Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 58069

Received: 12/12/2021

Respondent: Horningsea Parish Council

Representation Summary:

It is very disingenuous and lacking transparency to produce a local plan that does not mention the relocation of the fully functioning Cambridge Waste Water Treatment Plant to Green Belt, in order to unlock a brownfield site for a development project that was imagined for a living/working community prior to the effects of the global pandemic.

Full text:

It is very disingenuous and lacking transparency to produce a local plan that does not mention the relocation of the fully functioning Cambridge Waste Water Treatment Plant to Green Belt, in order to unlock a brownfield site for a development project that was imagined for a living/working community prior to the effects of the global pandemic.