Policy S/JH: New jobs and homes
Respondent: Brookgate Land Limited & Network Rail Infrastructure Limited
Representation Summary:
Argues that Policy S/JH should treat its job growth figure as a minimum benchmark rather than a cap on economic growth. Evidence indicates a need for between 67,600 and 90,900 additional jobs, with stronger growth expectations than previous forecasts and credible higher-growth scenarios. It contends that Cambridge’s innovation-led economy, Government support through the Development Corporation, and the Mayor’s ambition to triple the regional economy by 2050 justify a more ambitious approach. The policy should therefore plan for higher employment and associated housing growth, with flexibility in employment land allocations, to support sustainable economic growth and avoid constraining Cambridge’s future potential.
Change suggested by respondent:
The Plan needs to be better aligned to the national emphasis for economic growth in Greater Cambridge and the ambitions of the Mayor. At the moment it fails to grasp the full economic opportunity nor plan for sufficient homes as a result.
Full text:
The proposed wording implies that the job figure included in Policy S/JH represents an objectively assessed need. However, this figure should be regarded as a minimum benchmark, not a maximum or constraining target.
Supporting evidence to the policy titled the ‘Greater Cambridge Employment and Housing Needs Update 2024-2045 (September 2025)[1], concludes at 3.55 that the various scenarios modelled indicate a need of between 67,600 and 90,900 additional jobs over the plan period. This compares to between 66,600 and 75,800 additional jobs modelled under the previous 2023 results. This significant increase in the upper end of the modelling indicates that economic growth expectations have strengthened exponentially, not diminished.
As set out in the Employment and Housing Needs Update, during the strongest phase of growth (2010–
2020), the Greater Cambridge economy expanded by almost 4,000 jobs per year. The evidence identifies a ‘Central growth’ scenario of 73,200 jobs across the plan period, representing sustained annual growth of
around 3,500 jobs.
The advancements are not just in the scientific arena. Life science research and application has seen a technological transformation over recent years. The majority (83%) of the life sciences community is now using some level of automation across their R&D processes (Bidwells & YouGov, 2023). This has innovated the drug development process and clinical trials, but is extending well beyond these areas. Cloud-connected medical devices, artificial intelligence, machine learning, and gene sequencing and editing are evolving rapidly and will deliver new products and transform processes.
This will present challenges to companies across the sector to keep pace with the evolution underway. Restricting employment growth to historical trends fails to embrace the advancement that technology brings. Over the life-time of a plan restricting employment floorspace in one of the most innovative clusters in the world fails to meet one of the Government’s key priorities of growing the economy.
Crucially, the Central growth scenario builds in assumptions of slower periods, contractions, and economic shocks, and is therefore inherently conservative rather than reflective of the full growth capacity of the Cambridge economy.
However recent Government announcements highlight the Government’s continued commitment to growth in Cambridge. Including the commitment to the Development Corporation. Further, the Mayor’s Local Growth Plan seeks to triple the Cambridgeshire and Peterborough Local Economy by 2050.
The Employment and Housing Needs Update acknowledges a ‘High’ and ‘High Sensitivity’ scenario, whereby growth would meet or exceed the 2010–2020 trajectory. This high level of growth is feasible in Cambridge and would support the Government’s direction of travel. It is therefore important to recognise that higher-growth outcomes remain credible and should not be ruled out by policy. This requires revision to the proposed policy wording.
For these reasons, the Local Plan should utilise a more optimistic and realistic figure for job numbers and include explicit support for higher-growth scenarios, with corresponding flexibility in employment land allocations. Without these changes, Policy S/JH risks being unsound and inconsistent with national policy objectives to support sustainable economic growth and productivity; it will also fail to support the economic priority placed on Cambridge through the Development Corporation, and the Mayor’s ambition to triple the economy by 2050.
Action Required
The Local Plan needs to base its strategic policies upon a high job growth and associated housing growth beyond the minimum position. This would better align it with the economic priorities of the government, Development Corporation and the Mayor.
