Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59291

Received: 13/12/2021

Respondent: The National Trust

Representation Summary:

The availability of water supply and the pressure on the existing environment due to the low level of existing water resource is a key issue for the area. The scale of envisaged growth and development is out of line with the water resources available, and in terms of sewage capacity and nutrient burdens from discharges. This should be an intrinsic consideration throughout the Local Plan. The Local Plan needs to be future-proofed and requires agility to respond to the changing and increasing pressures that are likely to come forward for the water environment over the plan period.

Full text:

The availability of water supply and the pressure on the existing environment due to the low level of existing water resource is a key issue for the area. The scale of envisaged growth and development is out of line with the water resources available, and in terms of sewage capacity and nutrient burdens from discharges. This should be an intrinsic consideration throughout the Local Plan. The Local Plan needs to be future-proofed and requires agility to respond to the changing and increasing pressures that are likely to come forward for the water environment over the plan period.