Comment
Greater Cambridge Local Plan Preferred Options
Representation ID: 60506
Received: 17/12/2021
Respondent: Ely Group of Internal Drainage Boards
Representation Summary:
Need for investment in flood management infrastructure, and for effective management of water on site to ensure no detriment downstream. Full response letter attached.