Draft Greater Cambridge Local Plan for consultation
Search representations
Results for NEUBAU Architecture Ltd search
New searchSupport
Draft Greater Cambridge Local Plan for consultation
Policy J/AW: Affordable workspace and creative industries
Representation ID: 204676
Received: 30/01/2026
Respondent: NEUBAU Architecture Ltd
I support Cambridge Junction and Create Cambridge in asking that:
• “Affordable Office Space” is clearly distinguished from “Cultural Production Space”
• genuinely affordable cultural production space is required (e.g. peppercorn, with rental charges well-below market rates and established based on evidence, ie Wysing Arts Centre’s research on affordable artist studios)
• rehearsal, making and sole-use studios are prioritised over generic co-working
• a minimum requirement (e.g., 10% in schemes over 1,000 sqm) is introduced
This safeguards usable creative space from being diluted.
I support Cambridge Junction and Create Cambridge in asking that:
• “Affordable Office Space” is clearly distinguished from “Cultural Production Space”
• genuinely affordable cultural production space is required (e.g. peppercorn, with rental charges well-below market rates and established based on evidence, ie Wysing Arts Centre’s research on affordable artist studios)
• rehearsal, making and sole-use studios are prioritised over generic co-working
• a minimum requirement (e.g., 10% in schemes over 1,000 sqm) is introduced
This safeguards usable creative space from being diluted.
Support
Draft Greater Cambridge Local Plan for consultation
Policy WS/MU: Meanwhile uses during long term redevelopments
Representation ID: 204680
Received: 30/01/2026
Respondent: NEUBAU Architecture Ltd
I support Create Cambridge in asking that:
a Meanwhile Strategy is required at validation for Areas of Major Change and large phased developments
strategies set out activation of vacant sites, governance arrangements, exit pathways to permanent provision
cultural/community uses are embedded throughout long construction periods, not only at completion
long-term vacant units are proactively enabled for cultural use; artists involved in shaping terms
clear exit pathways prevent displacement when redevelopment proceeds
creative commons/Creative Land Trust-style models are explored to secure permanent affordable space
Create Cambridge is engaged as a key consultee on delivery models, drawing on national and international precedents
I support Create Cambridge in asking that:
a Meanwhile Strategy is required at validation for Areas of Major Change and large phased developments
strategies set out activation of vacant sites, governance arrangements, exit pathways to permanent provision
cultural/community uses are embedded throughout long construction periods, not only at completion
long-term vacant units are proactively enabled for cultural use; artists involved in shaping terms
clear exit pathways prevent displacement when redevelopment proceeds
creative commons/Creative Land Trust-style models are explored to secure permanent affordable space
Create Cambridge is engaged as a key consultee on delivery models, drawing on national and international precedents
Support
Draft Greater Cambridge Local Plan for consultation
Policy GP/QP: Establishing high quality landscape and public realm
Representation ID: 204683
Received: 30/01/2026
Respondent: NEUBAU Architecture Ltd
I support Create Cambridge in asking that:
• public art and cultural activation link to a Percent for Art initiative or Cultural Infrastructure Levy
• the Public Art SPD is explicitly referenced
• artists are appointed at RIBA Stage 2–3, embedded in masterplanning
• Create Cambridge is engaged as advisor/consultee/co-curator (with communities) in developing plans and strategies for public art and cultural activation
This ensures cultural value is designed in from the outset.
I support Create Cambridge in asking that:
• public art and cultural activation link to a Percent for Art initiative or Cultural Infrastructure Levy
• the Public Art SPD is explicitly referenced
• artists are appointed at RIBA Stage 2–3, embedded in masterplanning
• Create Cambridge is engaged as advisor/consultee/co-curator (with communities) in developing plans and strategies for public art and cultural activation
This ensures cultural value is designed in from the outset.
Support
Draft Greater Cambridge Local Plan for consultation
Policy S/NEC: North East Cambridge
Representation ID: 204686
Received: 30/01/2026
Respondent: NEUBAU Architecture Ltd
I support Create Cambridge in asking that:
• delivery of a cultural anchor (venue, arts centre or artist studios) is required in Phase 1
• cultural provision is not deferred to later phases, where it is at risk of non-delivery
• Create Cambridge is engaged as an advisor/consultee on plans and proposals for cultural infrastructure as part of new developments
Early cultural infrastructure is essential to avoid dormitory development and support identity, cohesion and liveability.
I support Create Cambridge in asking that:
• delivery of a cultural anchor (venue, arts centre or artist studios) is required in Phase 1
• cultural provision is not deferred to later phases, where it is at risk of non-delivery
• Create Cambridge is engaged as an advisor/consultee on plans and proposals for cultural infrastructure as part of new developments
Early cultural infrastructure is essential to avoid dormitory development and support identity, cohesion and liveability.
Support
Draft Greater Cambridge Local Plan for consultation
Policy S/CE: Cambridge East
Representation ID: 204689
Received: 30/01/2026
Respondent: NEUBAU Architecture Ltd
I support Create Cambridge in asking that:
• delivery of a cultural anchor (venue, arts centre or artist studios) is required in Phase 1
• cultural provision is not deferred to later phases, where it is at risk of non-delivery
• Create Cambridge is engaged as an advisor/consultee on plans and proposals for cultural infrastructure as part of new developments
Early cultural infrastructure is essential to avoid dormitory development and support identity, cohesion and liveability.
I support Create Cambridge in asking that:
• delivery of a cultural anchor (venue, arts centre or artist studios) is required in Phase 1
• cultural provision is not deferred to later phases, where it is at risk of non-delivery
• Create Cambridge is engaged as an advisor/consultee on plans and proposals for cultural infrastructure as part of new developments
Early cultural infrastructure is essential to avoid dormitory development and support identity, cohesion and liveability.
