Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59058

Received: 13/12/2021

Respondent: Royal Society for the Protection of Birds (RSPB)

Representation Summary:

The RSPB supports the policy direction set out. However, we believe that it could usefully be extended to include the Great Ouse river corridor which passes through the northern edge of the plan area. There may be floodplain restoration opportunities here as well as in the Cam catchment. The Environment Agency are currently undertaking a Gt Ouse Flood Storage and Conveyancing study to look further at opportunities for this.

Full text:

The RSPB supports the policy direction set out. However, we believe that it could usefully be extended to include the Great Ouse river corridor which passes through the northern edge of the plan area. There may be floodplain restoration opportunities here as well as in the Cam catchment. The Environment Agency are currently undertaking a Gt Ouse Flood Storage and Conveyancing study to look further at opportunities for this.