Greater Cambridge Local Plan Preferred Options

Search representations

Results for Endurance Estates - Bassingbourn Sites search

New search New search

Comment

Greater Cambridge Local Plan Preferred Options

S/JH: New jobs and homes

Representation ID: 57682

Received: 11/12/2021

Respondent: Endurance Estates - Bassingbourn Sites

Agent: Carter Jonas

Representation Summary:

Summary: Land off The Causeway, Bassingbourn (HELAA site 40228) & Land off Poplar Farm Close, Bassingbourn (HELAA site 40230)

It is suggested that the emerging GCLP should have selected the higher growth level option to support economic growth, address housing affordability, and reduce in-commuting.

Full text:

OBJECT

The Greater Cambridge City Deal recognised the relationship between housing and economic growth, and that the shortage of available and affordable housing within Greater Cambridge has an impact on house prices, commuting patterns, and recruitment and retention of employees. The Cambridgeshire and Peterborough Devolution Deal committed to delivering substantial economic growth and to double economic output during the next 25 years. The 2018 Cambridgeshire and Peterborough Independent Economic Review (CPIER) identified that recent employment growth has been faster than anticipated, and the aim of doubling economic output in the area by 2040 was realistic. It was suggested in CPIER that economic growth could be achieved by attracting knowledge-intensive businesses that would not locate elsewhere in the UK, by delivering new housing, and by prioritising infrastructure projects. The National Infrastructure Commission, the Cambridge and Peterborough Combined Authority and the Greater Cambridge Greater Peterborough Enterprise Partnership acknowledge and support the economic growth potential of the Greater Cambridge area, and consider that there is a need to substantially increase housing delivery in order to support that economic growth and address the significant housing affordability issues that exist. At present there is an imbalance between rates of economic growth and housing delivery in Greater Cambridge. As set out below, the employment land evidence and emerging GCLP does not plan for sufficient economic growth.

All these factors support a significantly higher number of homes than are proposed in the preferred ‘medium plus’ growth option of Policy S/JH. It is considered that the ‘medium plus’ growth option makes insufficient upward adjustments to the housing requirement (from Section Id.2a of the Planning Practice Guidance) to take into account growth strategies, strategic infrastructure improvements and housing affordability in Greater Cambridgeshire. The ‘medium plus’ growth option also does not reflect the anticipated growth aspirations of the Oxford to Cambridge Arc Spatial Framework, or that the economic success of Greater Cambridge is of national significance.

Barton Willmore, on behalf of Endurance Estates, have assessed the preferred jobs and housing targets in Policy S/JH. Policy S/JH takes forward the ‘Central’ growth scenario, based on employment growth of 58,500 jobs 2020-2041, at an average annual growth rate of 1.1%. However, the CPIER report identified that Cambridge and South Cambridgeshire Districts experienced average annual employment growth of 2.4% and 2.3% respectively according to Office for National Statistics data, between 2010 and 2016. This approach by CPIER results in an annual employment growth rate for Cambridge which is the same as the ONS rate (2.4%), but a significantly higher rate (4.2%) is calculated for South Cambridgeshire. Barton Willmore conclude that the Councils current objectively assessed need is far below the potential growth scenarios for the area and, therefore, will need to be revised up and supported by further site allocations in the development strategy.

Therefore, the emerging GCLP should have selected a higher growth level option to support economic growth, address housing affordability, and reduce in-commuting. The higher growth level option will require infrastructure funding, but there are existing transport improvements already planned for Greater Cambridge and further investment in infrastructure (e.g. water and electricity) will need to be secured as part of the Oxford to Cambridge Arc.

Requested Change

It is requested that the housing and jobs requirements in Policy S/JH are based on delivering a higher growth level option.

