Greater Cambridge Local Plan: Proposed Submission

Search representations

Results for Vistry Strategic Land search

New search New search

Object

Greater Cambridge Local Plan: Proposed Submission

Policy S/RRA/CR: Land to the west of Cambridge Road, Melbourn

Representation ID: 213200

Received: 24/09/2026

Respondent: Vistry Strategic Land

Agent: Bidwells

Legally compliant? Yes

Sound? No

Representation Summary:

Vistry supports the allocation of the site for around 125 dwellings but objects to elements of Policy
S/RRA/CR that lack clarity. It considers the requirement for a “masterplan-led approach” ambiguous and
potentially onerous for a site of this scale, seeking confirmation that a concept plan submitted at
application stage would suffice. Vistry also requests clearer wording on active travel connections,
specifying pedestrian and cycle links rather than the broader term “active travel”. Subject to these minor
amendments, Vistry supports the site’s allocation and its contribution to housing delivery in Melbourn.

Object

Greater Cambridge Local Plan: Proposed Submission

Policy CC/SD: Sustainable development and the climate emergency

Representation ID: 213202

Received: 24/09/2026

Respondent: Vistry Strategic Land

Agent: Bidwells

Legally compliant? Yes

Sound? No

Representation Summary:

We object to Policy CC/SD, as its rigid sustainability statement criteria exceed national policy
requirements and threaten scheme viability. We request flexibility by adding 'where appropriate' to
Sustainability Assessment criteria, recognizing that requirements must be bespoke to scheme scale.
Specifically, we challenge the net zero operational carbon requirement in point 2(b) as unsupported by
Building Regulations or NPPF (2026). Additionally, we note point 2(f) lacks definitions on 'nature-based
solutions' and raises serious concerns that the Council's Local Plan Viability Appraisal fails to model the
substantial build costs imposed by criteria 2(a)–(i), rendering the policy unsound.

Object

Greater Cambridge Local Plan: Proposed Submission

Policy CC/NZ: Net zero carbon new buildings

Representation ID: 213204

Received: 24/09/2026

Respondent: Vistry Strategic Land

Agent: Bidwells

Legally compliant? Yes

Sound? No

Representation Summary:

Parts Parts A and B impose energy performance standards that significantly exceed national
requirements, including Passivhaus and LETI Net Zero benchmarks. These targets risk imposing
onerous costs and technical constraints on development, particularly for volume housebuilders. The
requirement for CIBSE TM54 modelling duplicates existing energy assessments undertaken through
BREEAM. The policy lacks robust evidence demonstrating that these standards are deliverable, viable,
and will not adversely affect housing supply. In light of PM13 of the NPPF (2026), any standards
exceeding national requirements should be fully justified. The policy should be revised to align with
national standards and a proportionate, evidence-based approach.

Object

Greater Cambridge Local Plan: Proposed Submission

Policy CC/IW: Integrated water management, sustainable drainage and water quality

Representation ID: 213206

Received: 24/09/2026

Respondent: Vistry Strategic Land

Agent: Bidwells

Legally compliant? Yes

Sound? No

Representation Summary:

Policy CC/IW contains several requirements that are overly prescriptive, insufficiently justified, and risk
undermining development viability and deliverability. Requirements for zero discharge from rainfall
events up to 5mm, mandatory permeable hard surfacing, and green or brown roofs on all flat roofs
exceed established guidance and fail to account for site-specific constraints. Criterion 6(a) places responsibility on developers to demonstrate wastewater capacity, despite this being a statutory function
of the water company. These requirements risk increasing costs, delaying development, and threatening
housing delivery. The policy should be amended to provide greater flexibility and align with national
policy and statutory responsibilities.

Object

Greater Cambridge Local Plan: Proposed Submission

Policy CC/CE: Supporting a circular economy and sustainable resource use

Representation ID: 213207

Received: 24/09/2026

Respondent: Vistry Strategic Land

Agent: Bidwells

Legally compliant? Yes

Sound? No

Representation Summary:

The policy contains several requirements that are insufficiently justified, inconsistent with national policy,
and risk placing unnecessary burdens on development. The requirement to reduce embodied carbon
lacks clear parameters, creating uncertainty over implementation and viability. Requiring full justification
of demolition conflicts with permitted development provisions and places excessive weight on carbon
considerations beyond NPPF requirements. Embodied carbon should be considered alongside other
material planning considerations, instead of as a determining factor. Mandatory submission of Circular
Economy Statements for larger residential schemes is onerous and exceeds national information
requirements. CC/CE should therefore be amended to provide greater flexibility and consistency.

