. A comprehensive parking strategy aligned with low-car living objectives;
d. Infrastructure costing and delivery phasing, demonstrating how the necessary transport measures identified above will be delivered at a time that enables optimal transport outcomes and remains within the agreed trip budget; and
e. Mechanisms for delivery, monitoring and review including potential delivery through Section 106 obligations, or CIL or other appropriate funding mechanisms.”
No discussions have yet taken place about how any site-specific funding and delivery mechanism will work but it is clear that it must be tailored to the requirements of the site, rather than a generalised city-wide CIL.
Similarly, draft Policy S/CE requires the site’s development to contain internal travel networks which connect Cambridge East to other key destinations through:
“iii. A package of bus service enhancements, or other public transport modes where appropriate, connecting the site with North East Cambridge, West Cambridge, Cambridge City Centre, Cambridge railway station and the Cambridge Biomedical Campus;
iv. A high-quality public transport scheme, linking the high-quality public transport route within the site to the city centre; and
v. Active travel enhancements to wider connections linking with key destinations including Cambridge railway station, City Centre and onwards to West Cambridge and wider destinations on radial high quality public transport corridors (HQPT); Cambridge Regional College, North East Cambridge and Cambridge North Station; Cambridge Biomedical Campus, Cambridge South Station and Cambridge Leisure site.”
To help achieve this, a wider Greater Cambridge Transport Study (“GCTS”) is being prepared to underpin the GCLP. However, that GCTS is not yet developed, tested or costed by the authorities and no funding mechanism has been drafted to enable its delivery.
These issues will be worked up through the finalisation of the GCLP and the submission of a planning application. There is no reference to them in the documents supporting or justifying the current draft CIL. It would be inappropriate to apply a CIL which is based on delivering the 2018 Local Plans to development and infrastructure which is being planned and costed in the emerging GCLP, which will need to devise its own delivery and funding mechanism if it is to be found sound. Any CIL or other funding mechanism relevant to Cambridge East, therefore, needs to be planned and tested alongside the policies of the GCLP, not the 2018 plans.
As a strategic site and a cornerstone of the emerging GCLP, the Cambridge East site is very different from other sites that may be allocated in the plan. In particular, the emerging draft allocation Policy S/CE identifies that Cambridge East will have its own unique infrastructure requirements – and that sufficient confidence in the provision of that infrastructure side by side with the development of the site will be necessary.
The timely provision of bespoke infrastructure would be jeopardised if Cambridge East is simply another site contributing to pooled infrastructure funding. In order to demonstrate and achieve its deliverability, a bespoke outcome will be necessary.
Exclusion from general CIL would not be unusual for strategic sites of the scale of Cambridge East (or often smaller). For strategic sites and infrastructure, the PPG references the need for a charging authority to “take development costs into account when setting its levy rate or rates, particularly those likely to be incurred on strategic sites or brownfield land. A realistic understanding of costs is essential to the proper assessment of viability in an area.” (paragraph 021).
In relation to strategic sites, it further provides:
“Can authorities set different rates for strategic sites?
“Charging authorities may want to consider how zonal rates can ensure that the levy compliments plan policies for strategic sites. This may include setting specific rates for strategic sites that reflect the land value uplift their development creates. Low or zero rates may be appropriate where plan policies require significant contributions towards housing or infrastructure through planning obligations and this is evidenced by an assessment of viability". Paragraph: 026 Reference ID: 25-026-20190901
The Guidance reflects the fact that the application of a generalised CIL becomes an added complication for a strategic site. The Council will seek to secure the delivery of site-specific infrastructure through planning conditions and obligations. A generalised CIL adds cost without ensuring delivery, compared with the direct link that would be achieved between securing the requirement through planning obligations.
The addition of a generalised CIL also risks undermining delivery by double taxing strategic sites (with CIL and a full s.106 package). The recently published Planning Obligations SPD (adopted by the Councils in 2026) makes little reference to CIL and gives no comfort in this regard. Planning obligations are the most effective route to securing infrastructure when it is required alongside the delivery of new homes.
Therefore, Hill seek, either through amendments to this policy, the Cambridge East policy, through amendments to the draft CIL Charging Schedule or a statement of common ground, that the Cambridge East is nil rated for CIL and the bespoke package of infrastructure required to support the development is determined through up to date evidence submitted with the planning application. If at the time an application is advanced the current draft CIL Charging Schedule linked to the 2018 Local Plan is adopted and an update to the Charging Schedule based on the GCLP is not in place, as per Policy H013 of the NPPF, Hill will wish to work with the local planning authority to develop a 'consenting framework’ to reflect the strategic nature of the site and potential change in circumstances for infrastructure delivery.