Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 57849

Received: 11/12/2021

Respondent: Mrs Teresa Harrold

Representation Summary:

Far too much housing growth is planned for the GCSP over the next 21 years detrimentally affecting the carbon budget. Water supply is already a serious concern for the existing housing and this problem needs to be addressed before adding more housing/development in the area

Full text:

Far too much housing growth is planned for the GCSP over the next 21 years detrimentally affecting the carbon budget. Water supply is already a serious concern for the existing housing and this problem needs to be addressed before adding more housing/development in the area