Object

Greater Cambridge Local Plan: Proposed Submission

Policy CC/CS: Supporting land-based carbon sequestration and carbon sinks

Representation ID: 213208

Received: 24/09/2026

Respondent: Vistry Strategic Land

Agent: Bidwells

Legally compliant? Yes

Sound? No

Representation Summary:

Part 7 mandates major developments to enhance carbon sequestration via green infrastructure or habitat creation. However, this requirement goes beyond national policies and seems excessive. Alongside existing green infrastructure and biodiversity policies, this measure appears unnecessary. Vistry suggest either removing the policy or revising it to focus on meaningful carbon sequestration through nature-based solutions as a material consideration in decision-making.

Object

Greater Cambridge Local Plan: Proposed Submission

Policy BG/BG: Biodiversity and geodiversity

Representation ID: 213209

Received: 24/09/2026

Respondent: Vistry Strategic Land

Agent: Bidwells

Legally compliant? Yes

Sound? No

Representation Summary:

The proposed requirement for 20% Biodiversity Net Gain (BNG) on major development is unsound as it
is not sufficiently justified, evidenced or demonstrated to be deliverable. The Environment Act 2021
establishes a clear statutory requirement for 10% BNG, and there is no compelling evidence within the
Plan evidence base to justify a blanket increase to 20%. Furthermore, it is unclear whether the viability
implications of a 20% requirement have been adequately assessed alongside other policy costs. The
policy should therefore be amended to require qualifying development to achieve the statutory minimum
10% BNG in accordance with national legislation.

Object

Greater Cambridge Local Plan: Proposed Submission

Policy BG/GI: Green infrastructure

Representation ID: 213211

Received: 24/09/2026

Respondent: Vistry Strategic Land

Agent: Bidwells

Legally compliant? Yes

Sound? No

Representation Summary:

Clarification is sought regarding the scope, content and purpose of the proposed Green Infrastructure
Plan and Statement, including whether these documents are intended to form part of, or sit alongside,
the Design and Access Statement. As drafted, the requirement lacks sufficient detail and it is unclear
what additional information would be provided beyond that already secured through a Design and
Access Statement. Furthermore, a Green Infrastructure Plan is not identified within the application
information requirements set out in Annex C of the NPPF (2026). Accordingly, the requirement is
unjustified and should be deleted from Point 2 of the policy.

Object

Greater Cambridge Local Plan: Proposed Submission

Policy BG/UGF: Urban greening factor

Representation ID: 213212

Received: 24/09/2026

Respondent: Vistry Strategic Land

Agent: Bidwells

Legally compliant? Yes

Sound? No

Representation Summary:

We object to Policy BG/UGF, advocating for its total deletion from the Local Plan. Achieving 10%
Biodiversity Net Gain under the Environment Act 2021 is already an effective, established measure for
securing ecological enhancements on development sites. Adding a mandatory Urban Greening Factor
target (e.g. 0.4 for residential developments) introduces an unnecessary, untested burden. There are
serious viability concerns, noting that the Local Plan Viability Assessment does not appear to evaluate
the cumulative cost impact of UGF alongside extensive sustainability policies, making the policy
unjustified and inconsistent with national policy.

Object

Greater Cambridge Local Plan: Proposed Submission

Policy BG/TC: Tree cover and the tree population

Representation ID: 213213

Received: 24/09/2026

Respondent: Vistry Strategic Land

Agent: Bidwells

Legally compliant? Yes

Sound? No

Representation Summary:

Specifically, we raise concern with point 6 as currently worded which requires that development “must
contribute” to the maintenance of planted trees and hedgerows. We consider that maintenance is already
secured where appropriate by Landscape Management and Maintenance Plans which can be secured
via condition where appropriate. This is often monitored and secured via a management company, with
no “contribution” required.
We suggest the following amended wording:
6.
Development which includes the planting of trees and/or hedgerows should
ensure their long-term maintenance, which will be secured via planning conditions
and/or obligations as appropriate.

For instructions on how to use the system and make comments, please see our help guide.