Greater Cambridge Local Plan: Proposed Submission

Search representations

Results for SmithsonHill search

New search New search

Object

Greater Cambridge Local Plan: Proposed Submission

Policy S/JH: New jobs and homes

Representation ID: 213522

Received: 25/09/2026

Respondent: SmithsonHill

Agent: Lichfields

Legally compliant? Yes

Sound? No

Representation Summary:

National policy is clear that significant weight should be given in planning to the need to support economic growth, particularly where Britain can be a global leader in innovation; clearly this applies to Cambridge, but this has unfortunately been down-played by GCSP which is seeking to continually defer any ‘step change’ in Cambridge. The Local Plan is not aligning its housing ambitions with those it holds for the economy.

Planning to meet the ‘minimum’ housing need in Cambridge will worsen affordability in the long-term, and even more so if wage growth continues to outpace national averages and/or if actual housing demand is higher.

The misalignment of housing and jobs will result in a substantial number of negative outcomes for commuting patterns, affordability and overall economic growth. It is contrary to a number of policies in the NPPF across these themes and also would undermine virtually all of the draft GCLP’s strategic priorities.

Object

Greater Cambridge Local Plan: Proposed Submission

Policy S/DS: Development strategy

Representation ID: 213523

Received: 25/09/2026

Respondent: SmithsonHill

Agent: Lichfields

Legally compliant? Yes

Sound? No

Representation Summary:

The GCLP directs the majority of its new housing to locations where sustainability depends on transport infrastructure that is not yet in place, in many cases not yet funded or, in some cases, not yet decided.

The Councils’ settlement hierarchy methodology does not provide a sufficiently robust basis for determining the relative sustainability of rural settlements or the scale of growth that they should accommodate. This undermines the ability of the evidence base to demonstrate that Policy S/DS represents an appropriate strategy.

The scale of development proposed across the Rural Southern Cluster creates an opportunity—and a need—for a more coordinated approach to the A505 corridor. The GCLP evidence base should demonstrate that the cumulative implications of growth for the A505 have been assessed and that there is a coherent strategy for improvements to the corridor.

The GCLP needs to allocate more sites for residential development in order to be found sound. This is to bring planned levels of employment growth in line with the housing requirements and support a housing trajectory in which needs are met at the earliest opportunity.

Attachments:

Object

Greater Cambridge Local Plan: Proposed Submission

Policy S/AMC/WHD: Whittlesford Parkway Station Area, Whittlesford Bridge Area of Major Change

Representation ID: 213529

Received: 25/09/2026

Respondent: SmithsonHill

Agent: Lichfields

Legally compliant? Yes

Sound? No

Representation Summary:

It is considered that the policy identifies the right opportunity but lacks an effective delivery mechanism. Absent an allocation, the Councils are likely to face proposals relying on the 2026 NPPF decision-making framework. A plan-led allocation would allow those benefits to be captured strategically and on the Councils’ terms.

SmithsonHill considers that by allocating HELAA Site ID 200765, a more comprehensive development could be achieved that aligns more closely with the thrust of Policy S/AMC/WHD and the Council’s ambitions, whilst meeting housing needs in an area where there is demand.

Attachments:

Object

Greater Cambridge Local Plan: Proposed Submission

Appendices

Representation ID: 213530

Received: 25/09/2026

Respondent: SmithsonHill

Agent: Lichfields

Legally compliant? Yes

Sound? No

Representation Summary:

This representation relates to Appendix D - Housing trajectory and five-year housing land supply calculation. The GCSP Service’s total identified housing supply amounts to 52,032 homes, giving only an 8.2% buffer above the minimum requirement of 48,069 dwellings set out in Policy S/JH. As a point of principle, 8.2% is unlikely to provide sufficient headroom to ensure delivery of the housing requirement. This is particularly relevant in the context that on adoption, this plan will have to adhere to the NPPF 2026 in setting out its 5YHLS position, which no longer allows for an inclusion of windfall sites, meaning an even greater buffer on larger-scale sites supply is required in order to be able demonstrate a 5YHLS.

Object

Greater Cambridge Local Plan: Proposed Submission

Policy H/AH: Affordable Housing

Representation ID: 213531

Received: 25/09/2026

Respondent: SmithsonHill

Agent: Lichfields

Legally compliant? Yes

Sound? No

Representation Summary:

SmithsonHill considers that the application of a blanket 40% affordable housing threshold, in combination with a blanket £60/sqm rate of Community Infrastructure Levy (CIL) across the whole of Greater Cambridge, that considers neither site size, location, or residential development typology, is fundamentally flawed.

