Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 58767

Received: 13/12/2021

Respondent: Mr Jonathan Shanklin

Representation Summary:

Any biodiversity net gain calculations should be done by an accredited member of CIEEM. The calculations need to factor in that a “new” site will not support the same range of biodiversity as an old established site, even it is of greater area. A functioning ecosystem takes a long time to establish and much may be hidden, eg as fungal mycelia. To cover this a multiplicative factor, proportional to the age of the site being developed, should be used in any calculations for the proposed offsetting area.

Full text:

Any biodiversity net gain calculations should be done by an accredited member of CIEEM. The calculations need to factor in that a “new” site will not support the same range of biodiversity as an old established site, even it is of greater area. A functioning ecosystem takes a long time to establish and much may be hidden, eg as fungal mycelia. To cover this a multiplicative factor, proportional to the age of the site being developed, should be used in any calculations for the proposed offsetting area.