Comment
Greater Cambridge Local Plan Preferred Options
Representation ID: 59120
Received: 13/12/2021
Respondent: Mr Michael Berkson
Representation Summary:
I fully endorse your comment on p 27 that delivery of the water infrastructure required to prevent further deterioration of local chalk aquifers is potentially a "deal-breaker" within the timescales of the Local Plan.
Full text:
I fully endorse your comment on p 27 that delivery of the water infrastructure required to prevent further deterioration of local chalk aquifers is potentially a "deal-breaker" within the timescales of the Local Plan.