Comment

Greater Cambridge Local Plan Preferred Options

S/DS: Development strategy

Representation ID: 57684

Received: 11/12/2021

Respondent: Endurance Estates - Bassingbourn Sites

Agent: Carter Jonas

Representation Summary:

Land off Poplar Farm Close Bassingbourn (HELAA Site 40230)
Land off The Causeway Bassingbourn (HELAA Site 40228)
Land off Elbourn Way Bassingbourn (HELAA Site 40227)

Additional sites that are capable of providing policy compliant levels of affordable housing need to be identified in the development strategy, including small and medium sites in the villages, in order to address the under-delivery of affordable housing from Northstowe, Waterbeach, Cambourne West, North East Cambridge and Cambridge East.

Small scale housing allocations should be made in the more sustainable villages in the rural area on the edge of Cambridge including Bassingbourn, because it is accessible by sustainable modes of transport, there is a need to support the existing services and facilities within the village, and there is an identified need for affordable housing in the village.

Land off Poplar Farm Close, off The Causeway, and off Elbourn Way in Bassingbourn should be released from the Green Belt and allocated for residential development.

Full text:

OBJECT

Endurance Estates is promoting three sites in Bassingbourn for residential development (off Poplar Farm Close, off The Causeway and off Elbourn Way), and in representations has requested that these sites are allocated in emerging GCLP. These representations to Policy S/DS are focussed on the preferred development strategy for the rest of the rural area, and specifically the decision to allocate a very limited amount of development to the more sustainable villages.

The overall development strategy is very reliant on the delivery of an extension to an existing new settlement (Cambourne West + an additional 1,950 dwellings at Cambourne), planned new settlements (Northstowe, Waterbeach and Bourn Airfield) and new communities on the edge of Cambridge (North East Cambridge and Cambridge East). It is acknowledged that the principle of development at most of these strategic sites is already established through adopted development plan documents; the additional dwellings at Cambourne is proposed through emerging GCLP and associated with East West Rail. However, it is considered that there are a number of risks associated with the preferred development strategy, which relate to housing delivery rates and whether these can be increased at some new settlements, the relocation of existing uses from some sites, and the delivery of affordable housing.

There is monitoring data, evidence from other examinations, and national research (see Start to Finish Report and updates by Lichfields for example) that provides information on housing delivery rates. The most recent housing trajectory for Greater Cambridge (published April 2021) already predict high average annual housing delivery rates for the new settlements; Northstowe and Waterbeach are predicted to deliver 250 dwellings per annum, and Cambourne West and Bourne Airfield are predicted to deliver a combined total of 300 dwellings per annum. According to monitoring data Cambourne has historically delivered approximately 230 dwellings per annum. Hampton (in Peterborough) has historically delivered 259 dwellings per annum. Cranbrook (in East Devon) which has the highest annual delivery rate of current new settlements is delivering at approx. 295 dwellings per annum. The Inspector for the Huntingdonshire Local Plan recommended that the combined housing delivery rates Alconbury Weald (the former Alconbury Airfield and Grange Farm) should be no higher than 300 dwellings per annum, and for St Neots East (Loves Farm and Wintringham Park) should be no higher than 200 dwellings per annum. The predicted average housing delivery rates at Northstowe, Waterbeach and Cambourne West/Bourn Airfield already appear to be at levels comparable to or higher than other new settlements elsewhere. Based on the evidence and examples set out above, it is clear that current predicted delivery rates are already optimistic, but there is no credible evidence that faster housing delivery rates can be achieved at Northstowe or Waterbeach (i.e. what site-specific circumstances are present on these sites that mean they will deliver an above-average number of dwellings a year, consistently over a prolonged period of time. It is noted that Cambourne, Hampton and Cranbrook all had multiple housebuilders on site at the same time and delivered affordable and market housing in conjunction with one another. It is requested that predicted housing delivery rates for the new settlements take into account the above comments, and the assumption that faster housing delivery rates can be achieved at Northstowe and Waterbeach should be deleted from the development strategy.

North East Cambridge and Cambridge East are allocated in both Local Plans as strategic sites. It is acknowledged that these sites involve the re-use of previously developed land. However, the redevelopment of these sites is complex and involves the relocation of the existing uses; the relocation of a sewage treatment works and existing businesses in the case of North East Cambridge, and the relocation of airport related uses and businesses in the case of Cambridge East. It is considered that the delivery of development at these sites will need to be realistic, taking into account all of the challenges that need to be overcome prior to the commencement of development. It is requested that realistic assumptions about delivery are applied for North East Cambridge and Cambridge East.

It is noted that most of the new settlements will deliver less affordable housing than the statutory policy requirement of 40%, mainly because of the need for these developments to also deliver significant levels of new transport and community infrastructure in initial phases. The affordable housing contributions that have come forward on major strategic sites to date are as follows: 20% at Northstowe (Phases 1 & 2), 30% at Waterbeach, 30% at Cambridge East (Wing), 30% at Cambourne West and 40% at Bourn Airfield, although all are subject to a review mechanism that could result in adjustments to the level of affordable housing. The proportion of affordable housing that will be provided from the developments at North East Cambridge and Cambridge East are unknown at this stage, but because of the costs associated with the relocation of existing uses and the delivery of new transport infrastructure it is very unlikely that 40% affordable housing will be provided at least in the initial phases. It is clear that the existing and planned new settlements and new communities in the edge of Cambridge are not and will not provide enough affordable housing, which should be a concern in an area such as Greater Cambridge which has significant housing affordability issues. It is requested that, in order to address the under-delivery of affordable housing from Northstowe, Waterbeach, Cambourne West, North East Cambridge and Cambridge East, the development strategy should allocate additional sites that are capable of providing policy compliant levels of affordable housing including small and medium sites in the villages.

The preferred development strategy for the rest of the rural area is based on the assumption that the villages in this area are unsustainable because existing and future residents would need to travel by car to access services and facilities and employment opportunities. It should be noted that the three objectives of sustainable development – environmental, economic and social – are interdependent and one objective is not more important than the others. It is considered that the assumption about unsustainable travel is incorrect for some villages, including Bassingbourn which contain a range of services and facilities, are in close proximity to other centres and employment opportunities, and are accessible by sustainable modes of transport and the bus services are due to be improved. In addition, the preferred development strategy for the rest of the rural area provides no support for existing services and facilities in villages and provides no strategy to meet current identified affordable housing needs of villages. Endurance Estates are not advocating a dispersed development strategy whereby most development is directed to the villages, but is requesting that a sufficient amount of land is allocated at the more sustainable villages to support services and opportunities are identified to make villages more sustainable through the delivery of housing development and services/ facilities alongside, to ensure that identified affordable housing needs are met.

There are three paragraphs in the NPPF that suggest a different approach is required in the development strategy for the rest of the rural area. Paragraph 105 seeks to ensure that development is located where the need to travel will be minimised and the use of sustainable transport modes can be maximised, but acknowledges that the opportunities will be different in urban and rural areas. Paragraph 79 seeks to promote sustainable development in rural areas by locating housing where it will enhance or maintain the vitality of rural communities and enable villages to grow and thrive. Paragraph 62 expects the size, type and tenure of housing needs of the community to be assessed and reflected in planning policies, including for example those with an affordable housing need, students, renters and self-builders.

Bassingbourn is identified as a Minor Rural Centre in the defined settlement hierarchy for South Cambridgeshire. It contains a good range of services and facilities, including a secondary school (Bassingbourn Village College), primary school (Bassingbourn Primary School), convenience store, post office, doctor's surgery, dentist, pharmacy, public houses, mobile library, sports centre, and outdoor recreation areas. Bassingbourn is on existing bus routes, with regular services to Royston and a less frequent service to Cambridge. It noted that the Greater Cambridge Partnership’s Making Connections project proposes a more frequent rural bus service for Bassingbourn, with better bus connections to the railway stations at Royston, Meldreth and to the proposed travel hub at Foxton. Therefore, Bassingbourn would in the future be better served by public transport, with bus services connecting the village to train stations, and providing residents with realistic alternatives to the car for some journeys including for access to employment opportunities.