Greater Cambridge Local Plan: Proposed Submission
Policy S/C/AMC: Cambridge Areas of Major Change
Respondent: Brookgate Land Limited & Network Rail Infrastructure Limited
Representation Summary:
The objection accepts the principle of coordinated development but considers the policy unsound because it imposes overly prescriptive and unjustified requirements for implementation plans, masterplans and phasing strategies. The policy fails to reflect differing site circumstances and stages of delivery, including advanced schemes such as Chesterton Rail Sidings. It may duplicate existing work, constrain incremental development, reduce flexibility and delay delivery. A more proportionate approach is proposed, requiring development not to prejudice comprehensive delivery, allowing appropriate levels of coordination, and focusing on timely infrastructure provision rather than mandatory implementation plans, masterplans and approved phasing strategies in all cases.
Change suggested by respondent:
Our concurrently submitted draft representation on PDF provides our tracked changes version of the policy which requires amendments.
Full text:
Whilst we do not object to the principle of an overarching policy guiding the Areas of Major Change, we object to the proposed wording of the policy as drafted as it is unsound and unjustified for the following reasons:
Part 2 of the policy states:
“2. Additionally, development will only be permitted:
a. where it is in accordance with a comprehensive implementation plan for the area which has demonstrable support from all key landowners, or it is supported by evidence to demonstrate that the comprehensive and successful delivery of the development can still take place without this being secured;
b. where the development is based on clearly articulated and justified objectives and approach through the provision of a site-wide masterplan, strategies and/or other over-arching coordination documents;
c. in instances where the infrastructure provision is to be phased, an approved phasing strategy is in place.”
Our concerns are:
• Parts A and B: Whilst the principle of coordinated development is recognised as is the importance of comprehensive planning in appropriate circumstances. The additional criteria set out in points a) and b) impose unnecessary and disproportionate requirements that risk undermining the deliverability, flexibility, and effectiveness of development. The policy does not acknowledge that different sites are at different stages; some yet to come forward through planning and some are already very advanced. For example, The promoters’ sites at Cambridge North East (known as ‘Chesterton Rail Sidings’, see Appendix 1) are well ahead of other parts of the wider and new ‘North East Cambridge Area of Major Change’.
• Part C: The blanket requirement for a site-wide masterplan and associated coordination documents is not proportionate in all circumstances. The policy fails to distinguish between large, complex, multi-landowner regeneration areas and sites where incremental or phased development is entirely appropriate. This approach risks over-prescription, reducing flexibility and responsiveness to market conditions and evolving delivery opportunities. The requirement for an approved phasing strategy wherever infrastructure provision is phased is unnecessarily restrictive. Requiring approval of a phasing strategy at an early stage may constrain otherwise viable schemes and introduce avoidable delay. The policy should instead focus on ensuring that infrastructure is delivered in a timely and coordinated manner, rather than mandating a specific mechanism.
The policy is considered unsound because it is far too prescriptive, insufficiently justified and is likely to undermine effective delivery of these key sites. It imposes blanket requirements for implementation plans, site-wide masterplans and phasing strategies without recognising differing site circumstances or stages of delivery.
This could duplicate work already undertaken for advanced or consented sites, such as Chesterton Rail Sidings, while unnecessarily constraining incremental development. The requirements may reduce flexibility, delay delivery and restrict the ability of schemes to respond to changing market conditions. A more proportionate approach should focus on securing coordinated development and timely infrastructure delivery, with requirements tailored to individual site circumstances.
We propose the following amended policy text:
”please see our attached representation with a copy of red text and strikethroughs"
This alternative approach retains the Council’s objective of coordinated development while ensuring that the policy remains flexible, proportionate, and deliverable. It avoids placing unreasonable obligations on individual landowners and better reflects the realities of development delivery in Cambridge and so better supports the timely and effective delivery of the Areas of Major Change.
Greater Cambridge Local Plan: Proposed Submission
Policy S/AMC/NEC: North East Cambridge Area of Major Change
Respondent: Brookgate Land Limited & Network Rail Infrastructure Limited
Representation Summary:
Accepts the need for a policy framework for North East Cambridge following the Government’s decision not to fund relocation of the Cambridge Waste Water Treatment Plant, but considers the proposed policy unsound and unjustified. It argues the policy is excessively long, complex and prescriptive, creating significant barriers to delivery and flexibility. Many provisions duplicate existing development management policies or impose unnecessary requirements such as comprehensive masterplanning and phasing strategies. The policy should be fundamentally redrafted to provide a concise, flexible framework focused on key development principles, recognising differing ownerships, site circumstances and the need to respond to changing market conditions.
Change suggested by respondent:
As set out in our response the policy need a complete overhaul to be sound.
Full text:
The Cambridge North East Policy approach has changed to take account of the government’s announcement, in August 2025, that it will not be funding the relocation of the Cambridge Waste Water Treatment Plant (CWWTP) through the Housing Infrastructure Fund (“HIF”).
The result is that it will be highly unlikely that the Area Action Plan could be implemented across the North East Cambridge Area over the Plan period, and therefore the previously proposed approach would be unsound and unjustified.
In their topic paper on site allocations , the Council acknowledge that there is still a significant potential to make better use of the available sites, in particular land within and around Cowley Road Industrial Estate, and as such a policy framework is still necessary to coordinate this development across sites in different ownerships, and to create a cohesive district.
We do not object to the premise of a policy framework to guide development and recognise the important role the wider policy area will have for the Cambridge and UK economy.
However, as drafted the approach is unsound and unjustified. The sheer scale of the policy with 29 limbs, several of which have sub-limbs adding further requirements to development. The result is a policy which is far too long, difficult to digest as to what it seeks to achieve or how each of the components should be applied to different forms of development, and how they interrelated and interface. It sets an impossibly high policy matrix for developers and landowners to navigate.
Further, the inertia of the policy’s predecessor, the NECAAP, should make the LPA well aware of the difficulties of co-ordinating so many different interests and the brake it imposes on creativity and deliverability at crucial stages in the economic cycle. This also flows into the aspirations of the above Policy S/C/AMC.
Such a policy, across such a large and varied area, should just identify the opportunity and provide a light touch overview of requirements and expectations of the allocation.
It is our view that the policy should be fundamentally rewritten entirely to make it succinct and usable, guided by the indicative spatial framework (figure 38 in the Local Plan). Though it should be made clear that figure 38 is intended as illustrative and is not a prescriptive tool.
However, as drafted we have the following comments to make:
● 1b. The sub-limb needs to refer to storage and distribution.
● 1c. Should be removed entirely, it is the premise of good design which is addressed in other development management policies in the emerging plan.
● 1d. Requires rewording to be clear that the enhancements should only be required where they are identified as mitigation required to make an application acceptable in planning terms, consistent with the tests of a planning condition or obligation.
● 4. The opening sentence needs to be clear that ‘industrial’ is also acceptable. The first paragraph could also refer to the indicative spatial framework plan too (figure 38). The sub-limbs also do not add to the policy and should be removed entirely. Sub-limb g. is also unlikely to be legally sound as it would not meet the CIL regulations test, and there is case law to this effect.
● Paragraphs 8 – 29 for the most part just repeat existing development management policies and should be removed entirely. If elements are retained, they must be far more succinct and remove repetition.
● Elements of policy are far too onerous. For instance, 26 requiring all major development to be supported by detailed masterplanning and phasing strategies. This is unnecessary, and each proposal needs to be judged on its merits at the time it comes forward.
It is our view that the policy is unsound and unjustified as drafted. The Policy is overwhelmingly long and difficult to unpick each and every component and how they stitch together, as such it requires a comprehensive redraft to reduce it down to the critical matters which should guide development over time, whilst also ensuring it remains sufficiently flexible to adapt to the market over time.
Any policy should also be clear that whilst it covers the entirety of the North East Cambridge area, the policy will be applied appropriately to recognise that occupiers and landowners will not be able to adhere to many of the site wide assessment and strategies, especially the timing of them. The policy is to support and foster the important role of North East Cambridge, and to allow appropriate development to come forward.
