Greater Cambridge Local Plan: Proposed Submission

Search representations

Results for CALA Homes search

New search New search

Object

Greater Cambridge Local Plan: Proposed Submission

Policy S/DS: Development strategy

Representation ID: 214256

Received: 25/09/2026

Respondent: CALA Homes

Agent: Lanpro Services

Legally compliant? Yes

Sound? No

Representation Summary:

The Plan is unsound as it is not considered “justified” or “effective” when assessed against the 2024 NPPF.

The number of ‘deliverable’ sites has decreased in the updated Housing Trajectory, so there are fundamental concerns that Greater Cambridge will not meet its five year housing land supply.

The Plan relies on new settlements, which depend on new infrastructure, such as CSET. Delays could affect the commencement, phasing and rate of housing delivery. The allocation of smaller sites would diversify the supply and provide greater flexibility and resilience.

Land west of Water Lane, Melbourn, represents a suitable and deliverable additional allocation.

Comment

Greater Cambridge Local Plan: Proposed Submission

Chapter 2: Development strategy

Representation ID: 214814

Received: 25/09/2026

Respondent: CALA Homes

Agent: Lanpro Services

Representation Summary:

This representation relates to a site submission (HELAA Ref 40274, Land off Water Lane, Melbourn)'

The Site at Water Lane, Melbourn, is capable of making an early contribution to housing supply before the new settlements are expected to deliver at scale. Its allocation would increase the supply of deliverable housing sites, reduce reliance on major infrastructure dependent developments and strengthen the flexibility and resilience of the housing trajectory during the early years following adoption.

Comment

Greater Cambridge Local Plan: Proposed Submission

Appendices

Representation ID: 214815

Received: 25/09/2026

Respondent: CALA Homes

Agent: Lanpro Services

Representation Summary:

This comment relates to Appendix D.

The 2026 Addendum has calculated that the housing trajectory provides for headroom of 8.2% (paragraph 3.2.72). It adds that the size of the headroom should reflect the risk of delays during the Plan Period, especially regarding new settlements (paragraph 3.2.76).

The headroom figure is reliant on the delivery within new settlements, which are delivered later in the Plan Period once the infrastructure is provided, such as CSET. Therefore, the headroom should not be considered to be evenly distributed through the Plan Period. Therefore, there are concerns that there is a lack of resilience if there is an undersupply in delivery of ‘deliverable’ sites on the adoption of the Local Plan.

For instructions on how to use the system and make comments, please see our help guide.