Comment
Greater Cambridge Local Plan Preferred Options
Representation ID: 60751
Received: 13/12/2021
Respondent: Cambridge and South Cambridgeshire Green Parties
Welcome this policy, co-ordination between this policy and the Minerals and Waste Plan will be essential.
How could small-scale projects be brought within this policy?
We welcome this policy. Clearly, co-ordination between this policy and the Minerals and Waste Plan will be essential to avoid policy gaps and ensure the necessary infrastructure is in place to handle this recycling stream.
We are interested to know how small-scale projects (including incremental renovation works and retrofitting)
can be brought within this policy. The regular sight of skips filled with materials which could be recycled along with offcuts of new building materials demonstrates that action is needed.