Greater Cambridge Local Plan: Proposed Submission
Policy S/C/SRW: Station Road West
Respondent: Brookgate Land Limited & Network Rail Infrastructure Limited
Representation Summary:
Support the Station Road West allocation but consider amendments necessary to ensure flexibility and soundness. Object to specifying a fixed quantum of Class E floorspace, advocating a context-led mixed-use approach that could include employment, hotel, medical and residential uses. Concerns are raised about conflicting height and massing requirements, with support instead for a flexible, context-led approach and removal of prescriptive height limits. The requirement to avoid “negative impact” on Strategic Viewpoint E is considered subjective and should instead require regard to the view. Also seek amendments to the allocation boundary to reflect the developable area more accurately.
Change suggested by respondent:
Policy needs to be rewritten as set out above to ensure it is sound.
Full text:
Uses
There is overall support for the continued allocation of Station Road West as the final undeveloped parcel of the wider CB1 development. The area is known as the Devonshire Quarter and comprises land both within Brookgate Land Ltd and Network Rail Infrastructure Ltd and Network Rail ownership, with the latter comprising the existing car park.
It is acknowledged that the previous planning permission(s) would have delivered up to 11,300 sqm of Class E (g)(i) and (ii) floorspace, this should not be relied upon as a fixed benchmark, even as an approximate figure. It would unduly constrain flexibility and would not respond appropriately to changing economic, market or site-specific circumstances over the plan period.
It is therefore considered inappropriate for the Local Plan to specify a fixed quantum of Class E (g)(i) and
(ii) floorspace. Instead, the amount of development should be determined through a context-led approach, informed by site characteristics, surrounding uses, accessibility, design considerations and compliance with the rest of the allocation. This would allow future proposals to respond positively to evolving needs while still ensuring high-quality, sustainable development
It is noted that the land-uses within the allocation fail to acknowledge that a hotel use has previously been accepted in principle on the Site, as evidenced by the grant of planning permission under LPA Ref. 18/1678/FUL. This demonstrates that the Site has previously been considered suitable for town-centre use.
Furthermore, the Site occupies a highly sustainable location for residential development including Build to Rent and Co-living, being situated within a 200-metre walking distance of Cambridge Station and benefitting from excellent access to public transport, employment opportunities, and local services. Having regard to the future direction of national planning policy, as set out in the 2026 NPPF, there is a clear and strengthened presumption in favour of residential development in such sustainable, well-connected locations.
To provide flexibility and better reflect the Site’s potential, it is therefore proposed that the land-uses are not narrowly specified, but instead the site is allocated for ‘mixed-use development’. For the avoidance of doubt, mixed-use can include a mixture of uses within Class E, hotel, medical facilities (for which there is demand) and residential.
Height and Massing
Brookgate Land Ltd and Network Rail Infrastructure Ltd consider that the allocation contains conflicting requirements in relation to height and massing.
Point (a) indicates that massing should be context-led, suggesting flexibility to respond to the surrounding environment, whereas point (b) prescribes that building height should be less than, or similar to, contemporary development to the west of the station.
This creates tension between a flexible, context-driven approach and a rigid height limitation, potentially restricting the ability to respond appropriately to the site’s specific characteristics. It is therefore requested that prescriptions of building heights at point. (b) are removed from the allocation. Point (a) however, is supported and should be retained as a positive, context-led approach would allow for appropriate flexibility in an area of the City whereby height is greatly affected by viability.
Point (b) also states that new development should not ‘negatively impact’ Strategic Viewpoint E from Limekiln Road. It is considered that the term ‘negatively impact’ is highly subjective and open to varying interpretation, with limited clarity regarding which elements of the skyline are indeed considered to positively contribute at present. Further, there may be a negative impact which needs to be weighed in the planning balance.
To provide certainty for applicants and decision-makers, it is recommended that the policy is reworded so that proposals are required to ‘have regard to Strategic Viewpoint E’, rather than relying on a subjective standard of negative impact. This approach would support high-quality development that respects the strategic view while allowing for it to be considered in the planning balance.
We welcome the including of 1e. that clarifies development does not preclude future redevelopment of the train station, facilities and supporting infrastructure.
Redline Boundary
Furthermore, it must be noted that the inclusion of the railway tracks within the allocation reflects land-ownership boundaries but does not reflect the correct developable area. It is therefore requested that the redline of the allocation is amended to reflect the plan shown below.
Figure 1. Proposed Amendment to Site Location Plan for Station Road West - See PDF Representation
Action Required
As set out, we remain supportive of the overall principle of the draft allocation. However, we believe that the above changes are required to ensure that the policy is sound, justified and consistent with national policy.
Greater Cambridge Local Plan: Proposed Submission
Policy J/AW: Affordable workspace and creative industries
Respondent: Brookgate Land Limited & Network Rail Infrastructure Limited
Representation Summary:
Understand the objective of affordable workspace, consider Policy J/AW unsound due to insufficient evidence and potential viability impacts. Lacking justification for the 1,000 sq m threshold and the requirement for affordable workspace in perpetuity, advocating greater flexibility and case-by-case assessment. Concerns are also raised about cumulative development costs, including affordable workspace, CIL and other policy requirements. The Local Plan Viability Assessment is considered overly optimistic, relying on high rental values and prime yields that may not be achievable across Greater Cambridge. Without stronger evidence, the policy risks undermining the viability and delivery of employment development needed to support economic growth.
Change suggested by respondent:
As set out above, the policy is considered to be unsound as it is not based on robust evidence. Consideration needs to be given to its removal entirely.
Full text:
Whilst the objectives of supporting start-up businesses, SME’s and the creative sector are understood, concerns remain regarding the evidential basis for key elements of Policy J/AW, particularly the in-perpetuity requirement, the proposed reduction in the office and R&D threshold to 1,000 sq m and the cumulative impact of the policy when considered alongside the wider requirements of the Draft Local Plan.
The Affordable Workspace Study demonstrates a need for additional affordable workspace provision but provides limited justification as to why a 1,000 sq m threshold has been selected in preference to alternative thresholds previously consulted upon.
More flexibility is needed within the policy in order that it can respond to fluctuating market conditions. The in-perpetuity requirement should be revisited to allow for the duration to be considered on a case-by-case basis.
Fundamentally, the policy introduces a significant additional burden on commercial development in a market that is already expected to absorb a wide range of infrastructure, sustainability and place-making requirements. There is no clear evidence to demonstrate that the Council has looked at the cumulative impact of these requirements on top of pending CIL charges, to determine whether commercial development viability would be significantly impaired.
Further, we have concerns regarding the robustness of the Local Plan Viability Assessment (LPVA) July 2026. For instance, we believe that the costs assumptions underpinning the assessment are towards the bottom end of the scale, whilst rental values are towards the top end. This creates an overly optimistic position that is not likely to be achieved across the Plan area.
For example, in terms of gross development value (GDV), the LPVA applies a single Laboratory (Fringe) rent of £70.00 per sq ft across every typology it tests, regardless of location. That figure sits at or above the strongest rents being achieved in Greater Cambridge's established science park locations. By way of comparison, a 31,000 sq ft shell and core lab letting at the Orion Building, Unity Campus – one of the science parks specifically named in Policy J/AW as qualifying for the higher discount tier (Policy J/AW, criterion 1a and para 8.40) – was agreed at £44.00 per sq ft, over a third below the LPVA's assumed rate.
If a rate close to the top of the market is not reliably being achieved even at one of the policy's own named premium locations, applying that same premium figure uniformly across the wider area risks materially overstating the viability position on which the policy relies.
Similarly, prime yields of 5.25% have been adopted in respect of all Laboratory accommodation. In our view, such a yield could be achievable in certain prime locations. However, not in all. We do not consider it reasonable to apply prime yields on a blanket basis, across the entire Plan area, without adjustment for location.
It should be noted that Bidwells submitted representations to the proposed Greater Cambridge Draft CIL Charging Schedule during the consultation period in March 2026. As part of these representations, Bidwells submitted a Viability Technical Note on behalf of multiple clients, which critiqued the CIL Viability Assessment (the “CIL VA”) undertaken by Quintic Advisory.
Our Viability Technical Note included commentary on the various commercial markets also considered in the AV LPVA, including office and laboratory rents and yields. This commentary is highly relevant for the purposes of this Local Plan representation also.
It is material to highlight that the Councils have commissioned two separate area-wide viability assessments from two different consultants at a similar time – the Quintic CIL VA dated January 2026, and the AV LPVA dated July 2026, for two different policy purposes. Having reviewed both assessments, we note that there are numerous instances where different cost and value assumptions have been made by both consultants, whereas we would expect there to be more consistency. No reason for the different viability assumptions has been provided.
Given the material impact of both the introduction of CIL and Policy J/AW, these differences should be explained.
There remains a significant risk that the policy could discourage or constrain the delivery employment floorspace, particularly on smaller and medium-sized schemes, thereby undermining the competitiveness of Greater Cambridge as a location for business investment and growth. This is contrary to the ambition the government and Mayor have for Cambridge.
In the absence of more robust evidence demonstrating that the policy can be accommodated without affecting delivery, Policy J/AW is not considered to be sound and fails to strike an appropriate balance between securing affordable workspace and maintaining the viability and deliverability of the employment development needed to support the Local Plan's growth strategy.
In summary, whilst we do not object to premise of delivering affordable workspace and acknowledge the benefits that such a policy could bring, we conclude that the draft policy requires more robust evidence to demonstrate its acceptability, and beyond that requires revisions in order that it can be justified, effective and consistent with national planning policy.
Greater Cambridge Local Plan: Proposed Submission
Policy BG/BG: Biodiversity and geodiversity
Respondent: Brookgate Land Limited & Network Rail Infrastructure Limited
Representation Summary:
The representation objects to Policy BG/BG’s proposed requirement for 20% Biodiversity Net Gain (BNG), arguing that it is unsound, insufficiently justified and inconsistent with national policy. It contends that the statutory 10% BNG requirement already provides policy certainty and that any higher local target should be supported by robust evidence demonstrating deliverability, proportionality and viability across different sites. The policy is considered to impose an unjustified blanket uplift beyond the national framework. Instead, BNG delivered above the mandatory 10% should be recognised as a material benefit in the planning balance rather than required through a fixed policy target.
Change suggested by respondent:
The policy needs to be consistent with national policy and legislation and only refer to 10% net gain, with anything above a further material benefit as part of wider planning judgement.
Full text:
The proposed requirement to uplift the mandatory minimum to 20% BNG for major development is considered unsound, as it is not adequately justified and is inconsistent with national policy. The uplift is not supported by a robust evidence base and does not sufficiently demonstrate that it is proportionate or deliverable across all sites.
The national BNG framework provides clarity and certainty for plan-making and decision-taking. Any local requirement exceeding the statutory minimum must therefore be clearly justified, flexible, and grounded in site-specific ecological capacity and viability.
Policy BG/BG risks undermining policy certainty by imposing a fixed uplift beyond the national framework without adequate justification. Any BNG delivered above the mandatory 10% requirement should be treated as a material benefit in the planning balance, rather than a fixed policy requirement.
Greater Cambridge Local Plan: Proposed Submission
Policy I/SI: Safeguarding important infrastructure
Respondent: Brookgate Land Limited & Network Rail Infrastructure Limited
Representation Summary:
Raises concerns that the proposed East West Rail safeguarding has expanded since the Regulation 18 stage and now encroaches on key allocations at North East Cambridge, Station Road West and the Chesterton Sidings site. While acknowledging the safeguarding area reflects the 2026 East West Rail consultation, it argues the extent is likely to change through ongoing discussions. The safeguarding area may conflict with approved development and required station car parking. Although the revised policy’s flexibility is welcomed, the Station Road West safeguarding area could effectively sterilise the site, threatening delivery of the allocation and failing to reflect existing planning permissions.
Change suggested by respondent:
See attached PDF representation. The policy needs to ensure that the safeguarding areas all remain sufficiently flexible to allow development to come forward where it can be evidenced that they are no longer accurate.
Full text:
Set out on the draft policies map is an area of land to be safeguarded for the East West Rail Scheme, which encroaches on the allocations at North East Cambridge and Station Road West, including the Chesterton Siding site specifically. This is shown in figure 2 below, this extends much further into the Cambridge North area than it did at Regulation 18 stage.
Figure 2 – EWR Safeguarded Area at North East Cambridge taken from draft policies map. - See PDF representation for visual
Figure 3 – EWR Safeguarded Area at Station Road West taken from draft policies map. - See PDF representation for visual
It is acknowledged that the safeguarding area identified in figures 2 and 3 has been established by EWR 2026 consultation and has undergone separate consultation with landowners.
Brookgate Land Ltd has submitted comments to EWR during this consultation, highlighting that the proposed safeguarding land should align with the hybrid planning consent at Cambridge North East. Brookgate and Network Rail remain in active discussions with EWR to resolve conflicts between the ongoing development proposals and the ‘proposed’ safeguarding areas, which we believe are unlikely to reflect the final position.
Notably, the land identified for safeguarding includes areas where car parking is to be re-provided for the station in accordance with the franchise agreement. We welcome that the policy has been re-drafted with sufficient flexibility to accommodate evolving EWR requirements within safeguarded areas, rather than automatically resisting development within these zones.
Furthermore, the proposed extent of the safeguarded area at Station Road West would effectively sterilise all development on the Site, a critical issue that has not been addressed within the site allocation. Similar to the above, the safeguarded area does not take into account the two planning permissions that have previously been granted on the Site. The policy should therefore be reviewed to ensure it does not place a restriction on all development in this safeguarding zone and undermine the deliverability of the allocation.
Greater Cambridge Local Plan: Proposed Submission
Policy CC/DC: Designing for a changing climate
Respondent: Brookgate Land Limited & Network Rail Infrastructure Limited
Representation Summary:
The representation argues that several development management policies are unsound because they exceed requirements already addressed through other statutory consenting regimes, imposing unnecessary burdens on development. It contends that the Council should undertake a consistency review against the 2026 NPPF and National Development Management Policies, as policies that materially conflict with national policy may carry limited weight. While supporting the objectives of many policies, the representation emphasises the need for alignment with existing regulatory regimes to provide investor confidence. Where higher standards are proposed, these should be clearly justified through robust evidence and viability assessment.
Change suggested by respondent:
Policy to better reflect national policies to ensure they do not carry very limited weight upon adoption.
Full text:
There are several development management policies within the Plan which seek to exceed other consenting regimes requirements, thereby adding onerous requirements onto development which is unsound and unjustified.
The NPPF 2026 whilst not the examining plan at Annex A, paragraph 2 effectively requires a consistency check between Local Plan policies and the National Development Management Policies of the Framework. Where materially inconsistent, Local Plan policies will carry very limited weight, and weight applied to the Framework instead.
The Council needs to ensure that development management policies are consistent at this stage, and we have found no record of such an exercise being carried out as part of this process, and the transitional arrangement of Annex A, paragraph 2 would seemingly not apply to these policies as they have not been examined and adopted against the 2026 Framework. Therefore, Policy DM7 of the 2026 Framework would apply where the Council is seeking to exceed matters controlled by other statutory regimes.
Whilst supportive of the premise of many of these conditions, ensuring consistency with other consenting regimes is important for investor confidence; or where standards are exceeded it is clearly evidenced as to why and its viability. This follows on from the concerns we have with the Local Plan evidence base as discussed under the affordable workspace policy.
We are concerned that this is the case for the following policies:
● Policy BG/BG: Biodiversity and geodiversity;
● Policy CC/DC: Designing for a changing climate;
● Policy CC/NZ: Net zero carbon new buildings;
● Policy CC/WE: Water efficiency in new developments;
● Heritage related policies.