Support
Draft Greater Cambridge Local Plan for consultation
Policy I/ID: Infrastructure and delivery
Representation ID: 204691
Received: 30/01/2026
Respondent: NEUBAU Architecture Ltd
I support Cambridge Junction/Create Cambridge in asking that:
cultural infrastructure is recognised as core civic infrastructure
cultural venues are integrated into infrastructure planning, phasing and investment pathways
a partnership-owned Cultural Infrastructure Pipeline is established for new provision and renewal
despite hight cultural participation (classed as “low cultural need”), the Plan recognises that significant investment is required
coordinated public/private/philanthropic investment is enabled, including visitor-linked and locally retained funding, with findings embedded in infrastructure planning
community asset transfer is strengthened with governance support, capital access, enabling genuine community ownership
Create Cambridge is engaged as an advisor on cultural infrastructure, strategy development.
I support Cambridge Junction/Create Cambridge in asking that:
cultural infrastructure is recognised as core civic infrastructure
cultural venues are integrated into infrastructure planning, phasing and investment pathways
a partnership-owned Cultural Infrastructure Pipeline is established for new provision and renewal
despite hight cultural participation (classed as “low cultural need”), the Plan recognises that significant investment is required
coordinated public/private/philanthropic investment is enabled, including visitor-linked and locally retained funding, with findings embedded in infrastructure planning
community asset transfer is strengthened with governance support, capital access, enabling genuine community ownership
Create Cambridge is engaged as an advisor on cultural infrastructure, strategy development.
Support
Draft Greater Cambridge Local Plan for consultation
Policy I/DI: Digital and telecommunications infrastructure
Representation ID: 204693
Received: 30/01/2026
Respondent: NEUBAU Architecture Ltd
I support Create Cambridge in asking that:
• further development of the local plan refers to the Create Cambridge Insights Report as evidence base with regards to the development of Cambridge’s digital cultural infrastructure
• digital cultural infrastructure is recognised within infrastructure expectations/GCCIS
• commitment to common metrics, aggregated data and measurement tools
• digital capability is included within the definition of cultural infrastructure
• the Cultural Infrastructure Pipeline incorporates shared platforms, interoperable systems, aggregated data tools and organisational digital capacity
• low digital maturity is addressed, including that only 9.2% of venues currently use connected booking systems
I support Create Cambridge in asking that:
• further development of the local plan refers to the Create Cambridge Insights Report as evidence base with regards to the development of Cambridge’s digital cultural infrastructure
• digital cultural infrastructure is recognised within infrastructure expectations/GCCIS
• commitment to common metrics, aggregated data and measurement tools
• digital capability is included within the definition of cultural infrastructure
• the Cultural Infrastructure Pipeline incorporates shared platforms, interoperable systems, aggregated data tools and organisational digital capacity
• low digital maturity is addressed, including that only 9.2% of venues currently use connected booking systems
Support
Draft Greater Cambridge Local Plan for consultation
Wellbeing and social inclusion
Representation ID: 204697
Received: 30/01/2026
Respondent: NEUBAU Architecture Ltd
I support Cambridge Junction and Create Cambridge in asking that:
• the Cultural Infrastructure Strategy strengthens its focus on delivery pathways, not only mapping of need
• clearer links are made to planning obligations, capital funding routes and operating models
• partnership/shared-service capacity is resourced
• Creative Commons approaches are included as part of long-term stability, not only meanwhile use
• Create Cambridge is engaged as advisor/consultee on the further development of the Cultural Infrastructure Strategy
I support Cambridge Junction and Create Cambridge in asking that:
• the Cultural Infrastructure Strategy strengthens its focus on delivery pathways, not only mapping of need
• clearer links are made to planning obligations, capital funding routes and operating models
• partnership/shared-service capacity is resourced
• Creative Commons approaches are included as part of long-term stability, not only meanwhile use
• Create Cambridge is engaged as advisor/consultee on the further development of the Cultural Infrastructure Strategy
Support
Draft Greater Cambridge Local Plan for consultation
Policy S/PRIA/EG: Eastern Gate
Representation ID: 204739
Received: 30/01/2026
Respondent: NEUBAU Architecture Ltd
The St Andrew the Less Community Project supports plans for improvements to the Eastern Gate, and encourages an addition:
1.g. celebrate and enhance the existing heritage, recognising that heritage can increase pride in place and connectedness for communities. The heretofore neglected heritage of the area must be revived and become available for use by the community and wider public.
Details of how this can be done are in the attached document.
The development of a heritage trail will also contribute to the vibrancy of this area and Riverside - details also attached.
The St Andrew the Less Community Project supports plans for improvements to the Eastern Gate, and encourages an addition:
1.g. celebrate and enhance the existing heritage, recognising that heritage can increase pride in place and connectedness for communities. The heretofore neglected heritage of the area must be revived and become available for use by the community and wider public.
Details of how this can be done are in the attached document.
The development of a heritage trail will also contribute to the vibrancy of this area and Riverside - details also attached.
Support
Draft Greater Cambridge Local Plan for consultation
Policy GP/HE: Historic environment
Representation ID: 204766
Received: 30/01/2026
Respondent: NEUBAU Architecture Ltd
The St Andrew the Less Community strongly supports this policy, especially 2a, where it takes in account "the positive contribution that conserving heritage assets can make to the sustainability of communities". The St Andrew the Less Community Project recognises the importance of heritage in creating a sense of belonging
The St Andrew the Less Community strongly supports this policy, especially 2a, where it takes in account "the positive contribution that conserving heritage assets can make to the sustainability of communities". The St Andrew the Less Community Project recognises the importance of heritage in creating a sense of belonging