Greater Cambridge Local Plan Preferred Options

Search representations

Results for Cambridge Doughnut Economics Action Group search

New search New search

Comment

Greater Cambridge Local Plan Preferred Options

How much development and where?

Representation ID: 57767

Received: 11/12/2021

Respondent: Cambridge Doughnut Economics Action Group

Representation Summary:

The jobs are being imposed on the citizens of Cambridge, not needed by them. The inflow of jobs to the area is already causing significant infrastructural and social strain.
Endless growth is of course not theoretically possible in a physical world of limited resources. There are always factors which increasingly make further growth more unattractive, costly, and dangerous to the entities living in the growth system. What models does the Planning Service have to determine likely limits to growth of the Cambridge economy?

Comment

Greater Cambridge Local Plan Preferred Options

S/JH: New jobs and homes

Representation ID: 57785

Received: 11/12/2021

Respondent: Cambridge Doughnut Economics Action Group

Representation Summary:

The additional jobs, to be supported by housing, is not necessary: unemployment here is very low. It is being forced on the area by external actors, including international investors. Cambridge is being exploited for financial gain. Building more homes in an overheated area will only make housing pressure and unaffordability worse: as it has done consistently.

Comment

Greater Cambridge Local Plan Preferred Options

The edge of Cambridge

Representation ID: 57981

Received: 12/12/2021

Respondent: Cambridge Doughnut Economics Action Group

Representation Summary:

There is no limit in the plan on individual scheme sizes on the edge of town. The plan should set out more clearly the requirements on developers to provide better space access and community area.

Comment

Greater Cambridge Local Plan Preferred Options

Climate change

Representation ID: 57983

Received: 12/12/2021

Respondent: Cambridge Doughnut Economics Action Group

Representation Summary:

To achieve net zero and still grow the economy we would need to decouple emission quantities completely from growth, not just reduce or mitigate them. Several economic projections including one by the UN Environment Programme indicate that such “ absolute decoupling” cannot occur and “green growth” is simply not possible in practice. https://foreignpolicy.com/2018/09/12/why-growth-cant-be-green/

In order to “help”, the plan must demonstrate how it will reduce the emissions in Cambridge by more than 4% per capita per year. Otherwise the plan will simply “make it marginally less hard than it might otherwise be for Greater Cambridge to reach net zero”

Comment

Greater Cambridge Local Plan Preferred Options

CC/NZ: Net zero carbon new buildings

Representation ID: 57986

Received: 12/12/2021

Respondent: Cambridge Doughnut Economics Action Group

Representation Summary:

It seems unlikely that the developments can generate enough renewable energy to meet their needs at the required standards. For residential buildings alone, at a conservative average of 50m2 per home, 49,000 homes using 35kWhr/year will need 85 Gigawatt hours per year of new generation capacity paid for within the homes price; far beyond developers construction capabilities, eg. wind turbine farms.
If via photovoltaics, this too seems unlikely. An average home of 50m2 would need 1750 kWhr/year. At typical solar efficiencies this would require 17m2 of solar panels, which is all of the South-facing roof capacity, for every single house.


Comment

Greater Cambridge Local Plan Preferred Options

CC/WE: Water efficiency in new developments

Representation ID: 57987

Received: 12/12/2021

Respondent: Cambridge Doughnut Economics Action Group

Representation Summary:

The policy only sets a water standard per home. This will limit the overall increase in water demand, but the Cambridge area is already in severe water stress. The policy should include a limit based on the absolute water stress of the Cambridge area. If this is intended to be set as a criterion for continued development, this criterion should be included explicitly within this part of the document. Otherwise a developer can claim they have met the standard per home, and that aggregate regional demand is “not their problem”.

Comment

Greater Cambridge Local Plan Preferred Options

CC/DC: Designing for a changing climate

Representation ID: 57989

Received: 12/12/2021

Respondent: Cambridge Doughnut Economics Action Group

Representation Summary:

The policy does not set any limits for how many homes need to be passively designed and built, just a priority ordering, which will be left up to the developer to choose from with no clear goals to reach.

Comment

Greater Cambridge Local Plan Preferred Options

CC/FM: Flooding and integrated water management

Representation ID: 57991

Received: 12/12/2021

Respondent: Cambridge Doughnut Economics Action Group

Representation Summary:

The whole plan is proposed despite the knowledge that in the short-, medium-, and long-term ongoing growth will cause further disruption to the chalk aquifer and habitats on which we all depend. Until an approach to dealing with this is found, a massive development on this scale cannot take place without inevitable and irreversible damage to the water ecosystem.

Comment

Greater Cambridge Local Plan Preferred Options

CC/RE: Renewable energy projects and infrastructure

Representation ID: 57992

Received: 12/12/2021

Respondent: Cambridge Doughnut Economics Action Group

Representation Summary:

As stated in the section on net zero carbon new buildings, the renewable infrastructure needed will need to be large to meet the housing demand, let alone for the infrastructure. A very clear and integrated plan will be needed, rather than leaving it up to individual developers.

Comment

Greater Cambridge Local Plan Preferred Options

CC/CE: Reducing waste and supporting the circular economy

Representation ID: 57993

Received: 12/12/2021

Respondent: Cambridge Doughnut Economics Action Group

Representation Summary:

There is no absolute standard for achieved performance of the developments. Given that developers are prone to create credible-looking “plans” and then depart from them in practice, we would like to see absolute metrics of waste and circularity applied to new developments.

For instructions on how to use the system and make comments, please see our help guide.