Greater Cambridge Local Plan Preferred Options
Search representations
Results for Endurance Estates - Caxton Gibbet Site search
New searchComment
Greater Cambridge Local Plan Preferred Options
CC/FM: Flooding and integrated water management
Representation ID: 59324
Received: 13/12/2021
Respondent: Endurance Estates - Caxton Gibbet Site
Agent: Carter Jonas
Representation Summary:
Policy CC/FM: Flooding and Integrated Water Management: The prevailing surface water strategy to be adopted is a network of positive drainage consisting of, and not limited to, the following SuDS features:
• Open swales / rills;
• Living Roofs
• Blue Roofs (these can also be used in areas of Living Roof)
• Attenuation Basins (with some localised pond/wetland features);
• Porous Paving (where feasible);
• Bio-retention areas; and
• Rainwater Harvesting.
help text
For instructions on how to use the system and make comments, please see our help guide.