Full text:
These representations have also been accompanied by site submission details relevant to HELAA Reference OS277 / 40248.
LDL welcomes draft Policy S/SHF and, as the primary landowner/stakeholder of the proposed site allocation, will liaise with the Council to successfully implement the allocation and contribute significantly to the economic vision and growth priorities of the GCLP.
The Site Allocation Topic Paper (‘SATP’) finds that the site offers “…the best location in terms of meeting key locational preferences…” identified in the GCW&ISNR and goes on to explain the reasons why (para 7.15).
The SATP also identifies that the site allocation reflects the agglomeration of two site promotions (para 7.12). The other promoter is the owner of the Slate Hall Farm existing employment area, indicatively identified as the ‘Employment Led Development’ area on GCLP Figure 108. LDL is capable of both bringing forward its land for development independently and to incorporate and facilitate the bringing forward and accessing the smaller part of the allocation site. LDL is actively liaising with this fellow site promoter on bringing forward their development land as part of a co-ordinated and comprehensive phased delivery of the whole allocation site, as demonstrated by the S/SHF Site Allocation: Indicative Masterplan (at Appendix 2).
The ‘Vision and identity’ section (points 1 to 3) sets out the objectives of the allocation. We concur with point 1 that, aligned with the NPPF and its proposed revisions, “It will provide a range of logistics and industrial uses that can support the long-term needs of the Greater Cambridge population and economy”
Development Capacity
The ‘Uses’ section (point 4) sets out the proposed land use provision and approximate quantum of the development in the allocation. It identifies that the site allocation has “…capacity for approximately 220,000 sq.m GIA of commercial uses providing a flexible range of small-to-medium scale units…”. The indicative capacity has been informed by various parts of the GCLP Evidence base
Policy S/DS (e) states: “Slate Hall Farm, Junction 25, A14 – a new allocation for masterplanned employment-led development that responds sensitively to the local landscape and secures access to new green infrastructure for future workers and the local community: including approximately 240,000m2 employment floorspace for industrial and warehousing uses, with a mix of small-medium units to support the growth of a wide range of different businesses;”
The Site Allocations Topic Paper (SATP, para 7.12) states that - “Consideration of site capacity: The site has been proposed by two site promoters. The larger proportion existing of the whole site allocation with the exception of Slate Hall Farm and the existing employment area proposed 240,000 sqm of employment floorspace. The existing employment site has separately been nominated through the call for sites process and these two sites have been brought together. This will enable the site to be planned for and delivered holistically.”
The SATP (para 7.13) then explains that - “The eastern part of the site is identified for green infrastructure, water management and biodiversity improvement. The developable area of the site is around 70 hectares, but also includes hedgerows and other features including a bridleway that need to be incorporated into green corridors and other mitigation. Applying a plot ratio of 0.3, would deliver a capacity of approximately 220,000 square metres which would need to be refined through a landscape lead masterplanning process.”
GCSP have, in estimating a 7o ha developable area and 0.3 plot ratio, adopted a cautious approach to confidently identify a minimum capacity that this allocation site might bring forward, to be considered against the employment need requirement. We consider that approach is an appropriate starting point for a local plan allocation but, as the SATP recognises, this estimate “…would need to be refined through a landscape lead master-planning process.” LDL have adopted a landscape-led master-planning process for its site and the whole S/SHF site allocation. This has informed the emerging site masterplan, which was used to inform the 240,000 sq.m provision figure in the SATP (derived from the LDL team and the SHF promoters).
We therefore consider it appropriate to align the Development strategy and site allocation capacity estimates, by using the former (240,000 sq.m), given the previous LDL GCLP submission / evidence on development capacity and clarifying in policy S/SHF that the development quantum is to be established though a landscape-led masterplan process.