With regards to viability overall, SmithonHill has significant concerns about the implications of NDMP DM5 if the draft GCLP were adopted in its current form. Based on the content of the VR as it stands, there are many inputs which are not realistic or are missing entirely. If the draft GCLP were adopted on the basis of the VR, it would defacto mean any application for a strategic site would have to be provide its own viability review under DM5(2)(b). The more pressing problem is that applications of any scale coming forward with realistic viability assumptions around sales values, in kind infrastructure provision, professional fees etc. would not necessarily have a route through DM5(2) at the application stage as parts (a), (b) and (d) might not apply.

Comment

Greater Cambridge Local Plan: Proposed Submission

Policy H/HM: Housing Mix

Representation ID: 213535

Received: 25/09/2026

Respondent: SmithsonHill

Agent: Lichfields

Representation Summary:

SmithsonHill does not necessarily object to this policy and do not raise concerns relating to its soundness against the NPPF (2024). However, noting that decision-making policies in NPPF (2026) would be relevant straight away upon adoption of the plan, Policy H/HM should be brought in line with NPPF (2026) decision-making policy HO8(3).

Object

Greater Cambridge Local Plan: Proposed Submission

Chapter 2: Development strategy

Representation ID: 213537

Received: 25/09/2026

Respondent: SmithsonHill

Agent: Lichfields

Legally compliant? Yes

Sound? No

Representation Summary:

This representation relates to a site submission (HELAA ref 200765: Land to the east of the A1301, south of the A505 near Hinxton and west of the A1301, north of the A505 near Whittlesford.)

It is noted that the HELAA assessment for the emerging allocation at Grange Farm (HELAA Site ID 59401) also has an Overall Suitability RAG Score of Red, Available RAG of Green and Achievability RAG of Green. This shows that if HELAA site 200765 were to be pursued as an emerging allocation, it would do so with the same concluding assessment as Grange Farm, which is an emerging allocation. As set out extensively elsewhere in our representations, more housing allocations are needed to make this plan sound.

Please see attached document. The response includes tables, images and formatting that cannot be supported by this text box.

Attachments:

Object

Greater Cambridge Local Plan: Proposed Submission

Chapter 2: Development strategy

Representation ID: 213541

Received: 25/09/2026

Respondent: SmithsonHill

Agent: Lichfields

Legally compliant? Yes

Sound? No

Representation Summary:

SmithsonHill does not consider that the VR has appropriately considered the cost of s106 infrastructure alongside CIL for strategic sites (for a residential-led development this is defined in the NPPF 2026 as at least 1,500 dwellings). Whilst it is acknowledged that the
VR does consider affordable housing and CIL, there is a significant lack of specificity around the infrastructure costs associated with proposed allocations.

A ‘standard’ s106 cost-per-dwelling rate of £45,500 is applied to each development typology tested, regardless of the scale of development and site-specific infrastructure needed to make it acceptable in planning terms. This is despite the acknowledgment at p.91 of the VR. For a development strategy containing such a significant quantum of strategic proposals, this is not an adequate assessment of effects.

Please consider Appendix 2 - The Hill Group reps to the Greater Cambridge CIL Charging Schedule alongside the Representation ID: 213531, which is referenced in the Policy H-AH - SmithsonHill.pdf

Object

Greater Cambridge Local Plan: Proposed Submission

Sustainability Appraisal

Representation ID: 214147

Received: 25/09/2026

Respondent: SmithsonHill

Agent: Lichfields

Legally compliant? Yes

Sound? No

Representation Summary:

The SA does not clearly explain why the Rural Southern Cluster has only been assessed in the form of dispersed village growth, nor why a larger-scale, station-led approach was not considered as part of the strategic alternatives appraisal. Equally, whilst the SA compares the relative performance of individual sites and options, it does not clearly demonstrate why the balance ultimately chosen by the Plan (with all its uncertainties and backloaded housing development) is preferable to an alternative strategy placing greater emphasis on development around existing transport infrastructure and established employment clusters.

For further comments on the Sustainability Appraisal, please refer to the submission attachment.

Attachments:

Object

Greater Cambridge Local Plan: Proposed Submission

Policy S/DS: Development strategy

Representation ID: 214148

Received: 25/09/2026

Respondent: SmithsonHill

Agent: Lichfields

Legally compliant? Yes

Sound? No

Representation Summary:

Grange Farm records the lowest baseline connectivity at the bottom of the range of any strategic allocation in Greater Cambridge. Grange Farm’s sustainable transport proposition depends upon new infrastructure, including the proposed mass rapid transit/CSET connection. There is significant uncertainty around elements of that infrastructure and its delivery.

The appropriate comparison is not whether Grange Farm can on paper eventually be made sustainable, but whether the overall strategy makes the most appropriate use of existing as well as proposed infrastructure, and whether a greater proportion of growth should be directed towards locations where sustainable connectivity already exists.

Attachments: