Comment
Greater Cambridge Local Plan Preferred Options
Representation ID: 58067
Received: 12/12/2021
Respondent: Horningsea Parish Council
Representation Summary:
Carbon expenditure, emissions, and embedded carbon to decommission a fully operational waste water treatment plant and decontaminate site and build new plant within 1 mile of existing inclusive of transfer tunnels, HGV traffic etc., should be factored into carbon cost of fulfilling S/NEC Policy
Full text:
Carbon expenditure, emissions, and embedded carbon to decommission a fully operational waste water treatment plant and decontaminate site and build new plant within 1 mile of existing inclusive of transfer tunnels, HGV traffic etc., should be factored into carbon cost of fulfilling S/NEC Policy