Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 58126

Received: 12/12/2021

Respondent: Mr Matthew Asplin

Representation Summary:

Map Fig 25: shows Existing and Proposed allocations outside this broad location, including North East Cambridge covered under Policy S/NEC.
It is noted that the corresponding Waste Water Treatment Works relocation process set out in Policy S/NEC is being led by Anglian Water under a separate process. However, map Fig 25 should also display for reference the proposed relocation site for the Waste Water Treatment Works in a similar manner to the NEC area, to provide proper context for the S/NEC Policy in terms of future land use and corresponding Green Belt cost, or neither until the DCO is approved.

Full text:

Map Fig 25: shows Existing and Proposed allocations outside this broad location, including North East Cambridge covered under Policy S/NEC.
It is noted that the corresponding Waste Water Treatment Works relocation process set out in Policy S/NEC is being led by Anglian Water under a separate process. However, map Fig 25 should also display for reference the proposed relocation site for the Waste Water Treatment Works in a similar manner to the NEC area, to provide proper context for the S/NEC Policy in terms of future land use and corresponding Green Belt cost, or neither until the DCO is approved.