Unit Sizes
LDL’s concern relates to the fact that, similar t0 Policy S/DS 2e(i), the second sentence of Policy S/SHF4, in stating “small-to-medium scale units”, and the corresponding para 3.5.5 of the Supporting Information, are unnecessarily and overly prescriptive in relation to the type and size of units. This contradicts both the NPPF 2024 (paragraph 87b) and the draft NPPF (Policies E1.1.c.ii and E1.2) as well as the property market needs evidenced in the area (relating to both the Council’s evidence, namely GCW&ISNR, and the recent market report attached in this representation (Appendix 1)). This (at paragraphs 5.3.3 to 5.3.5) demonstrates that, in commercial property market terms, the size of any unit does not directly relate to the market it serves - i.e., local or regional needs.
In particular, as noted above, it is evident that national and international providers already have a presence in the area as well as there are local businesses that were forced to move out of the area as their growth plans and requirements for larger premises were not accommodated. These points are discussed below:
1 The latest market evidence, as presented in Appendix 1 (paragraphs 5.3.3 to 5.3.5), highlights that there is no direct correlation between the size of units and the type of occupiers or the market being served. A fixed threshold does not determine the type of occupier or the market being served.
2 There are already a number of both local and national/international companies in Greater Cambridge that occupy industrial units above 100,000 sqft. In particular:
a. Hain Daniels (also known as Hain Celestial) occupies 290,000 sqft manufacturing and food processing facility in Histon. This is an US food producer with regional facilities in various locations in the UK, including Henley-upon-Thames, Leeds and the unit in Great Cambridge, among others. As described in Appendix 1 (Table 5.1), the site was originally occupied by the Chivers family - i.e., the largest producer in the country (who began jam production in the 1870s). The operations were replaced by Premier Foods, who bought redeveloped the facilities, and then was purchased by Hain Daniels, who continue to produce jam from the site, among other products.
b. Huntsman Advanced Materials, who occupy 250,000+ sqft in Duxford is a leading global (USA interests) material solutions provider. The Duxford facility's key products and services include epoxy adhesives, methacrylate adhesives, aerospace systems, polyol systems, isocyanate adhesives, epoxy filters distributed across Europe, Africa and Middle East. There are two more facilities in the UK, in Wilton, Redcar and King's Lynn.
c. Hexcel is a leading producer of advanced structural materials, with a significant presence in the UK, particularly at its Duxford site, where they occupy a large unit of over 385,000 sqft split in various subunits. Founded in 1934, Hexcel specialises in carbon fibre reinforcements and resin systems, and is recognised as the world leader in honeycomb manufacturing for the commercial aerospace industry. The Duxford facility manufactures a wide range of products, including prepregs and adhesives, for applications in aerospace, defence, and automotive sectors.
d. Fred Smart Logistics (Appendix 1, Table 5.1) currently occupies a 120,000 sqft in Papworth Everard. The company is part of the Frederic Smart & Son Ltd which started as an agricultural products trader locally. The company initially established its presence in Whittlesford in 1919 when it bought a mill and since then it has continued to expand its operations.
e. Cambridge University Press & Assessment (Appendix 1, Table 5.1) occupies a 185,000 sq.ft warehouse built in 1990. The building is primarily in industrial use, with about 5% of the floorspace for offices. In particular, the warehouse accommodates a range of logistics activities: the printing and packaging of exam packages; the distribution of exam materials throughout the world to schools, exam centres and British Councils; and the receiving, processing and storage of exam papers.
3 In addition, it is important to highlight that compared to other locations with similar economic dynamics, such as Oxford, Sheffield, Bedford, Bristol, and Norwich (Appendix 1, Section 3.6, pg. 21-22), the presence of larger-scale industrial units is significantly higher, highlighting that their markets need this segment to function appropriately as well as indirectly implying that there is a market’s gap in the stock offer of Greater Cambridge.
4 As a result, the last eight years policy restriction, since the adoption of South Cambridgeshire LP Policy E/11 has already forced existing businesses away from Greater Cambridge due to a lack of availability of premises of sufficient scale. Examples include Marshalls and DHL (Appendix 1, paragraphs 5.1.2, 5.4.6 to 5.4.8).
