Object

Greater Cambridge Local Plan: Proposed Submission

Policy S/SH: Settlement hierarchy

Representation ID: 214150

Received: 25/09/2026

Respondent: SmithsonHill

Agent: Lichfields

Legally compliant? Yes

Sound? No

Representation Summary:

SmithsonHill recognises that plans will often seek to develop an understanding of their settlements and the associated hierarchy. However, the settlement hierarchy is being applied too rigidly if it results in locations being discounted notwithstanding their relationship with major employment destinations and existing or planned sustainable transport infrastructure. In a rural area containing dispersed but substantial employment campuses, the sustainability of a location cannot sensibly be assessed solely by reference to the services contained within an individual village boundary. The relevant question is also how effectively that location connects residents to employment, services and wider transport networks.

In this context, the Councils’ settlement hierarchy methodology does not provide a sufficiently robust basis for determining the relative sustainability of rural settlements or the scale of growth that they should accommodate.

Attachments:

Object

Greater Cambridge Local Plan: Proposed Submission

Appendices

Representation ID: 214157

Received: 25/09/2026

Respondent: SmithsonHill

Agent: Lichfields

Legally compliant? Yes

Sound? No

Representation Summary:

This representation relates to Appendix D - Housing trajectory and five-year housing land supply calculation. It is noted that the GCSP Service has sought to apply the ‘Liverpool’ method to its 5YHLS calculation, having the effect of offsetting shortfalls in delivery against the latest (2026) standard method over the whole plan period from adoption (in 2028), rather than over the five-year period only (the ‘Sedgefield’ method). The GCSP Service admits that using an alternative approach would have led to only being able to demonstrate a marginal (5.03 years) 5YHLS on adoption of the plan in 2028. The 5.47 years’ supply on adoption considered a tentative position which carries significant risk of being challenged when considered in the context of its optimistic assumptions about the future deliverability of allocated sites and inclusion of a windfall allowance.

Object

Greater Cambridge Local Plan: Proposed Submission

Appendices

Representation ID: 214158

Received: 25/09/2026

Respondent: SmithsonHill

Agent: Lichfields

Legally compliant? Yes

Sound? No

Representation Summary:

This representation relates to Appendix D - Housing trajectory and five-year housing land supply calculation. Given that windfall sites account for 425 homes per annum in the trajectory, this would remove 2,125 homes from supply in a given five-year period. The effects of such a reduction in assumed supply means the Council would be unable to demonstrate a 5YHLS until 2036/37 based on the scenarios presented in the table at A.2 of the HDSA 2026. Even if assuming that a 425 home-per-annum windfall supply were forthcoming on specific sites for the first three years of a given 5YHLS period, this would still amount to an 850-unit reduction in assumed supply over a given five-year period which GCSP will need to make up for as a matter of urgency if the plan is to be effective and the presumptions at NPPF 2026 policies S5(1)(j) or GB7(1)(g) avoided. On the basis of the above, the proposed trajectory would not be effective in maintaining a supply of deliverable housing sites and is not sound with reference to NPPF 2024 paragraph 36(c).

Object

Greater Cambridge Local Plan: Proposed Submission

Appendices

Representation ID: 214159

Received: 25/09/2026

Respondent: SmithsonHill

Agent: Lichfields

Legally compliant? Yes

Sound? No

Representation Summary:

This representation relates to Appendix D - Housing trajectory and five-year housing land supply calculation. The HDSA 2026 suggests that comparatively low delivery in the earlier years of the plan as sites tend to need the Local Plan to be adopted before they can come forward through the planning application process and can be delivered. Whilst this principle is not necessarily disputed, this assumption appears to have been carried through to assume a four-year lead-in time from adoption of the plan to completions on as many as eight newly-allocated sites in 2032/33 totalling 655 units: 56% of the total amount of anticipated oversupply in the whole 2028/29 to 2032/33 period. This is highly ambitious and demonstrates further the precarity upon which any future 5YHLS position rests (notwithstanding that one is unlikely upon adoption).

Object

Greater Cambridge Local Plan: Proposed Submission

Appendices

Representation ID: 214160

Received: 25/09/2026

Respondent: SmithsonHill

Agent: Lichfields

Legally compliant? Yes

Sound? No

Representation Summary:

This representation relates to Appendix D - Housing trajectory and five-year housing land supply calculation. SmithsonHill has more general concerns around the extent to which the housing trajectory can be relied upon as a forecast of supply in Greater Cambridge. the HDSA fails to acknowledge the significant variations in market fragments around Greater Cambridge, and the impact this has on deliverability of sites, particularly when there is a blanket affordable housing policy across the whole area. The HDSA fails to acknowledge the decline in market absorption rates referred to, which is in-turn slowing down market housing delivery. On this basis, SmithsonHill's view is that despite the additional evidence submitted, the fast lead-in times and the high build out rates of a number of the large-scale allocations are plainly unrealistic and therefore should be tempered.

Object

Greater Cambridge Local Plan: Proposed Submission

Appendices

Representation ID: 214161

Received: 25/09/2026

Respondent: SmithsonHill

Agent: Lichfields

Legally compliant? Yes

Sound? No

Representation Summary:

This representation relates to Appendix D - Housing trajectory and five-year housing land supply calculation. It remains relevant that of the 52,032 homes identified in the dGCLP (Reg 19) for delivery over the plan period, more than 7,000 of these are windfalls. Of these, only 2,052 homes are on specific identified sites. Therefore, more than 5% of the dGCLP’s (Reg 19) housing requirement is future speculative, unidentified development. Whilst the principle of applying a windfall allowance is not disputed, such a significant portion of windfall supply leaves significant parts of the housing trajectory as unknowns. Consideration should be given to the potential of omissions sites, which could be strategically planned with accompanying policies, designed to meet the strategic goals of the plan that would facilitate a more joined-up approach to development for the 7,225 homes currently anticipated on unidentified windfall sites.

Object

Greater Cambridge Local Plan: Proposed Submission

Sustainability Appraisal

Representation ID: 214168

Received: 25/09/2026

Respondent: SmithsonHill

Agent: Lichfields

Legally compliant? Yes

Sound? No

Representation Summary:

We previously noted that the SA should include alternative, higher, housing and job growth scenarios, so it is concerning to see that these have not been incorporated into the updated SA.

The Reg 19 plan is underpinned by an updated Sustainability Appraisal (July 2026), however this does not introduce any additional options for housing or employment growth quanta, instead ‘doubling down’ on the preferred approach underpinning the Policy S/JH.