South Cambridgeshire District Council's 'Housing Statistical Information Leaflet' (December 2019) identified a need for 65 affordable dwellings in Bassingbourn for those with a local connection to the village – see https://www.scambs.gov.uk/media/18316/affordable-housing-housing-statistical-information-leaflet-december-2019.pdf. This identified need would not be met without allocations in Bassingbourn. It is noted that there is no neighbourhood plan being prepared for the village, no community land trust, and rural housing exception schemes are typically very small and are reliant on a landowner willing to offer land up at existing use value. The promoted developments by Endurance Estates in Bassingbourn would include housing and affordable housing to meet local needs of the village.

For all these reasons, small scale housing allocations should be made in the more sustainable villages within the rest of the rural area, because those villages are accessible by sustainable modes of transport, there is a need to support the existing services and facilities within those villages, and there is an identified need for affordable housing in those villages which would not be met via other means.

Requested Change

The following changes are requested to Policy S/DS: Development Strategy:

It is requested that predicted housing delivery rates for the new settlements take into account the evidence from similar development elsewhere.

It is requested that the assumptions about faster housing delivery rates for Northstowe and Waterbeach are deleted from the development strategy.

It is requested that realistic assumptions about delivery, including for affordable housing, are applied for North East Cambridge and Cambridge East.

It is requested that additional sites that are capable of providing policy compliant levels of affordable housing are identified in the development strategy, including small and medium sites in the villages, in order to address the under-delivery of affordable housing from Northstowe, Waterbeach, Cambourne West, North East Cambridge and Cambridge East.

It is requested that small scale housing allocations should be made in the more sustainable villages within the rest of the rural area, including Bassingbourn, because those villages are accessible by sustainable modes of transport, there is a need to support the existing services and facilities within those villages, and there is an identified need for affordable housing in those villages.

As requested in the Endurance Estates representations to Section 2.6: Rest of Rural Area, the land off Poplar Farm Close, off The Causeway, and off Elbourn Way in Bassingbourn should be allocated in emerging GCLP for residential development.

Comment

Greater Cambridge Local Plan Preferred Options

S/SH: Settlement hierarchy

Representation ID: 57685

Received: 11/12/2021

Respondent: Endurance Estates - Bassingbourn Sites

Agent: Carter Jonas

Representation Summary:

Land off The Causeway, Bassingbourn (HELAA site 40228) & Land off Poplar Farm Close, Bassingbourn (HELAA site 40230)

A capacity assessment should be undertaken of all villages in South Cambridgeshire to determine which potential housing sites might be deliverable or developable during the plan period to 2041, and the number of dwellings that might be delivered from each of those sites.

It is requested that the site size limits for each category of village are deleted and replaced with a general policy that supports development within existing settlement boundaries, in conjunction with a revised development strategy that allocates suitable sites on the edge of existing villages to ensure affordable housing needs are met including at Bassingbourn.

Full text:

OBJECT

Endurance Estates is promoting three sites in Bassingbourn for residential development, and in representations has requested that these sites are allocated in emerging GCLP. Bassingbourn is defined as a Minor Rural Centre in the settlement hierarchy for South Cambridgeshire, and Endurance Estates agree with the status of the village.

As set out in the representations to Policy S/SB: Settlement Boundaries, it is considered that there is limited capacity within the settlement boundaries of most villages. There are few outstanding development opportunities for up to 30 dwellings within existing settlement boundaries in Group Villages, and Bassingbourn is an example where there are no opportunities within the boundary for sites of major developments of between 10 and 30 dwellings or more. It is likely that in most cases only small sites for one or two dwellings would be available. This outcome constrains the growth of villages and their ability to meet local housing needs and support existing services and facilities. It is considered that the site size thresholds for each category of village are largely irrelevant and ineffective because very few sites are actually available, and those that are available would fall below the threshold where affordable housing is required e.g. less than 10 dwellings.

Requested Change

It is requested that a capacity assessment is undertaken of all villages in South Cambridgeshire to determine which potential housing sites might be deliverable or developable during the plan period to 2041, and the number of dwellings that might be delivered from each of those sites.

It is requested that the site size limits for each category of village are deleted and replaced with a general policy that supports development within existing settlement boundaries, in conjunction with a revised development strategy that allocates suitable sites on the edge of existing sustainable villages including at Bassingbourn.

Comment

Greater Cambridge Local Plan Preferred Options

S/SB: Settlement boundaries

Representation ID: 57688

Received: 11/12/2021

Respondent: Endurance Estates - Bassingbourn Sites

Agent: Carter Jonas

Representation Summary:

Land off Poplar Farm Close Bassingbourn (HELAA Site 40230)
Land off The Causeway Bassingbourn (HELAA Site 40228)
Land off Elbourn Way Bassingbourn (HELAA Site 40227)
A capacity assessment is required for all villages in South Cambridgeshire to determine which potential housing sites might be deliverable or developable during the plan period to 2041 and the number of dwellings that might be delivered from each of those sites.

If the capacity assessment identifies no suitable sites to meet identified affordable housing needs, it is requested that additional allocations are made on the edge of those villages to deliver sufficient housing to meet the affordable housing need.

Full text:

OBJECT

Endurance Estates does not object to the principle of settlement boundaries being defined around villages. However, the existing defined settlement boundaries for most villages in South Cambridgeshire have remained largely unchanged since the Local Plan 2004. The settlement boundaries were adjusted in some cases to take into account allocations at some villages through the Site Specific Allocations DPD 2010 and the South Cambridgeshire Local Plan 2018. It is very likely that most of the development opportunities within existing village boundaries would have been taken up by now. It is also likely that heritage assets within some villages, such as conservation areas and listed buildings, will constrain development opportunities.

The Councils have not undertaken an assessment of capacity within the existing settlement boundaries of villages to accommodate additional development. It is likely that such an assessment would demonstrate that the capacity is limited.

It is considered that the emerging GCLP should seek to allocate suitable sites on the edge of existing sustainable villages and to adjust the settlement boundary to accommodate those allocations. The three sites promoted by Endurance Estates in Bassingbourn are all located immediately adjacent to the settlement boundary for the village, are suitable and available for housing, and should be allocated for development. There is a need for additional housing sites in the more sustainable villages, including Bassingbourn, to support existing services and facilities and to meet identified affordable housing needs in those villages.

Requested Change
It is requested that a capacity assessment is undertaken of all villages in South Cambridgeshire to determine which potential housing sites might be deliverable or developable during the plan period to 2041 and the number of dwellings that might be delivered from each of those sites.

If the capacity assessment identifies no suitable sites to meet identified affordable housing needs it is requested that additional allocations are made on the edge of those villages to deliver sufficient housing to meet those affordable housing needs.

Comment

Greater Cambridge Local Plan Preferred Options

S/RRA: Allocations in the rest of the rural area

Representation ID: 57692

Received: 11/12/2021

Respondent: Endurance Estates - Bassingbourn Sites

Agent: Carter Jonas

Representation Summary:

Land off Poplar Farm Close Bassingbourn (HELAA Site 40230)
Land off The Causeway Bassingbourn (HELAA Site 40228)
Land off Elbourn Way Bassingbourn (HELAA Site 40227)

It is considered that the growth of the more sustainable villages must be part of the development strategy for emerging GCLP, and particularly those villages that contain a very good range of services and facilities, are accessible by a range of modes of transport, and where there is an identified need for affordable housing for those with a local connection to the village.

It is requested that the development strategy for the rest of the rural area includes additional allocations in Bassingbourn.

Full text:

OBJECT

It is considered that the growth of the more sustainable villages must be part of the development strategy for emerging GCLP, and particularly those villages that contain a good range of services and facilities, are accessible by a range of modes of transport, and where there is an identified need for affordable housing for those with a local connection to the village.

Paragraph 79 of the NPPF seeks to promote sustainable development in rural areas and acknowledges that housing can enhance or maintain the vitality of rural communities and support local services. The three promoted developments by Endurance Estates in Bassingbourn would support the existing services and facilities in the village, including the schools, convenience store, post office, doctor's surgery, dentist, pharmacy, public houses, mobile library, sports centre, and existing and future bus services.

Paragraph 69 acknowledges the role that small and medium sized sites can make towards meeting the housing requirements, and that such sites are often built-out relatively quickly. Small and medium sized sites typically only require limited new physical infrastructure and amendments to the access arrangements. The housing monitoring data from Cambridge and South Cambridgeshire confirms that small and medium sites are delivered quickly i.e. within two to three years. It is considered that small and medium sized sites make a significant contribution towards the short term housing land supply and the five year housing land supply position in Greater Cambridgeshire. It is requested that small/medium sized sites, including those promoted by Endurance Estates at land off Poplar Farm Close, off The Causeway and off Elbourn Way in Bassingbourn, are allocated to meet the requirement for a mix of sites including those that are easily deliverable.

Paragraph 104 of the NPPF expects transport issues to be considered at the earliest stages of plan-making. Those issues include opportunities created by existing or proposed transport infrastructure in terms of the scale, location and density of development, and opportunities to promote walking, cycling and public transport use. Paragraph 105 expects significant development to be focused on locations which are or can be made sustainable. The very good range of services and facilities within Bassingbourn are all accessible by walking and cycling. Bassingbourn is on existing bus routes, with regular services to Royston and a limited service to Cambridge. The Greater Cambridge Partnership’s Making Connections project proposes a more frequent rural bus service for Bassingbourn, with better bus connections to the railway stations at Royston, Meldreth and to the proposed travel hub at Foxton. Bassingbourn will in the future be better served by public transport, with bus services connecting the village to train stations, and providing residents with realistic alternatives to the car for some journeys including for access to employment opportunities. It would be consistent with national guidance in terms of sustainable transport to direct additional development to Bassingbourn.

Paragraph 62 of the NPPF expects the size, type and tenure of housing needs of the community to be assessed and reflected in planning policies, including for example those with an affordable housing need, students, renters and self-builders. South Cambridgeshire District Council's 'Housing Statistical Information Leaflet' (December 2019) identified a need for 65 affordable dwellings in Bassingbourn for those with a local connection to the village. This identified need would not be met without allocations in the village. The three promoted developments by Endurance Estates in Bassingbourn would include housing and affordable housing to meet local needs of the village.

For all these reasons, small and medium scale housing allocations should be made in the more sustainable villages within the rest of the rural area, including Bassingbourn, because those villages are accessible by sustainable modes of transport, there is a need to support the existing services and facilities within those villages, and there is an identified need for affordable housing in those villages which would not be met via other means.

Endurance Estates promoted three sites in Bassingbourn as potential allocations in emerging GCLP that were assessed in the HELAA, and are as follows: land off Poplar Farm Close (Site Ref. 40230); land off The Causeway (Site Ref. 40228); and, land off Elbourn Way (Site Ref. 40227). The representations to the assessments in the HELAA comment on the potential constraints identified with the promoted developments and explain how those constraints would be addressed. As set out in the call for site submissions and the supporting technical work for the sites, there are no significant constraints at the three promoted developments by Endurance Estates in Bassingbourn. For example, none of the sites are in the Green Belt. There are heritage assets in Bassingbourn and adjacent to some of the promoted sites, but the initial heritage assessments for the sites demonstrate that there are no constraints to the promoted developments and mitigation measures including appropriate design and layout are possible. The proposed dwellings would be located on those parts of the site which are not subject to flood risk. The trees and hedgerows on the sites would be retained. A vehicular and pedestrian access can be provided at all of the promoted developments. The promoted developments would include biodiversity enhancement measures.