Extrapolating these trends, the latent demand for larger-scale units will continue increasing, and the lack of such provision will displace investment further away and jeopardise the retention of existing businesses if they are unable to accommodate their growth plans within Greater Cambridge.
Furthermore, the Council’s evidence, namely the GCW&ISN 2025, cites the ‘Understanding demand for B8 premises across Greater Cambridge’, authored by WSP in 2021 on behalf of Greater Cambridge Partnership and the Greater Cambridge Shared Planning Service, which presents the findings of the engagement with the industry (19 interviews with stakeholders), and indicates that there is latent demand for larger scale units in the area with emphasis on the need for medium- to large-scale B8 units.
On a similar basis, the justification (at paragraph 3.5.5 of the supporting information) should also be amended to delete size-specific references and also the threshold of “less than 9,300 square metres (100,000 square feet).”
Employment Use Mix
We consider that the major employment park site allocation should not be restricted to B2/B8 uses only, given it is also suitable for E(g)(i) (Offices), E(g)(ii) (Research & Development) and E(g)(iii) (Light Industrial) employment uses. However, we concur that, as the site’s strategic location and size makes it particularly suitable to meet the very considerable need for B2 and B8 employment uses, these should be the priority. However, there is merit in accommodating other complementary employment uses, both as part of the Employment Park mix and to accommodate smaller buildings as part of the masterplanning and design process, provided these collectively comprise a small proportion of the employment park development.
On this basis, and similarly to LDL’s representation on Policy S/DS: Development strategy, we would also seek an amendment of Policy S/SHF4, as provided in Annex 1 (further below).
Policy Requirements
Draft policy S/SHF, first explains the GCLP vision, identity and uses proposed within the allocation. It then sets out a series of policy requirements. We consider all of these considerations to be appropriate but not the use of the word “must” in the preamble, without qualification, as this implies that all requirements should be treated as ‘policy absolutes’.
It is appropriate that applications are required to address each topic, but there may be good planning reasons for meeting a policy requirement differently, or other reasons to justifying departing from a particular criterion. There is also a need to assess whether harm arises from such an assessment and to consider that against the planning benefits when undertaking a ‘planning balance’ exercise.
We consider it is appropriate to address this point by amending and adding to the preamble as follows: “…must should do the following, unless justified otherwise”.
Context
We concur with paras 5–9, save for para 7 on heritage, because the Slate Hall Farm Building Heritage Appraisal Statement (RPS, January 2026) (at Appendix 3) has assessed that the Slate Hall Farm building and adjudged this to not be Non-Designated Heritage Asset.
We therefore consider para 7 should be deleted:
“7 Mitigate the impact of the development on Slate Hall Farm, a potential nondesignated heritage asset, and its setting”
Figures 106 and 108
We consider it necessary to correct or otherwise amend these two figures:
Figure 106 (Strategic Vision Area: for the Rest of Rural Area) inaccurately depicts the extent of Green Belt which runs to the boundary of the A14 and Dry Drayton Road; it does not include part of the Slate Hall Farm site allocation. The correct boundary is shown on the GCLP policies map (here) and should be amended accordingly.
Figure 108 (Spatial Framework for Policy S/SHF), whilst indicative, and should be identified as such, would benefit from greater accuracy and amendment to:
• revise the diagrammatic Retained Slate Hall Farm Non-Development Area to more closely reflect the actual location of existing development and site ownerships;
• revise the diagrammatic employment parcels to more closely reflect the location of proposed development; and
• amend the Green Infrastructure shown to more closely reflect the site’s existing vegetation cover and improved landscape strategy.
We also consider that, having identified the suitability of the principal highway access on to the A1307, it ought to indicatively reflect the two points of vehicular access that LDL propose on to the A1307, as identified on S/SHF Site Allocation: Indicative Masterplan (at Appendix 2).