Greater Cambridge Local Plan: Proposed Submission
Policy CC/NZ: Net zero carbon new buildings
Respondent: Brookgate Land Limited & Network Rail Infrastructure Limited
Representation Summary:
The representation argues that several development management policies are unsound because they exceed requirements already addressed through other statutory consenting regimes, imposing unnecessary burdens on development. It contends that the Council should undertake a consistency review against the 2026 NPPF and National Development Management Policies, as policies that materially conflict with national policy may carry limited weight. While supporting the objectives of many policies, the representation emphasises the need for alignment with existing regulatory regimes to provide investor confidence. Where higher standards are proposed, these should be clearly justified through robust evidence and viability assessment.
Change suggested by respondent:
Policy to better reflect national policies to ensure they do not carry very limited weight upon adoption.
Full text:
There are several development management policies within the Plan which seek to exceed other consenting regimes requirements, thereby adding onerous requirements onto development which is unsound and unjustified.
The NPPF 2026 whilst not the examining plan at Annex A, paragraph 2 effectively requires a consistency check between Local Plan policies and the National Development Management Policies of the Framework. Where materially inconsistent, Local Plan policies will carry very limited weight, and weight applied to the Framework instead.
The Council needs to ensure that development management policies are consistent at this stage, and we have found no record of such an exercise being carried out as part of this process, and the transitional arrangement of Annex A, paragraph 2 would seemingly not apply to these policies as they have not been examined and adopted against the 2026 Framework. Therefore, Policy DM7 of the 2026 Framework would apply where the Council is seeking to exceed matters controlled by other statutory regimes.
Whilst supportive of the premise of many of these conditions, ensuring consistency with other consenting regimes is important for investor confidence; or where standards are exceeded it is clearly evidenced as to why and its viability. This follows on from the concerns we have with the Local Plan evidence base as discussed under the affordable workspace policy.
We are concerned that this is the case for the following policies:
● Policy BG/BG: Biodiversity and geodiversity;
● Policy CC/DC: Designing for a changing climate;
● Policy CC/NZ: Net zero carbon new buildings;
● Policy CC/WE: Water efficiency in new developments;
● Heritage related policies.
Greater Cambridge Local Plan: Proposed Submission
Policy CC/WE: Water efficiency in new developments
Respondent: Brookgate Land Limited & Network Rail Infrastructure Limited
Representation Summary:
The representation argues that several development management policies are unsound because they exceed requirements already addressed through other statutory consenting regimes, imposing unnecessary burdens on development. It contends that the Council should undertake a consistency review against the 2026 NPPF and National Development Management Policies, as policies that materially conflict with national policy may carry limited weight. While supporting the objectives of many policies, the representation emphasises the need for alignment with existing regulatory regimes to provide investor confidence. Where higher standards are proposed, these should be clearly justified through robust evidence and viability assessment.
Change suggested by respondent:
Policy to better reflect national policies to ensure they do not carry very limited weight upon adoption.
Full text:
There are several development management policies within the Plan which seek to exceed other consenting regimes requirements, thereby adding onerous requirements onto development which is unsound and unjustified.
The NPPF 2026 whilst not the examining plan at Annex A, paragraph 2 effectively requires a consistency check between Local Plan policies and the National Development Management Policies of the Framework. Where materially inconsistent, Local Plan policies will carry very limited weight, and weight applied to the Framework instead.
The Council needs to ensure that development management policies are consistent at this stage, and we have found no record of such an exercise being carried out as part of this process, and the transitional arrangement of Annex A, paragraph 2 would seemingly not apply to these policies as they have not been examined and adopted against the 2026 Framework. Therefore, Policy DM7 of the 2026 Framework would apply where the Council is seeking to exceed matters controlled by other statutory regimes.
Whilst supportive of the premise of many of these conditions, ensuring consistency with other consenting regimes is important for investor confidence; or where standards are exceeded it is clearly evidenced as to why and its viability. This follows on from the concerns we have with the Local Plan evidence base as discussed under the affordable workspace policy.
We are concerned that this is the case for the following policies:
● Policy BG/BG: Biodiversity and geodiversity;
● Policy CC/DC: Designing for a changing climate;
● Policy CC/NZ: Net zero carbon new buildings;
● Policy CC/WE: Water efficiency in new developments;
● Heritage related policies.