For all these reasons it is requested that the following sites promoted by Endurance Estates in Bassingbourn are allocated for residential development in emerging GCLP:

• land off Poplar Farm Close – for approximately 7 self/custom build dwellings;
• land off Elbourn Way – for between 65 and 80 dwellings; and,
• land off The Causeway – for approximately 80 dwellings.
The call for sites submissions were accompanied by Vision Documents (prepared by Nicholas Jacob Architects) which included an Indicative Masteplan Concept Plan for the promoted developments. The Vision Document could form the basis for the site allocations.

Requested Change

It is requested that the development strategy for the rest of the rural area includes additional allocations in Bassingbourn.

It is requested that land off Poplar Farm Close is allocated with the following policy requirements:

• Site Area of 0.37 Ha
• Capacity for 7 self/custom build dwellings
• Delivery of open space and landscaping
• Main access from Poplar Farm Close
• New pedestrian access from Brook Road
• Improvements to footway on Brook Road
• Development should address the following constraints:
o Retain and enhance existing trees and hedgerows at site
o Design and layout to preserve setting of Poplar Farmhouse (Grade II Listed Building) and the location of the site within Bassingbourn Conservation Area.
o Upgrade existing access from Poplar Farm Close by extending existing turning head to provide a shared use access road.

It is requested that land off The Causeway is allocated with the following policy requirements:

• Site Area of 4.46 Ha
• Capacity for approx. 80 dwellings, including affordable housing
• Open space corridor through the site providing views to the surrounding countryside
• Vehicular access from The Causeway
• New pedestrian footways on south side of The Causeway
• Retain link to footpath network
• New pedestrian crossing on The Causeway
• Development should address the following constraints:
o Landscaping at southern boundary
o Design and layout to preserve setting of Listed Buildings on north side of The Causeway

It is requested that land off Elbourn Way is allocated with the following policy requirements:

• Site Area of 6.19 Ha
• Capacity for up to 80 dwellings, including affordable housing
• Delivery of open space and green infrastructure
• Upgrade existing allotments including the installation of a water supply, improved facilities, a new vehicular access and car parking area
• Improve woodland areas within the site
• Retain, manage and enhance land containing ecological interest within the site
• New access from Elbourn Way
• Emergency access from existing access via North End
• Retain and enhance existing footpath network through site
• Development should address the following constraints:
o Landscaping at eastern boundary
o Design and layout to preserve setting of Church of St Peter and St Paul (Grade I), Manor Farmhouse (Grade II) and Church Farmhouse (Grade II) and Bassingbourn Conservation Area

Comment

Greater Cambridge Local Plan Preferred Options

Sustainability Appraisal

Representation ID: 57694

Received: 11/12/2021

Respondent: Endurance Estates - Bassingbourn Sites

Agent: Carter Jonas

Representation Summary:

It is considered that the Sustainability Appraisal has not sought to make the emerging GCLP more sustainable, and in respect of villages it appears that the assessment against sustainability objectives is not robust because it does not critically review the evidence provided by the Councils. For example, some villages have good access by sustainable modes of transport and contain a good range of services and facilities, there is an identified need for affordable housing in most villages which is ignored in the assessment process, and there is limited capacity within existing settlement boundaries for villages to accommodate additional development.

Full text:

Sustainability Appraisal

A key aim of the Sustainability Appraisal process is to make a plan more sustainable. It tests the social, economic and environmental impacts of various plan options, to help choose the most sustainable options. It also seeks to determine the extent to which the principles of sustainable development are integrated into the plan and its policies.

