Greater Cambridge Local Plan Preferred Options

Search representations

Results for Endurance Estates search

New search New search

Comment

Greater Cambridge Local Plan Preferred Options

WS/HD: Creating healthy new developments

Representation ID: 59158

Received: 13/12/2021

Respondent: Endurance Estates

Agent: Cheffins

Representation Summary:

Health Impact Assessments should be a requirement for major developments only. For minor developments, this information should be optional or simplified, for example through the use of a short questionnaire (similar to the Cambridgeshire Biodiversity Checklist).

Comment

Greater Cambridge Local Plan Preferred Options

GP/PP: People and place responsive design

Representation ID: 59172

Received: 13/12/2021

Respondent: Endurance Estates

Agent: Cheffins

Representation Summary:

It is accepted that good design is highly subjective, yet, the planning system has allowed the steady homogenisation of built environments, with a dominance of bland, monotonous “identikit” housing estates from major housebuilders.

Additional measures should be introduced for strategic scale development to avoid monotony. However, design guides/codes should not be imposed on smaller scale developments where other mechanisms, including parameter plans, can adequately achieve similar and proportionate outcomes.

Comment

Greater Cambridge Local Plan Preferred Options

H/AH: Affordable housing

Representation ID: 59191

Received: 13/12/2021

Respondent: Endurance Estates

Agent: Cheffins

Representation Summary:

Recent analyses of local property market dynamics indicate that affordable housing demands are still a focal concern for local authorities across the Greater Cambridge area. Dependence on the allocation of strategic sites with already high infrastructure burdens is unlikely to offer sustainable, long-term solutions to the chronic and worsening affordability issues being experienced across the Greater Cambridge area. Strategic sites alone do not deliver policy-compliant levels of affordable housing, so, if this is the target, more smaller sites in sustainable settlements (e.g. Linton) that are more likely to deliver affordable homes at a faster rate need to be allocated.

Comment

Greater Cambridge Local Plan Preferred Options

H/CB: Self and custom build homes

Representation ID: 59204

Received: 13/12/2021

Respondent: Endurance Estates

Agent: Cheffins

Representation Summary:

A more focused policy, perhaps split across the two administrative areas, would encourage the development of self-build plots in the right locations to meet local demand. It would be illogical for the current registers to be combined since many prospective self-builders will have preferred locations and few will have a search area as wide as the Greater Cambridge area.

Furthermore, close monitoring on sales and completions of self- and custom-build plots will be needed in case plots earmarked self- or custom-build revert to market dwellings.

Comment

Greater Cambridge Local Plan Preferred Options

S/JH: New jobs and homes

Representation ID: 59241

Received: 13/12/2021

Respondent: Endurance Estates

Agent: Cheffins

Representation Summary:

The First Proposals draft Plan is established on the Councils’ medium+ growth scenario. However, employment growth rate in the Greater Cambridge Area is above the national average.

The employment and housing growth figures for the Local Plan through to 2041 should be revised upwards substantially, in order to accommodate the demonstrable growth potential of the Districts.

Further evidence can be found in the attached representation by Barton Willmore.

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

S/SB: Settlement boundaries

Representation ID: 59265

Received: 13/12/2021

Respondent: Endurance Estates

Agent: Cheffins

Representation Summary:

Land east of Gazelle Way and west of Teversham Road, Teversham (HELAA site 40250)

The overall development strategy is heavily reliant on the delivery of an extension to an existing new settlement, planned new settlements and new communities on the edge of Cambridge. This strategy, coupled with the application of tightly drawn settlement boundaries, is likely to impose significant challenges for the affordability and social sustainability of localities across the Greater Cambridge Area. To discourage the development of less suitable sites and assist in the delivery of much-needed affordable housing, the most logical approach is to allocate further sites on the edge of sustainable settlements such as Teversham.

Comment

Greater Cambridge Local Plan Preferred Options

GP/GB: Protection and enhancement of the Cambridge green belt

Representation ID: 59292

Received: 13/12/2021

Respondent: Endurance Estates

Agent: Cheffins

Representation Summary:

The review of the Green Belt is welcomed as there is a compelling need for Greater Cambridge to release some land from the Green Belt to provide the opportunity for sustainable development. However, the results from the 2021 Green Belt Assessment provide significantly different assessments of multiple land parcels compared to that of the Council’s previous evidence in 2012.

Further clarification is needed regarding blanket statements and changes in classification the Councils has forwarded about land parcels within the Green Belt.

Comment

Greater Cambridge Local Plan Preferred Options

S/JH: New jobs and homes

Representation ID: 59737

Received: 13/12/2021

Respondent: Endurance Estates

Agent: DLP Planning Ltd

Representation Summary:

In terms of residential and employment commitments, the new Local Plan should seek to meet the full, unconstrained objectively assessed needs for market and affordable housing, as well as the assessed needs for jobs.
Whilst an uplift has been applied to the Standard Method, this falls short of maximising the economic potential of the ‘Plan Area’ and the provision of housing in accordance with higher forecasts for jobs growth. The higher growth scenarios provide a true reflection of the actual demand for housing.
The Council is only proposing a limited number of new allocations at urban extensions and new settlements and is seeking to realise additional capacity from existing allocated and committed sites. In practice, the risks to delivery mean that the Council’s stated provision is unlikely to be achieved within the plan period.

Comment

Greater Cambridge Local Plan Preferred Options

S/JH: New jobs and homes

Representation ID: 59738

Received: 13/12/2021

Respondent: Endurance Estates

Agent: DLP Planning Ltd

Representation Summary:

The First Proposals as a whole fail to set a figure for the number of specialist housing for older people needed across the plan area. Consideration must be given to specifying the number of homes to be provided for and then how these will be delivered. Risks to delivery of the overall strategy mean operators within the specialist older persons housing sector will face the most extreme pressures of competition in securing development opportunities.
Greater certainty and flexibility would be achieved through the allocation of specific sites to meet the needs for specialist housing for older people. Addressing this issue is central to satisfying NPPF Paragraph 60.

Comment

Greater Cambridge Local Plan Preferred Options

S/DS: Development strategy

Representation ID: 59740

Received: 13/12/2021

Respondent: Endurance Estates

Agent: DLP Planning Ltd

Representation Summary:

Further consideration of sites suitable for specialist housing for older people (including Extra Care development) in sustainable locations should be undertaken. There are opportunities to deliver Integrated Retirement Communities in sustainable locations which will also serve to support rural services, improve the vitality and viability of villages, whilst also enhancing local amenities including healthcare.
The proposed development strategy will not support the existing villages and will not deliver the type of housing required to meet the housing needs of different groups (including older people) and needs of local communities in these locations.
The proposed development strategy needs to take into consideration the needs of older people, including the allowance of choice, and the approach currently advocated will not support the varying models available to provide Extra Care housing and retirement communities.
The characteristics of Integrated Retirement Communities can contribute towards mixed and balanced communities and sustainable growth in rural areas.

For instructions on how to use the system and make comments, please see our help guide.