Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59007

Received: 13/12/2021

Respondent: Royal Society for the Protection of Birds (RSPB)

Representation Summary:

The new plan will set out significant requirements for Green Infrastructure, Biodiversity Net Gain and environmental design, which need to be reflected in the requirements placed on those elements of existing allocations which have yet not received planning permission. For example, the need for Northstowe to potentially support GI infrastructure in the Great Ouse Fenland Arc.

Full text:

The new plan will set out significant requirements for Green Infrastructure, Biodiversity Net Gain and environmental design, which need to be reflected in the requirements placed on those elements of existing allocations which have yet not received planning permission. For example, the need for Northstowe to potentially support GI infrastructure in the Great Ouse Fenland Arc.