It is considered by Endurance Estates that the Sustainability Appraisal has not sought to make emerging GCLP more sustainable, and in respect of villages it appears that the assessment against sustainability objectives is not robust because it does not critically review the evidence provided by the Councils. For example, some villages have good access by sustainable modes of transport and contain a good range of services and facilities, there is an identified need for affordable housing in most villages which is ignored in the assessment process, and there is limited capacity within existing settlement boundaries for villages to accommodate additional development.

The sustainability objectives that are relevant to Endurance Estates’ representations are: SA1 Housing; and, SA2 Access to Services and Facilities.

The Endurance Estates representations and requested amendment to the assessment of policy options in the Sustainability Appraisal are as follows:

• Table 5.4: Policy S/DS: Development Strategy: A ‘significant positive effect/uncertain’ score is identified in the assessment for the housing sustainability objective (SA1). However, as set out in the Endurance Estates representations to Policy S/DS, there are no housing allocations made in most villages, including Bassingbourn, and as such the identified needs for affordable housing in the villages would not be met by the preferred development strategy. South Cambridgeshire District Council's 'Housing Statistical Information Leaflet' (December 2019) identified affordable housing needs for those with a local connection in all villages – see https://www.scambs.gov.uk/media/18316/affordable-housing-housing-statistical-information-leaflet-december-2019.pdf. That information is not reflected in the assessment contained in Table 5.4. The identified need for 65 affordable dwellings in Bassingbourn will not be met by the preferred development strategy, which must be a negative outcome for the housing related sustainability objective. Endurance Estates has requested that land off Poplar Farm Close, land of The Causeway and land off Elbourn Way are allocated for housing and affordable housing to deliver positive housing related sustainability outcomes.

• Table 5.6: Policy S/SB: Settlement Boundaries. A ‘mixed significant positive and minor negative effect’ score is identified for the housing sustainability objective (SA1). As set out in Endurance Estates’ representations to Policy S/SB and S/SH (Settlement Hierarchy) the settlement boundaries at most villages have remained largely unchanged since 2004 and there has been no assessment of capacity within settlement boundaries to accommodate additional development. The assessment in Table 5.6 does not consider whether any capacity exists within the settlement boundaries to accommodate the identified needs for affordable housing. Bassingbourn is an example where there are no opportunities within the boundary to accommodate major developments that would require affordable housing i.e. 10 or more dwellings. As set out above there is an identified need for 65 affordable dwellings in Bassingbourn. It must be a negative outcome for the housing related sustainability objective if affordable housing needs of villages, including Bassingbourn, will not be met by the currently defined settlement boundaries.

• Table 5.22: Policy S/RRA: Allocations in the Rest of the Rural Area: A ‘mixed significant positive and minor negative effect’ score is identified for the housing sustainability objective (SA1). A ‘mixed significant negative and minor positive effect’ score is identified for access to services and facilities objective (SA2). As set out above there is an identified need for 65 affordable dwellings in Bassingbourn, and it must be a negative outcome for the housing related sustainability objective if affordable housing needs of villages, including Bassingbourn, will not be met by the development strategy or the strategy for rural areas. Bassingbourn contains a good range of services and facilities, including a secondary school, primary school, convenience store, post office, doctor's surgery, dentist, pharmacy, public houses, mobile library, sports centre, and outdoor recreation areas. The accessibility to services and facilities is good for Bassingbourn, and the Greater Cambridge Partnership’s Making Connections proposes improvements to bus services, but these factors are not reflected in the assessment for this sustainability related objective, and additional development in this village would improve the sustainability outcomes and support the existing services and facilities.

it is requested that land off Poplar Farm Close, land off The Causeway and land off Elbourn Way are allocated in emerging GCLP to deliver better and more positive sustainability outcomes compared with the preferred development strategy.